Download presentation
Presentation is loading. Please wait.
1
IBPIO Programme report
Gilbert EMZIVAT, MF - DT/DSO/CMM/D LA JOLLA (USA), 13-14/10/2016
2
IBPIO DB shipping lanes
IBPIO19 report DBCP
3
IBPIO DB Deployments July 2015 – June 2016
IBPIO19 report DBCP
4
IBPIO DB deployed (1) Year SVP SVP-B SVP-BW FGGE FGGE-W Others Total
30 42 5 3 80 …/… 62 65 1 129 47 113 161 40 125 7 12 184 * 18 92 4 38 152 31 128 180 146 171 6 227 233 20 134 154 23 273 296 21 120 212 660 1943 28 33 19 94 2777 IBPIO19 report DBCP
5
IBPIO DB deployed (2) SVP-B : 39 Iridium 95 Argos
IBPIO19 report DBCP
6
IBPIO DB Number of buoys by owners
MF 25 BOM 4 IBPIO19 report DBCP
7
IBPIO DB Number of buoys by owners, other than GDC (upgrades excluded)
IBPIO19 report DBCP
8
IBPIO DB Operating buoys
Target : 150 IBPIO19 report DBCP
9
IBPIO DB Lifetime (FR network)
IBPIO19 report DBCP
10
IBPIO DB Trajectories in June 2016
AP SST only IBPIO19 report DBCP
11
IBPIO DB Trajectories in June 2015
AP SST only IBPIO19 report DBCP
12
IBPIO DB Iridium buoys by June 2016
ARGOS ARGOS 3 Unknown 49 Iridium SVP-B (17 BoM - 7 GDC - 25 GDC/MF) and 48 Iridum SVP deployed ( ) IBPIO19 report DBCP
13
IBPIO DB number of observations (1)
Target : 3600 IBPIO19 report DBCP
14
IBPIO SVPB density for 2016 IBPIO19 report DBCP
15
IBPIO SVPB data availability June 2016
Mean monthly (2016/06) pressure data availability Index (top): 100= 8 obs per day per 500 km x 500 km area of SHIP and BUOY reports. Percentage of BUOY reports (bottom) Index (top): 100= 8 obs per day per 500 km x 500 km area of SHIP and BUOY reports. Percentage of BUOY reports (bottom) IBPIO19 report DBCP
16
IBPIO DB Data Timeliness (1)
Target : 3600 IBPIO19 report DBCP
17
IBPIO DB Data Timeliness (<50min) (2)
IBPIO19 report DBCP
18
IBPIO DB Data Timeliness (<100min) (3)
IBPIO19 report DBCP
19
IBPIO DB Data Timeliness (GTSdelays) (4)
<= 60 min min min min min > 300 min IBPIO19 report DBCP
20
IBPIO DB Data Quality IBPIO19 report DBCP
21
IBPIO DB RMS IBPIO19 report DBCP
22
Quality Control http://www.meteo.shom.fr/qctools
IBPIO19 report DBCP
23
DB Day to day monitoring (1)
Criteria GTS data transmission was stopped IBPIO19 report DBCP
24
DB Day to day monitoring (2)
IBPIO19 report DBCP
25
IBPIO Moored buoys AP SST only IBPIO19 report DBCP
26
IBPIO MB operating buoys
IBPIO19 report DBCP
27
IBPIO MB Data Timeliness
IBPIO19 report DBCP
28
Day to day MB monitoring (2300001)
IBPIO19 report DBCP
29
RAMA Moored buoys IBPIO19 report DBCP
30
RAMA Moored buoys Maintenance
Between July 2015 and June RAMA surface moorings and 5 ADCP moorings were serviced. During this time 126 sea days were provided in support of these RAMA sites. Sea days were provided by India, Indonesia and the US. One new RAMA mooring site was implemented near 4°S, 57°E. Twenty (20) surface drifters (provided by the Global Drifter Program) and 2 Argo floats (provided by PMEL’s Argo project) were deployed on RAMA cruises in the past year. A PMEL ATLAS mooring in the Bay of Bengal was enhanced to include CO2 measurements for the third year in a row. This effort was a collaborative effort of PMEL, BOBLME and NIOT. In support of the Ocean Tracking Network 12 RAMA moorings were instrumented with acoustic recorders provided by Dalhousie University. IBPIO19 report DBCP
31
RAMA Moored buoys Network (1)
36 MB for RAMA, 76% of the planned 46 site array IBPIO19 report DBCP
32
RAMA Moored buoys Network (2)
IBPIO19 report DBCP
33
RAMA Moored buoys Network (3)
IBPIO19 report DBCP
34
Informations IBPIO19 report DBCP32-2016
IBPIO19 report DBCP
35
Questions ? Many thanks ! Contact : Gilbert EMZIVAT
Chef du Centre de Météorologie Marine / Head of the CMM Meteo-France - DSO Centre de Meteorologie Marine 13, rue du Chatellier CS 12804 29228 BREST CEDEX 2 (FRANCE) ****************************************** Tel: +33 (0) Fax: +33 (0) / IBPIO19 report DBCP
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.