1 Software lifecycle support and management system for safety-related signalling systems
Lei Chen Research institute of general technology Beijing National Railway Design and Research Institute of Signal and Communication Co. Ltd. 2018/5/9

2 INTRODUCTION Major challenges Task analysis approach
The software lifecycle support and management system for safety-related signalling system The architecture of SwSLMS Key innovations Trial use Conclusion 2018/5/9

3 MAJOR CHALLENGES Demanding project schedule and high RAMS requirement
Coordination of different roles Information explosion and information islands Development assistance Time consuming testing Knowledge share and reuse 2018/5/9

4 TASK ANALYSIS APPROACH
EN50128 CRSCD 2018/5/9

5 TASK ANALYSIS APPROACH
Attribute Contents Action No. Pre-actions , Needed information DOORS Module URL and baseline number Word document version number, SVN URL and Revision Effected actions * Who’s responsible The writer of the document Done automatically by computer? No, human Non-conformities 27 non-conformities for word and DOORS information mismatch or leave out in CM audit in R&D centre Can be done by computer Yes 2018/5/9

6 The architecture of SwSLMS
2018/5/9

7 Key innovations Quality gate control UUM Access and role control
2018/5/9

8 Key innovations Information fusion 2018/5/9

9 Key innovations Development assistance Collaboration development tool
Code completion tool Instant code rules check-up tool Covered 60% of the coding standards and coding style requirements Cross compile tool and debugger 2018/5/9

10 Key innovations Automatic testing 2018/5/9

11 Key innovations Component based knowledge base
A new concept of COMPONENT software requirements interfaces, designs codes, test cases test scripts test records relevant documents 2018/5/9

12 Trial use Zone control certre(ZC) Software test stage
Functional test cases: 694 One round of testing Original: 20 test cases per day per person, totally 35 man-day SwSLMS: 8 machine hours 2018/5/9

13 CONCLUSION Fully compliant with the new EN50128.
Tentative effort to solve the contradiction of limited time of a project and high RAMS performance requirements Based on human factor study and task analysis Positive comments on SwSLMS 2018/5/9

14 Thank you for your attention!