1 Beam instrumentation MDs
T. Lefevre on the behalf of the BI group LSWG 2 September 2014

2 Outline Review of BI MD activities during Run 1
BI MD requests for Run 2 Conclusions LSWG 2 September 2014

3 Beam Instrumentation MDs
What is done in MDs is what cannot be done parasitically during normal beam operation and initial beam commissioning Special beam conditions e.g. larger beam emittance using ADT blow-up or different bunch length Local Orbit bumps or K-modulation e.g. for cross-calibration of beam profile monitors, BPM or FBCT studies Intensity scan (scraping) e.g. for BPM or FBCT sensitivity ranges study RF frequency change e.g. for strip-line BPM directivity study in LSSs LSWG 2 September 2014

4 Beam Instrumentation MDs
During each MDs period – 8h BI Shift 4-5 different activities per shift Some in parallel whenever applicable Usual suspects BCT, BPM, BSRT, BGI, BWS and Schottky Typical MDs: First part with beam tests at injection Ramp and beam tests at flat-top LSWG 2 September 2014

5 Beam Instrumentation MDs
Study the performances & limitations of operational devices Understand / Solve issues that arises during Beam Operation e.g. BSRT Extraction Mirror heating or FBCT beam position dependency Study the impact of known limitation e.g. non-linearity corrections of BPM readings, Test and develop new or modified instruments Develop devices not yet operational e.g. Schottky, LDM, dI/dt, .. Test hardware modifications e.g. BSRT gated cameras, LDM optimisation Test firmware modifications e.g. Modified Interlock BPM firmware Commission new Instruments e.g. Matching Monitors LSWG 2 September 2014

6 Results from BI MD - Run1 BSRT / WS calibration Calibration BSRT - WS
Injected 12 bunches per beam with emittance as small as possible Use ADT to blow-up single bunches Different ADT strength, excitation time on different bunches  circulating bunches with emittance spread in the 1.5 – 5 um range Measure with WS and BSRT Calculate BSRT magnification and point spread function to match WS Emittances after calibration LSWG 2 September 2014

7 Results from BI MD - Run1 Matching Monitor Preliminary Results
Inject, circulate for 1000 turns max and dump a single bunch with about 1e10p Insert the BTVM.6L4.B1 screen and observe the monitor response turn by turns Repeat the experiment while inserting at the same time the BTVM.7L3.B1 screen to characterize any blow-up induced by scattering on the screens themselves Remove BTVM.7L3.B1 and repeat inject and dump several times, while smoothly increasing the bunch intensity up to 5e10p. With low intensity, offset injection trajectory to see the effect on the matching measurements (if time allows) I=4.48e10 I=2.23e10 I=4.5e9 LSWG 2 September 2014

8 Results from BI MD - Run1 BGI – B2 Injected 1368 nominal bunches
Set local gas pressure to 5.2e-9 Study H and V camera tilt vs beam axis Calibration with local orbit bumps +- 1mm Used ADT to blow-up 144b batches  Monitor with BGI avg blow-up LSWG 2 September 2014

9 BI situation after LS1 Modified Instruments during LS1
All of them .. Some more than other … e.g. Schottky monitor or BSRT B1, .. Including both Hardware, Firmware, Software changes New Functionalities and New Instruments ICT and BCTW for fast beam intensity monitoring dI/dt (Fast Beam Current Change Monitor - FBCCM) Diode Orbit system for Collimator BPM and more.. Beam Transfer Function using Tune monitor Instability Monitoring system and trigger Beam Gas Vertex (BGV) detector BSRT interferometer LSWG 2 September 2014

10 Requests for Run 2 All what will not be completed during the beam commissioning period for operational BI systems … BLMs were not part of BI MDs – Done in MPP MDs Already known requests: Directional Strip-line BPMs in LSSs: comp between DOROS and WBTN Bunch intensity study scraping nominal bunches DOROS, Interlock BPM, dIdt, .. Bunch length dependency of ICT & BCTW Running the beam instable (nominal bunches) Commissioning of Instability Monitoring triggering system CO bumps - BPM (non-linearity correction) Sensitivity of beam position for ICT & BCTW, Schottky monitors Resolution study of BSRT and WS (at injection and flat top) LSWG 2 September 2014

