Download presentation
Presentation is loading. Please wait.
1
TGv Closing Report March 2008
January 2005 doc.: IEEE yy/xxxxr0 March 2008 TGv Closing Report March 2008 Date: Authors: Dorothy Stanley, Aruba Networks Dorothy Stanley, Agere Systems
2
January 2005 doc.: IEEE yy/xxxxr0 March 2008 Abstract This presentation contains the IEEE TGv closing report for March 2008. Dorothy Stanley, Aruba Networks Dorothy Stanley, Agere Systems
3
Goals and Accomplishments for March 2008 Meeting
January 2005 doc.: IEEE yy/xxxxr0 March 2008 Goals and Accomplishments for March 2008 Meeting Hear Presentations – 2 proposals v-normative-text-for-channel-allocation-and-usage.doc v-normative-text-for-directed-multicast.doc Comment Resolution from LB 123 v-lb123-comments.xls Approved PAR Extension document v-par-extension.doc Dorothy Stanley, Aruba Networks Dorothy Stanley, Agere Systems
4
Output Documents 11-08-0425-00-000v-Orlando Closing Report
January 2005 doc.: IEEE yy/xxxxr0 March 2008 Output Documents v-Orlando Closing Report v-March-2008-agenda.ppt v-minutes-tgv-Orlando-meeting-Mar-08 Dorothy Stanley, Aruba Networks Dorothy Stanley, Agere Systems
5
Comment Processing Summary
January 2005 doc.: IEEE yy/xxxxr0 March 2008 Comment Processing Summary Total 1034 Technical 820 Editorial 214 Editor Done/To Do 0/1034 Comment resolutions adopted to date [36] Comments remaining 998 Dorothy Stanley, Aruba Networks Dorothy Stanley, Agere Systems
6
Goals for May 2008 LB Comment Resolution Presentations Letter Ballot
January 2005 doc.: IEEE yy/xxxxr0 March 2008 Goals for May 2008 LB Comment Resolution Presentations Letter Ballot Dorothy Stanley, Aruba Networks Dorothy Stanley, Agere Systems
7
Ad-Hoc, Telecons 2008 Ad-hoc April 28, 29, 30 in the San Jose area.
January 2005 doc.: IEEE yy/xxxxr0 March 2008 Ad-Hoc, Telecons 2008 Ad-hoc April 28, 29, 30 in the San Jose area. TGv Teleconferences April 1, 8, 15, 22, and May 6 at 1200 Eastern for 2 hours. Letter Ballot Dorothy Stanley, Aruba Networks Dorothy Stanley, Agere Systems
8
January 2005 doc.: IEEE yy/xxxxr0 March 2008 Motion – TGv ad-hoc Move to authorize a TGv ad-hoc, April 28, 29, 30 in the San Jose area. Moved on behalf of the TG TGv Motion: Allan Thomson/Qi Wang Result: 9-1-5 Dorothy Stanley, Aruba Networks Dorothy Stanley, Agere Systems
9
TGv Timeline Base line accepted: January 06 (Completed)
doc.: IEEE yy/xxxxr0 March 2008 TGv Timeline Base line accepted: January 06 (Completed) Submissions addressing objectives: Started in March 06 TG Ad-Hoc Draft Internal Review: October 06 (Completed) Internal review created 446 (Draft /1615) +95 (Draft /0310) (Draft /0594) comments Timeline: Last Updated Nov 07 Initial Working Group Letter Ballot: July completed Re-circulation Working Group Letter Ballot: May 08 Form Sponsor Ballot Pool: Nov 08 Initial Sponsor Ballot: January 09 Re-circulation Sponsor Ballot: March 09 Final WG/EC Approval: Sept 09 RevCom/Standards Board Approval: December 09 Dorothy Stanley, Aruba Networks Dorothy Stanley, Agere Systems
10
References March 2008 January 2005 doc.: IEEE 802.11-yy/xxxxr0
Dorothy Stanley, Aruba Networks Dorothy Stanley, Agere Systems
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.