Download presentation
Presentation is loading. Please wait.
Published byJohnathan Stewart Modified over 6 years ago
1
Advanced hybrid detectors in Oxford: Facilities, experience, and interests Arndt, Bortoletto, Placket, Shipsey
2
Oxford Particle Physics Microstructure Detector Laboratory - OPMD
Currently Under construction – expected completion in Oct 2015 Focused on generic R&D and ITK Strip/Pixel Module production Clean Rooms 160 m2 of class 10,000 clean room 35 m2 of class 100 clean room Vacuum, Dry Compressed Air, Nitrogen & DI water as piped services Equipment Semiprobe 300mm probe station with thermal chuck (delivery this month) Hesse Bondjet 820 automatic wire bonder (delivery expected Oct/Nov) Dage 4000Plus pull tester (Oct/Nov) OGP CNC500 Smartscope optical metrology system (Oct/Nov) Keyance VHX500 digital inspection microscope (Oct/Nov) Weiss Thermal chamber WTL100 (+50oC –> -50oC) (Oct/Nov) Henniker Bench top Plasma Cleaner (Oct/Nov) Aerotech pick and place assembly gantry (Sept/Oct) Nordson EFD Glue Robot (Delivered this week) HV-CMOS Infrastructure 09 May 2018
3
Oxford Particle Physics Microstructure Detector Laboratory - OPMD
Currently Under construction – expected completion in Oct 2015 Focused on generic R&D and ITK Strip/Pixel Module production Clean Rooms 160 m2 of class 10,000 clean room 35 m2 of class 100 clean room Vacuum, Dry Compressed Air, Nitrogen & DI water as piped services Equipment Semiprobe 300mm probe station with thermal chuck (delivery this month) Hesse Bondjet 820 automatic wire bonder (delivery expected Oct/Nov) Dage 4000Plus pull tester (Oct/Nov) OGP CNC500 Smartscope optical metrology system (Oct/Nov) Keyance VHX500 digital inspection microscope (Oct/Nov) Weiss Thermal chamber WTL100 (+50oC –> -50oC) (Oct/Nov) Henniker Bench top Plasma Cleaner (Oct/Nov) Aerotech pick and place assembly gantry (Sept/Oct) Nordson EFD Glue Robot (Delivered this week) HV-CMOS Infrastructure 09 May 2018
4
Planar sensors Beam tests Lab I-V measurements
Participated in the evaluation of thin n-on-p sensor fabricated on a variety of substrates for the CMS Hamamatsu campaign Beam tests Lab I-V measurements HV-CMOS Infrastructure 09 May 2018
5
3D sensors Beam test results after 7 E14 neq/cm2) Normal incidence
SINTEF, FBK, CNM Beam test results after 7 E14 neq/cm2) Normal incidence 200 incidence
6
Interests and Possible Contributions
We are especially interested in: Task 7.4 Detector validation for tracking devices Characterisation of 3D and planar hybrid pixel sensors with laboratory measurements and beam-tests to demonstrate sufficient tracking capabilities in the high radiation and occupancy environment of the ATLAS and CMS pixel systems at HL-LHC Validation of thin hybrid pixel detectors for application at the Vertex pixel detector at CLIC with laboratory measurements and test-beam campaigns, after hybridisation to the CLICpix readout chips HV-CMOS Infrastructure 09 May 2018
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.