Download presentation
Presentation is loading. Please wait.
Published byMelanie Stafford Modified over 6 years ago
1
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
January 17-19, 2017 JW Marriott Austin Austin, TX
2
Subcommittee on Well Cements (SC10) Agenda
Tuesday, January 17th, 2017 8:30 8:45 Opening and Introductions 8:45 9:15 WG on API RP10F Revision 9:15 10:00 TG on Cooperative Testing/TG on API Monogram Program/WG on Compressive Strength 10:00 10:15 BREAK 10:15 11:00 Calibration Document 11:00 11:30 Bulletin E3 11:30 1:00 LUNCH 1:00 2:00 WG on Comparison of Conditioning Practices for Cements 2:00 3:00 WG API Spec 10D Revision 3:00 3:15 BREAK 3:15 4:30 WG on Testing of Well Cementing Composites 2
3
Subcommittee on Well Cements (SC10) Agenda
Wednesday, January 18th, 2017 8:30 9:30 WG on HPHT Rheology 9: :00 WG on Foam Cement 10:00 10:15 BREAK 10:15 10:45 WG on Evaluation of NAF Removal 11:15 11:45 WG on Triaxial Mechanical Properties of Cement 11:45 1:00 LUNCH 1: : WG on Well Abandonments 2:00 2:30 Rewrite of 10TR1 2:30 3:00 WG on Stage Cementing Equipment 3: :30 SC 10 General Meeting
4
Subcommittee on Well Cements (SC10) Agenda
Thursday, January 19th, 2017 8:30 11:30 API Spec 10A - API RP 10B-2 -- Compile and Document all Changes 11:30 1:00 Lunch 1:00 4:00 RP65-1
5
SC-10 General Meeting Agenda:
Subcommittee on Well Cements (SC10) Wednesday, January 18th, 2017: General Meeting SC-10 General Meeting Agenda: Reading & Approval of Minutes from San Francisco Reports of the Task/Work Groups Old Business New Business Adjourn
6
Minutes from Washington, DC
Subcommittee on Well Cements (SC10) Wednesday, January 18th, 2017: General Meeting Minutes from Washington, DC
7
Motion to Accept the Minutes as Posted on the API SharePoint Site?
Subcommittee on Well Cements (SC10) Wednesday, January 18th, 2017: General Meeting Motion to Accept the Minutes as Posted on the API SharePoint Site?
8
Reports of the Task/Work Groups
Subcommittee on Well Cements (SC10) Wednesday January 18th, 2017: General Meeting Reports of the Task/Work Groups
9
Subcommittee on Well Cements (SC10) Wednesday, January 18th, 2017: General Meeting
Reports of the Task/Work Groups: WG on API RP 10F Conversion – G. Benge TG on Cooperative Testing / TG on API Monogram Program / – B. Ulrich WG on Compressive Strength – G. De Bruijn Calibration Document – R. Lukay Bulletin E3 – J. Reid WG on Comparison of Conditioning Practices for Cements – L. Padilla WG on API Spec 10D Revision – J. Hebert TG on Performance Testing Well Cementing Composites – H. Plack WG on HTHP Rheology – R. Lukay WG on Foamed Cement – E. Cunningham WG on Evaluation of NAF Removal and Water Wetting Spacers – P. Sonnier WG on Triaxial Mechanical Properties of Cement – A. Bois WG on Well Abandonment – J. Shine Rewrite of 10TR1 – G. De Bruijn WG on Stage Cementing Equipment – A. Sanchez Motion to Accept Reports
10
Subcommittee on Well Cements (SC10) Wednesday, January 18th, 2017: General Meeting
Old Business
11
Subcommittee on Well Cements (SC10) Wednesday, January 18th, 2017: General Meeting
Publication of API Specification 10A “Cements and Materials for Well Cementing” 24th Edition, December 2010 Document reaffirmed in December 2015 25th Edition is currently in the editing stage prior to re-ballot. Publication of API RP 10B-2 “Testing Well Cements” Publication of RP 10B-2, 2nd Edition April Comments are being logged, reviewed and discussed with set path forward after “Special Work Session” on Thursday, January 21st, 2016 Future revisions to include: Stirred Fluid Loss Testing, Fluid Loss Screens and elimination of inconsistencies between API Spec 10A and RP 10B-2 New WG was formed to revise/rewrite Sections 10, 11 & 12, specifically with regards to atmospheric vs HTHP slurry conditioning requirements.
