Presentation is loading. Please wait.

Presentation is loading. Please wait.

Richard J. Tesarek Fermilab For the CDF Collaboration

Similar presentations


Presentation on theme: "Richard J. Tesarek Fermilab For the CDF Collaboration"— Presentation transcript:

1 Richard J. Tesarek Fermilab For the CDF Collaboration
CDF 2002 Toward Physics Richard J. Tesarek Fermilab For the CDF Collaboration Fermilab Users Meeting June R.J. Tesarek Fermilab

2 Outline CDF Run II Physics Program CDF II Detector Status
Where were we last year Progress since then Detector Performance Muon Calorimetry Tracking Silicon Particle ID Trigger Detector Operations Good News/Bad News Offline Reconstruction Physics for this Summer Heavy Flavor QCD Electroweak Near Term Plans Summary Fermilab Users Meeting June R.J. Tesarek Fermilab

3 CDF Run II Physics Goals
Precision top and electroweak physics Higgs Bounds Discovery/Exclusion of light Higgs Discovery/Exclusion of light SUSY Searches: Quark-lepton compositeness New particle substructure New dynamics New forces Extra dimensions New space/time structures Fermilab Users Meeting June R.J. Tesarek Fermilab

4 CDF Run II Physics Goals
Detailed study of B hadrons CP violation CKM constraints sin(2b) from B0/B0  J/y Ks |Vtd/lVts| from B0-B0 and Bs-Bs flavor oscillations Lifetimes Production cross section Narrow window of opportunity Fermilab Users Meeting June R.J. Tesarek Fermilab

5 CDF II Detector All new electronics New trigger & DAQ New software
Fermilab Users Meeting June R.J. Tesarek Fermilab

6 CDF II Detector Components from run 1 New for run 2
Central and extension muon system Central & wall calorimeters Solenoid & lots ‘ o steel New for run 2 Forward muon detectors Tracking systems Central tracker (COT) Silicon tracker (L00, SVX, ISL) End plug calorimeter Luminosity Monitor Time of flight Front end electronics (132ns) DAQ & trigger Software Fermilab Users Meeting June R.J. Tesarek Fermilab

7 Last Year Accelerator turning on Installing/connecting new detectors
Silicon Forward muon detectors Time of flight Commissioning detectors Reproducing commissioning run results Fixing dead/hot channels Correcting noisy channels Commissioning trigger hardware L1 track trigger L2 trigger boards Writing tuning software L3 algorithms Offline reconstruction Fermilab Users Meeting June R.J. Tesarek Fermilab

8 Now Accelerator tuning up Luminosity on the rise
Fewer beam related problems Store Initial Luminosity Fermilab Users Meeting June R.J. Tesarek Fermilab

9 Now CDF Tuning up More of experiment running
Improving data taking efficiency <Effic> = 67% Low=20% High=93% Details follow… Delivered Luminosity To Tape Fermilab Users Meeting June R.J. Tesarek Fermilab

10 Muon Systems Central & extension muon systems Run I
Forward muon systems Run II Fermilab Users Meeting June R.J. Tesarek Fermilab

11 Muon Systems Central & Extension Muon Detectors
System commissioned and aligned 95% live Triggering on muon track stubs Forward Muon Detectors (New) System commissioned 98% live Alignment underway Fermilab Users Meeting June R.J. Tesarek Fermilab

12 Calorimetry Central calorimeters Run I
Plug & forward calorimeters Run II Fermilab Users Meeting June R.J. Tesarek Fermilab

13 Central Calorimeter Run I detector  New electronics
Fully commissioned last summer Energy Measurements 100% PMTs/electronics working Energy scale calibrated to ~1% Reproducing response maps of Run I Position Measurements 99% chambers/electronics working Energy response calibration in progress Alignment to tracking ~5mm Reconstruction advancing Fermilab Users Meeting June R.J. Tesarek Fermilab

14 Plug Calorimeters New Detectors and new electronics
Pb(Fe) scint. Sampling calorimeters Better E resolution Extended coverage More reliable Fully commissioned last summer Energy Measurement 100% PMTs/electronics working Energy scale calibrated to ~1% Forward calorimeter (Mini Plug) Extend coverage in h to 47% instrumented Fermilab Users Meeting June R.J. Tesarek Fermilab

15 Plug Shower Max Position Measurement in new detector New electronics
Central tracking only covers ~1/2 plug calorimeter 99% PMTs/electronics working Inter channel calibration complete Fermilab Users Meeting June R.J. Tesarek Fermilab

16 Plug Performance Calorimeter 100% live Shower Max 99% live
Calibrations complete (~1% scale uncertainty) Fermilab Users Meeting June R.J. Tesarek Fermilab

17 Time of Flight (TOF) Identify p, K, p up to 2 GeV
Fermilab Users Meeting June R.J. Tesarek Fermilab

18 Time of Flight fK+K- Fermilab Users Meeting June 10 2002
R.J. Tesarek Fermilab

19 Central Tracking New Detector & Electronics Hit resolution ~175mm
Smaller cell size Multi-hit TDCs dE/dx encoded in pulse width Hit resolution ~175mm Single track efficiency 100% dE/dx P (GeV) Fermilab Users Meeting June R.J. Tesarek Fermilab

