DIVISION OF STATE SERVICES BUREAU OF CONTRACTS
4/05/06
2
Developing Request for Proposals (RFP) & Evaluation Instrument
May 2006
3
Agenda Defining Best Value Planning Your RFP RFP Components
RFP Evaluation and Selection Process Developing Clear Evaluation Instrument Instructions The Evaluation Criteria Sample Evaluation Criteria Completing the Procurement Package
4
Agenda Participants will learn: The concept of “best value”
Steps in planning a Request for Proposal (RFP) What should be included in an RFP Developing clear instructions for proposal reviewers Developing evaluation instrument to accompany RFP Components of a complete procurement package
5
Best Value Defined: §163 “A best value award is one which optimizes quality, cost, and efficiency and typically applies to complex services and technology contracts.”
6
So What Does Best Value Mean?
7
Planning Your RFP Develop a procurement strategy.
Start with the end in mind Develop a timeline for the procurement, including deliverable need dates Decide which elements of the procurement process will be utilized Evaluation process (evaluators) Other special circumstances that will need to be addressed Identify latest procurement rules and regulations and ensure they are incorporated into RFP
8
What Should Be Included In RFP
Description of administrative process A timeline First page of RFP should include a “Calendar of Events”: Date of RFP Issuance Date Questions and Answers are due Date Questions and Answers will be sent to bidders Deadline for Receipt of Proposals
9
What Should Be Included In RFP
Description of agency mission Requirements describing the services needed: Minimum qualifications Specifications of services to be provided Additional information required to be included in proposal References Contract terms and conditions
10
What Should Be Included In RFP
Procurement Policies, Statutes & Disclosures Appendix A Executive Order 127 (G-Bulletin 219) Vendor Responsibility (G-Bulletin 221) Sales and Compensating Use Tax Documentation (G-Bulletin 222) Procurement Lobbying Law
11
What Should Be Included In RFP
We strongly recommend publishing your mandatory contract provisions (agency or procurement specific) in the RFP. Rationale: Allows potential bidders to raise concerns prior to submitting a bid Eliminates vendors who are not willing to meet these mandatory provisions, thus: Avoiding prolonged and fruitless contract negotiations Saving agency time and money Preventing gaps in program / service delivery
12
What Should Be Included In RFP
Evaluation criteria must state: Minimum Qualifications (Pass / Fail) Fee schedules for cost; if multiple years, should define how fees should be provided (e.g., limit annual increase to Consumer Price Index (CPI) as published by the U.S. Dept. of Labor. Identify the specific index to be used). Identification of technical criteria to be evaluated Relative weight between technical and cost Recommend developing the evaluation instrument at the same time as the RFP
13
What Should Be Included In RFP
It is strongly recommended to inform your bidding audience (in the RFP) if the weight (points assigned) of one particular technical criterion far outweighs the others (for example, 40 of 70 points are assigned to experience) Why? This helps to keep all bidders on an “even playing field” and results in “balanced” proposals You want to award the contract to the “best” vendor, not simply to the vendor who “guessed” the best at what was important to you Refer to Handout No. 1 “Example of Good Evaluation Language for Your RFP”
14
What Should Be Included In RFP
Method of Award An example of clear language: Upon completion of the evaluation process, a contract will be awarded to the proposer whose proposal met all mandatory requirements and obtained the highest composite score, considering both cost and technical.
15
What Should Be Included In RFP
Method of Award Multiple Awards: RFP should reserve the right to make multiple awards. Where practical, the RFP should indicate the number of awards the agency expects to make. The RFP should also state how work will be assigned. The number of awards to be made and the allocation of work must be determined prior to receipt of proposals and documented in the evaluation instrument.
16
What Should Be Included In RFP
Include RFP language which: Allows agency to reject any and all bids Allows agency the right to request clarification and revisions Allows agency the right not to proceed with an award Establishes a minimum period of proposal validity that the bidder agrees to (example – price firm for 180 days and/or proposal irrevocable for 30 days)
17
Other Tasks to Complete
Procurement must appear in Contract Reporter at least 15 business days prior to the due date of proposals Develop solicitation list
18
Evaluation and Selection Process
19
Develop Clear Evaluation Instrument Instructions
All evaluation criteria must be established prior to the receipt of bids Very important to be clear Very important that relative weights match RFP weights
20
Develop Clear Evaluation Instrument Instructions
Establish the methodology to follow for evaluating all proposals: Identify the number of personnel and roles involved in the process Formalize the procedures to be followed Provide the sequence of events (timeline)
21
Develop Clear Evaluation Instrument Instructions
For math calculations, the evaluation instrument should define: How many decimal points the numbers will be extended Whether the numbers will be rounded up or down
22
Develop Clear Evaluation Instrument Instructions
The evaluation instrument must reflect any modifications to specifications as a result of an amendment to the RFP. For example, Q&A’s may necessitate a change to specifications. Changes must be issued via an amendment to the RFP and reflected in the evaluation instrument
23
Develop Clear Evaluation Instrument Instructions
The mandatory requirements checklist will be completed to ensure each vendor’s responsiveness to the RFP requirements. The agency will attempt to cure minor omissions or irregularities with the vendors. However, material deviations will result in the bidder being removed from consideration. Refer to Handout No. 2 “Proposal Checklist – Mandatory Requirements or Pass/Fail Portion”
24
Develop Clear Evaluation Instrument Instructions
Technical Evaluation Team: Mandatory requirements to be evaluated on Pass/Fail basis The breakdown of points assigned to each of your technical criteria must be in your evaluation instrument The same panel of evaluators will score the same criteria for each proposal
25
Develop Clear Evaluation Instrument Instructions
Technical Evaluation Team: If the technical evaluation requires the bidder to meet a minimum score in order to continue through the process, this information needs to be included in the evaluation instrument.
