1 Help make energy efficiency easy, transparent and scalable.
Iowa Industrial Energy Group Spring Conference April 11, 2017 Audrey Bragg, Senior Policy Analyst

2 Disclaimer The information in this presentation has been prepared by and is the sole responsibility of E4TheFuture. E4TheFuture is not a project partner and does not represent DOE, the six states, and/or partners TCR and NASEO. As such, the views expressed in this presentation are strictly those of E4TheFuture and may not coincide precisely with information provided by the above-referenced project, participating states, or project partners. Audrey Bragg, Senior Policy Analyst, E4TheFuture, serves as member of the Steering / Advisory Committee for the above-referenced project; this presentation is not paid for under the DOE award.

3 Agenda Iowa Energy Jobs What is the NEER? Key Concepts
Voluntary Market Application in Iowa Question & Answer

4 Iowa energy jobs

5 Clean Energy v. Coal & Gas
According to the Department of Energy’s 2017 Jobs Report

6 Clean Energy Breakdown
4% (1,022) Storage 0% (133) Smart Grid 0% (13) Hydro 16% (3,859) Wind 3% (745) Solar 77% (18,845) Energy Efficiency

7 Developmental Process
What is neer?

8 Question #1 Are you familiar with the NEER project? Yes No

9 Question #2 Are you familiar with the M-RETS and Renewable Energy Certificates (RECs) Yes No

10 State Initiative on Principles and Governance
Two-year initiative to define: NEER Principles and Operating Rules Steering/Advisory Committee to develop and finalize Multi-stakeholder Working Group ensures Principles and Rules meet the needs of all stakeholders Demonstration software developed to inform rules Roadmap for state adoption and implementation Key functional platform components Funded though U.S. DOE 2015 State Energy Program Award to Tennessee

11 The NEER Framework Provider Account EE Project Asset Output
Certificates Transaction Tracking Retirement

12 NEER Account Structure
Registration and Reporting Asset Output Log Active Instruments Retired Instruments Commoditization and Trading

13 EE Project Registration & Reporting is COMPLICATED
Inspection of installation Prove ownership Prove no double counting EM&V Plans EM&V Studies Technical Reference Manuals Third Party Verification

14 NEER Value Added: a Digital Platform
“Off the Shelf” standard elements of EE Project registration & reporting Customization to meet a Jurisdiction’s individual needs

15 State Initiative on Principles and Governance Timeline
Timeframe Task March – April 2016 Formation of Multi-stakeholder Working Group & Steering/Advisory Committee April 2016 – February 2017 Multi-stakeholder Working Group to draft NEER Principles and Operating Rules April – May 2017 Public comment period for draft NEER Principles and Operating Rules September 2017 Final roadmap for state adoption and implementation October 2017 Key functional platform requirements

16 Key concepts

17 Question #3 Are you familiar with the Common Application for college?
Yes No

18 Common platform – win/win for colleges and applicants
Colleges retain decision authority

19 Measure to Fit the Task

20 Measuring Energy Efficiency to Fit the Task
Savings projections based on modeling for use in consumer education Estimated EE savings for report based on deemed savings for a ratepayer-funded program annual report Guaranteed savings for a Performance Contract Third-Party Verified savings for commoditization into tradable certificates Qualification to bid into and get paid based on a Forward Capacity Auction Demonstrate compliance with Clean Air Act requirement

21 Full Disclosure of Measurement Methodology

22 NEER QA/QC Framework Registration & Reporting
Who is authorized to submit, review and approve different documents What documents need to be submitted Where documents are archived When have all the steps been completed and all parties agree the quantity savings number is acceptable

23 NEER QA/QC Protocol: Define the field
EPA Model NEER Enhanced QA/QC NEER Basic QA/QC Eligibility & EM&V Standard Accredited Independent Verifier Self- Report Verification

24 Brand Potential NEER Enhanced QA/QC NEER Basic QA/QC

25 How to participate?

26 State Initiative on Principles and Governance Timeline
Timeframe Task March – April 2016 Formation of Multi-stakeholder Working Group & Steering/Advisory Committee April 2016 – February 2017 Multi-stakeholder Working Group to draft NEER Principles and Operating Rules April – May 2017 Public comment period for draft NEER Principles and Operating Rules September 2017 Final roadmap for state adoption and implementation October 2017 Key functional platform requirements

27 PUBLIC COMMENT PERIOD April 3rd – May 31st
Questions? Thank you! For more information, please contact: Audrey Bragg Senior Policy Analyst E4TheFuture PUBLIC COMMENT PERIOD April 3rd – May 31st Visit for More Information 27


Download ppt "Help make energy efficiency easy, transparent and scalable."

Similar presentations


Ads by Google