Transportation Safety Board
Underlying Factors in Subgrade Failures IRSC Conference Tokyo, November 2002
2
TSB Mandate Advance transportation safety by:
Conducting independent investigations Making findings as to causes, contributing factors and identify safety deficiencies Making recommendations to reduce or eliminate the safety deficiencies
3
Ashcroft (Conrad)
4
44.80 Parry Sound (Pointe au Baril)
5
34.55 Kingston (Coteau)
6
Nelson (Creston)
7
Subgrade Design & Construction
8
Drainage
9
Drainage
10
Inspection & Monitoring
11
Inspection & Monitoring
12
Roadbed Integrity Warning System
13
Recommendations Nakina (1992) & Conrad (1997)
Identification of sites susceptible to slope instability Review of current roadbed design criteria Adequacy of existing drainage systems Systems for monitoring roadbed integrity
14
Working Together on Railway Natural Hazards
Transport Canada Working Together on Railway Natural Hazards IRSC Conference Tokyo, November 2002
15
Transport Canada’s Role
Develop and administer policies, regulations and services for the best transportation system in the world for Canadians
16
TC Roles In Innovation Cycle
Gather intelligence Set safety standards & monitor compliance Do research and development Promote & fund innovation by external partners Broker and manage national & international partnerships Develop national visions and focus initiatives & resources Integrate innovations into its own operations
17
TC R&D Project Origins TC
Other federal government departments, agencies, and programs Provinces Industry Foreign governments Visionaries
18
The Natural Hazards Problem:
How to economically identify conditions that might be hazardous to train passage through rugged mountainous terrain and provide countermeasures.
19
Landslide Hazard Risk Mitigation
20
Electromagnetic Field Disturbance Rockfall Detection System
CN Lasha, near Lytton, B.C. CP near Golden, B.C. Instrument Case for test equipment Cable laid on wood ties, protected by 2” x 4”s Cable laid on concrete ties, protected by conduit
21
RRAB Workshop Slide and Washout Hazards: Managing Natural Risks on Railways May 1-3, 2002
22
Purpose of the Workshop
Stimulate collaboration and the investment of resources for new developmental programs to improve the management of natural risks from slide and washout hazards on railways
23
Workshop Sponsors Association of Regional Railways of Canada
Canadian National Railways Canadian Pacific Railway Industry Canada National Research Council Natural Resources Canada Office of Critical Infrastructure Protection and Emergency Preparedness Canada Railway Association of Canada Transport Canada VIA Rail Canada
24
Workshop Discussion Groups
Hazard characterization Establishing the context for research Hazard monitoring and detection technologies Research needs and priorities The way ahead
25
Workshop Will Be Considered a Success When. . .
New programs are planned, resourced, and begun within one or two years to tackle priorities identified in the workshop Significant improvements in managing natural risks from slide and washout hazards on railways are implemented and are bearing significant fruit within five years that trace their origins to the workshop
26
Planned Workshop Follow-Up
Prepare and distribute: Full workshop proceedings Package of speaker’s overheads Prepare and circulate proposed program: Initial sounding with expert panel members Circulate results to all participants Consult with participants on proposed program Develop and implement go-forward plan: Converge on supportable program Resource the program Form technical steering group & management regime Coalesce participants and partners
27
Ground Hazard Research Program
Risk Assessment Hazards classification system Database of incidents and case histories GIS based modeling tools for predicting events Critical weather thresholds that trigger events Field test methodologies for the Fraser Canyon and Thunder Bay rail corridors Risk Control Decision support tools for mitigating risk New technologies for monitoring and detection of events
28
End of Presentation
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.