26
Develop Clear Evaluation Instrument Instructions
Technical Evaluation Team: Multiple Awards – The agency needs to define the basis for how this decision will be made in ADVANCE OF RECEIPT of the bids. Example: Award will be made to the three firms with the highest composite score. Example: Award will be made to the highest scoring firm for each region. Prior to making this decision, the agency will need to defend the need for multiple awards. This information should be dated and secured throughout the evaluation process.
27
The Evaluation Instrument
Individual Technical Evaluation Form The following should be included: Key indicating how to apply the points within the individual criteria Designation of firm being evaluated Evaluator designation
28
The Evaluation Instrument
Individual Technical Evaluation Form (2) The following should be included: Technical criteria and weight of the specific criteria Space for evaluators to place comments / notes Initials of individual evaluator and date completed
29
Develop Clear Evaluation Instrument Instructions
Financial Proposal Evaluation “Team” The basis for the financial proposal evaluation rankings will be the total price offer received from each offeror. The total price offers will be ranked with the low bid awarded the maximum points available. The remaining bids will be assigned scores based on the following formula: Low bid divided by bid being evaluated times the maximum number of points available
30
Refer to Handouts Number 3 “Price Offer Proposal Form A” and
Number 4 “Examples of Evaluation Criteria and Some Recommended Relative Weights to Use”
31
What’s Wrong With This Picture?
Enter Points as follows: Excellent Good Unacceptable All Available Points Half Available Points Zero Points Evaluation Summary Matrix Bidder A Bidder B Bidder C Experience (20 Points) 13 18 Approach (20 Points) 16 12 References (20 Points) 19 7 Total Technical (60 pts) 41 53 37 Cost (40 pts) 28 25 40 Total Composite Score 69 78 77
32
What’s Wrong With This Picture? (cont’d)
Range of points assigned were not allowed by the scoring matrix. Re-bid may not be necessary if agency can rescore proposals in accordance with the evaluation instrument.
33
Who Should Get the Award???? Technical 70% / Cost 30%
Bidder A Bidder B Proposed Price $100,000 $80,000 Cost Score 24 30 Technical Score 60 54 Total 84 State Finance Law S163, Paragraph 10a
34
Who Should Get the Award????
If both cost and technical scores are identical, who should get the award? “When price and other factors are found to be substantially equivalent, the determination of the commissioner or agency head to award a contract to one or more of such bidders shall be final. The basis for determining the award shall be documented in the procurement record.” State Finance Law S163, Paragraph 10a
35
What’s Wrong With This Evaluation?? Technical = 60 pts / Cost = 40 pts
Bidder 1 Bidder 2 Bidder 3 Bidder 4 Mandatory (Pass/Fail) Pass Fail Proposed Price $110,000 $95,000 $125,000 $140,000 Cost Score (OSC Recommended Formula 34.5 40.0 30.4 27.1 Technical Score 46.0 N/A 45.0 54.0 TOTAL SCORE 80.5 75.4 81.1 Winning Bid
36
What’s Wrong With This Evaluation?? Technical = 60 pts / Cost = 40 pts
Bidder 1 Bidder 2 Bidder 3 Bidder 4 Mandatory (Pass/Fail) Pass Fail Proposed Price $110,000 $95,000 $125,000 $140,000 Cost Score (OSC Recommended Formula 40.0 N/A 35.2 31.4 Technical Score 46.0 45.0 54.0 TOTAL SCORE 86.0 80.2 85.4 Winning Bid ** Bids which fail to meet mandatory requirements must be excluded from the evaluation process**
37
Very Important Reminders
Document evaluation notes and basis for assigning scores – assists in debriefing bidders A determination of vendor responsibility must also be performed
38
Very Important Reminders
After award decision is made, don’t forget to issue intent to award / non-award letters.
39
Elements of a Fully Documented Procurement Package
Copy of RFP and any amendments to RFP Solicitation list Certified Bid Tab Contract Reporter advertisement / evidence of exemption Evaluation instrument and matrix of scores and/or individual scoring sheets
40
Elements of a Fully Documented Procurement Package (2)
Copy of notice of intent to award / non-award letters Copy of winning proposal (cost and technical) Copies of all rejected proposals (cost and technical) Copies of all cost proposals for responsive bidders
41
Elements of a Fully Documented Procurement Package (3)
Civil Service approval for contracts with individuals Completed Procurement Record Checklist Memo of transaction Debriefing Notes
42
THANK YOU! Any questions and please don’t forget to fill out the evaluation forms!!!!