12
Subcommittee on Well Cements (SC10) Wednesday, January 18th, 2017: General Meeting
Publication of API RP 10B-3 “Testing of Well Cements used in Deepwater Well Construction” 2nd Edition, January 2016 Publication of API RP 10B-4 “Preparation and Testing of Foamed Cement Formulations at Atmospheric Pressure”, 2nd Edition, October 2015 Technical Report (TR) on Foam Cement Behavior under Well Conditions is the second phase of this WG charge. Work progressing.
13
Subcommittee on Well Cements (SC10) Wednesday, January 18th, 2017: General Meeting
API RP 10B-5, 1st Edition, “Determination of Shrinkage and Expansion of Well Cement Formulations at Atmospheric Pressure”, April 2005 Document reaffirmed in April 2015. API RP 10B-6, 1st Edition, “Determining the Static Gel Strength of Cement Formulations”, August 2010 Document reaffirmed in April Document revision is underway by Work Group.
14
Subcommittee on Well Cements (SC10) Wednesday, January 18th, 2017: General Meeting
Rewrite of API Spec 10D, 6th Edition March 2002 “Bow Spring Casing Centralizers” Document reaffirmed April Review and update API Spec 10D to include performance testing requirements for centralizers that are to be used in applications where they are run through restrictions that are smaller than the hole size in which they are to be set. API RP 10D-2, 1st Edition, “Recommended Practice for Centralizer Placement and Stop Collar Testing”, August 2004 Document reaffirmed in April 2015. Rewrite of API RP 10F, 3rd Edition April 2002 “Performance Testing of Cementing Float Equipment” WG will publish API Specification 10F, 4th Edition which will replace and make obsolete API RP 10F, 3rd Edition. This document will include required specifications and the associated performance testing protocols for the manufacturing of Cement Float Equipment. Document was balloted and is currently in comment resolution.
15
Subcommittee on Well Cements (SC10) Wednesday, January 18th, 2017: General Meeting
Published Technical Report 10TR6, “Evaluation and Testing of Mechanical Cement Wiper Plugs”, 1st Edition, July 2015 10TR7 on “Mechanical Behavior of Cement” Document has been balloted. Ballot results and comments have been resolved and forwarded for recirculation.
16
Subcommittee on Well Cements (SC10) Wednesday, January 18th, 2017: General Meeting
API RP 65, 1st Edition, “Cementing Shallow Water Flow Zones in Deepwater Wells”, September 2002 Reaffirmed 2012, currently being revised by Work Group. Expected publishing date Q1, 2017 as API RP 65-1. API Standard 65-2, 2nd Edition, “Isolating Potential Flow Zones During Well Construction”, December 2010 Reaffirmed November 26th 2016.
17
Subcommittee on Well Cements (SC10) Wednesday, January 18th, 2017: General Meeting
API Bulletin E3, 1st Edition, Environmental Guidance Document: “Well Abandonment and Inactive Well Practices for U.S. Exploration and Production Operations”, January 1993 Reaffirmed 2000, serve as a framework document for the newly formed Work Group on Well Abandonment. Rewrite is currently in for final editing.
18
Subcommittee on Well Cements (SC10) Wednesday, January 18th, 2017: General Meeting
New Business
19
Subcommittee on Well Cements (SC10) Wednesday, January 18th, 2017: General Meeting
API SC10 Recognition Robert Darbe – for all his years of service to SC10
20
Subcommittee on Well Cements (SC10) Wednesday, January 18th, 2017: General Meeting
New Business: New Work Items John Buflod – API
21
Subcommittee on Well Cements (SC10) Wednesday, January 18th, 2017: General Meeting
Future Meetings:, 2017 – E&P Standards Conference: June 26-30, Calgary, Alberta 2018 – E&P Standards Conference: Jan 22-26, San Antonio, TX 2018 – E&P Standards Conference: June 11-15, Denver, CO
22
Subcommittee on Well Cements (SC10) Wednesday, January 18th, 2017: General Meeting
Any Other New Business?
23
Subcommittee on Well Cements (SC10) Wednesday, January 18th, 2017: General Meeting
Motion to Adjourn 24
24
Thank you - Have a safe journey home! 2017 Exploration & Production
Winter Standards Meeting Subcommittee 10 January 17-19, 2017 JW Marriott Austin Austin, TX Thank you - Have a safe journey home!
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.