Download presentation
Presentation is loading. Please wait.
Published byKelley Griffith Modified over 6 years ago
1
ОАО «Енисейская ТГК (ТГК-13)» филиал «Абаканская ТЭЦ»
Oleg Malyshev student:FE14-01B
2
History Construction of Abakan thermal power plant began in 1972 with the construction of the production building peak-starting the boiler. 10 years after the start of construction, Abakan Thermal electric power plant was put into operation in 1982 and had one boiler BKZ- 420 Barnaul Boiler Plant and the 65 MW turbine generator. April 18, 1982 was developed the first megawatt-hour of electricity. This day is considered the birthday of Abakan thermal power plant. Currently, Abakan Thermal electric power plant has an installed electric capacity of 270 MW.
3
The structure of the company
*Abakan (Khakassia, Tyva Republic, a part of the Krasnoyarsk Territory) *Barnaul (Altai Territory) *Kuzbass (Kemerovo region) *Krasnoyarsk (Krasnoyarsk Territory)
4
HR policy of the company.
General Director of LLC "Siberian Generating Company" (performs the functions of the sole executive body of TGC-13) Mikhail Kuznetsov Varfolomeyevich . Chairman of the Board of Directors - Bolshakov Andrey Nikolaevich . Deputy General Director of LLC "Siberian Generating Company" - the director of the Krasnoyarsk branch of LLC "Siberian Generating Company", the representative of JSC "Yenisei TGC (TGC-13)" - Alexander E. Schlegel. The main activities of the company are: - supply (sale) of electricity, steam and hot water (thermal energy) at the established tariffs in accordance with electrical and heat loads; - The production of electricity; - The production of steam and hot water (thermal energy); - Procurement (purchase) of electric energy at the wholesale and retail electricity (capacity) market; - Procurement (purchase) of thermal energy from third parties; - The implementation of thermal energy to consumers, including power sales organizations. The total installed electric capacity of the enterprises included in the JSC "Yenisei TGC (TGC-13)", is MW. Installed heat capacity - 3,017.4 Gcal / h. The main fuel for the stations of the company is lignite. Generation in 2015 was million kWh of electricity and 7,219 thou. Gcal of thermal energy.
5
Vacancies. Title: project to consolidate the expert
Contract type: Permanent Location: Kemerovo region Industry: TGC Kemerovo Contacts: Kemerovo, Kuznetskiy avenue, 30 Job published: 26 December 2016
6
Title: Specialist 1 cat. modeling and mathematical analysis on the wholesale market
Contract type: Permanent Location: Kemerovo region Industry: TGC Kemerovo Contacts: Job published: 08 December 2016
7
Title: Head of Division 1C of SPP
Contract type: Permanent Location: Krasnoyarsk (Krasnoyarsk Krai) Industry: Krasnoyarsk, "Krasnoyarsk branch of LLC" Siberian Generating Company " Contacts: Job published: 01 December 2016
8
Thank you for your attention
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.