UoR Library Refurbishment – Early Works
3 week rolling look ahead from 29/08/16 Basement Week 3 W/C 12/9/16 Wayler beam Install RMD Prop Install Permit to Load – L&C Week 1 W/C 29/08/16 Waterproofhoarding Week 2 W/C 5/9/16 Commence installation of Propping Paint hoarding
2
UoR Library Refurbishment – Early Works
3 week rolling look ahead from 29/08/16 Ground Floor Week 3 W/C 12/09/16 Soft strip ongoing Week 1 W/C 29/08/16 Soft Strip Commence Week 2 W/C 5/9/16 Install Doors Commence installation of propping Week 1 W/C 29/08/16 Complete Hoarding to Core 2 Complete Steelwork Decorate Hoarding Asbestos Removal Install Door Frames Week 3 W/C 12/09/16 Complete propping
3
UoR Library Refurbishment – Early Works
3 week rolling look ahead from 29/08/16 First Floor Week 2 WC 5/9/16 Complete Hoardings Commence installation of propping. Install Doors Week 1 W/C 29/08/16 Complete Hoarding Decorate Hoarding Install Door Frames Week 3 W/C 12/09/16 Weatherproof hoarding. Complete propping
4
UoR Library Refurbishment – Early Works
3 week rolling look ahead from 29/08/16 Second Floor Week 1 W/C 29/08/16 Complete hoarding including doors Commence propping Week 3 WC 12/9/16 Propping Complete Week 3 W/C 12/09/16 Decorate hoarding Week 1 W/C 29/08/16 Complete hoarding Remove furniture Week 2 WC 5/9/16 Complete decorating hoarding Hand area back Week 3 W/C 12/9/16 Hoarding ongoing Temporary Power and Data
5
UoR Library Refurbishment – Early Works
3 week rolling look ahead from 29/08/16 Third Floor Week 2 WC 5/9/16 Move Furniture Week 2 WC5/9/16 Complete decorating hoarding Hand area back Install propping Week 3 W/C 12/09/16 Complete propping Commecne soft strip Week 1 W/C 29/08/16 Complete hoarding
6
UoR Library Refurbishment – Early Works
3 week rolling look ahead from 29/08/16 Fourth Floor Week 1 W/C 29/8/16 Hoarding to be built Week 2 W/C 5/9/16 Commence hoarding Week 3 W/C 12/09/16 Complete hoarding Install propping Week 1 W/C 29/08/16 Hoarding installation complete
7
UoR Library Refurbishment – Early Works
3 week rolling look ahead from 29/08/16 Fifth Floor Week 1 W/C 29/08/16 Commence hoarding Week 3 W/C 12/09/16 decorate hoarding Install propping
8
UoR Library Refurbishment – Early Works
3 week rolling look ahead from 29/08/16 Roof / Plant Level No Works
9
UoR Library Refurbishment – Early Works
3 week rolling look ahead from 29/08/16 Cycle Shed Week 3 W/C 12/09/16 Slab and drainage On Hold Week 2 W/C 5/9/16 Install Hoarding Commence groundworks
10
UoR Library Refurbishment – Early Works
3 week rolling look ahead from 29/08/16 Site Establishment Week3 W/C 12/09/16 Cabin delivery Week 1 W/C 29/08/16 Trench for temporary services Week 1 and 2 W/C 29/08/16 and W/C 5/9/16 Foundations and drainage On Hold Week 1 W/C 29/08/16 Complete Bin Store Bin Store
11
UoR Library Refurbishment – Early Works
3 week rolling look ahead from 29/08/16 Emergency Contact Numbers Name Role Number Site Office TBA Prabh Solotera Senior Construction Manager Dom Winterburn Logistics Manager Kinga Matanina Assistant Construction Manager Richard Slade Project Manager Alan O’Garro Senior Technical Services Manger Graeme White Project Director
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.