11 Requests for Run 2 Already known requests continued
dI/dt (FBCCM) commissioning plan with different beam intensities and energies done with TE-MPE-MS Emittance Blow-up using ADT Cross-calibration between BSRT & WS Test of new BSRT interferometer on B1 Investigating the possibility to cross-calibrate WS and BSRT using BTV in dump line Masking of BTV interlocks limited to safe beam? Can we extract and measure with BTV a nominal bunch at 6.5 TeV ? Commissioning of BGV Requiring gas injection In parallel to Van der Meer scans with SMOKE detector and BWS LSWG 2 September 2014

12 Conclusions During Run 1, BI MDs were extremely useful, at least for us, to better understand our devices Even if we assume a smooth re-commissioning of operational devices, we would already need several 8 hours shifts to assess the performance of new instruments using non-standard beam conditions Our proposal is to keep a minimum of one BI shift per MD period LSWG 2 September 2014

13 Thanks for listening LSWG 2 September 2014

14 Fringes ‘visibility’ contains information of proton beam size
BSRT – Interferometry (B1) New project in collaboration with KEK (T.Mitshuashi), SLAC (A.Fisher), CELLS-ALBA (U.Iriso) Interferometry: non-diffraction limited method widely used in electron machines to measure very small beam sizes Fringes ‘visibility’ contains information of proton beam size F.Roncarolo & Co 28 Aug 2014

15 Closed Orbit Bumps +-4mm @ WS and BSRT
Any new aperture and/or MPP constraint in 2015 to repeat bumps at injection and flat top? F.Roncarolo & Co 28 Aug 2014

16 WS-BSRT Commissioning Plan Overview
Time Beam Type Energy [GeV] Monitors Comments 0.450 6.5 BSRT WS Parasitic Pilot Check SW (automatisms, auto-gain, auto-steering, etc…) 4hrs Single Bunches ✔ (2hrs) Closed Orbit Bumps 8hrs Calibration of WS PM gain + filters settings (4hrs) Cross-Calibration. 6 bunches with different emittances (ADT blow-up?) Interferometry tests, only B1 Scrubbing Temperature + mirror deformation monitoring, reliability runs Trains 8hrs? Pilot? Single Bunch? Inject circulate (ramp?) and dump, monitor beam size on BTVSE and BTVD (To be investigated) 8hrs ? Single bunch K-Modulation, AC dipole. Need knowledge of optics at monitors, all energies. TBD with OP and ABP N.B.: BSRT Interferometry can be done in parallel to imaging BSRT mirror deformation monitoring can NOT be done in parallel to imaging F.Roncarolo & Co 28 Aug 2014

17 BSRTM (mirror) deformation monitoring
Shack-Hartmann mask When inserted (just after view port) excludes BSRA Deformation to be checked with low and high intensity Can we exclude BSRA during scrubbing and/or high intensity commissioning? Need MD time with high intensity and no BSRA (assuming MPP ok) ? F.Roncarolo & Co 28 Aug 2014

18 Wave front distortion measurements - Hartmann mask
T. Mitsuhashi Very cheap Not sensible to floor vibrations Need the mask as close as possible to the mirror  normally is ‘destructive’, can’t split light to other devices before the mask mask-screen lever arm as long as possible 28 Aug 2014 F.Roncarolo & Co

19 BSRT Interferometry commissioning
Slits out  test imaging Setup polarizer Find horizontal polarization only Check imaging resolution dependence on rectangular iris aperture Insert slit H Setup operational vertical aperture of rectangular iris Visibility vs slit separation Determine operational slit separation Repeat for V Test H and V measurements F.Roncarolo & Co 28 Aug 2014

20 Halo Monitoring via Sync light
Studies for HighLumi Coronagraph? Flipping Micro-Mirrors ? Project just starting, nothing defined, not clear if any tests in 2015 F.Roncarolo & Co 28 Aug 2014