20 Detector X-ray Map out Material in CDF E loss and multiple scattering
Feed into MC Close track pattern recognition Fermilab Users Meeting June R.J. Tesarek Fermilab

21 Silicon New Large system L00: SVXII: ISL: Improve d0 Increased accept
3D vertex finding ISL: Increase tracking to eta=2 Fermilab Users Meeting June R.J. Tesarek Fermilab

22 Silicon Commissioning
Commissioning in progress Problems are mostly fixed during access Accelerator related problems Cooling problems in ISL Initial alignment good (s<50mm) Trigger Fermilab Users Meeting June R.J. Tesarek Fermilab

23 Luminosity Monitor Cherenkov radiation detector
Increased segmentation in smaller area Less pile up at high rate Decreased sensitivity to secondary particles Direct measure of luminous region Timing and pulse height recorded Fermilab Users Meeting June R.J. Tesarek Fermilab

24 Detector Summary Subsystem % Comments Luminosity Monitor 100% Running
Silicon: L00 SVX ISL 97% 90% 60% commissioning cooling+commissioning Central Tracker (COT) Missing one cell from broken wire Time-of-Flight Shower Max 99% Central aligned ~5mm Calorimeters Muon: central forward Chamber currents Forward Detectors 47% Fermilab Users Meeting June R.J. Tesarek Fermilab

25 Trigger L1: tracks, jets, leptons,ET, Missing ET
L2: impact parameter, calorimeter clusters L3: full reconstruction 50 Hz ~20MB/s Hz 45 kHz Fermilab Users Meeting June R.J. Tesarek Fermilab

26 Fast Track Trigger (XFT)
MISSING SLIDE Fast Track Trigger (XFT) Fermilab Users Meeting June R.J. Tesarek Fermilab

27 Silicon Vertex Trigger (SVT)
Impact/displaced vertex trigger Lxy Beam spot secondary vertex R PT Initial alignment < 50mm Real time position to MCR Resolution 48 mm Cut d0 > 120mm ct ~ 360um (B decays) Fermilab Users Meeting June R.J. Tesarek Fermilab

28 Hadronic B Trigger Trigger on fully hadronic b decays
L1: >2 XFT tracks; PT > 1.5 GeV L2: >2 SVT tracks; PT > 2.0 GeV; d0 >120 mm Fermilab Users Meeting June R.J. Tesarek Fermilab

29 DAQ and Offline DAQ: Operating at design (20Mb/sec) Offline:
Processing keeping up with DAQ DAQ: data to tape Offline: data processed Fermilab Users Meeting June R.J. Tesarek Fermilab

30 Operations “Smooth running until something breaks”
Muon chamber currents Run I: CMP currents ~1mA Run II: CMP currents ~10mA Power supply failures Silicon problems October incident April incident ISL cooling Blocked lines Beam related backgrounds Fermilab Users Meeting June R.J. Tesarek Fermilab

31 Power Supply FailuresI
43 VME power supplies failed in the collision hall since last year Failures due to radiation soft power MOSFET undergoing single event burnout Solutions identified involving: Power supply modification Adjust power supply operating conditions Install radiation hard components Installation of additional shielding Fermilab Users Meeting June R.J. Tesarek Fermilab

32 ISL Cooling (Angioplasty)
High power laser To clear lines Status: 12 blocked lines blocked at installation 5 lines cleared so far (6/9/02) Work continuing during shutdown Fermilab Users Meeting June R.J. Tesarek Fermilab

33 B Physics Program Start with charm Plans for summer conferences
Total direct inclusive charm cross section pp  cc + X Ds+ – D+ mass difference Momentum scale calibrated Energy loss and multiple scattering understood Fermilab Users Meeting June R.J. Tesarek Fermilab

34 Charm Summer conferences D0K+p- D0p+p- D0K+K-
Ratio of branching ratios D0K-p+ : D0p+p- D0K+K- D0K+p- D0p+p- D0K+K- Fermilab Users Meeting June R.J. Tesarek Fermilab

35 QCD + Jets Parton distribution functions at high
Transverse energy (ET) Pseudorapidity (h) Quark-lepton compositness Fermilab Users Meeting June R.J. Tesarek Fermilab

36 CDF Highest Et Dijet Event
Jet ET1=403.3 GeV, h1=0.037 Jet ET2=322.0 GeV, h2=-0.364 Vertex z = 39.0 cm Missing ET significance = 1.93 Fermilab Users Meeting June R.J. Tesarek Fermilab

37 W Reconstruction Data quality good!
Fermilab Users Meeting June R.J. Tesarek Fermilab

38 Searches The hunt is on! Z’ -> m m
Fermilab Users Meeting June R.J. Tesarek Fermilab

39 Near Term Plans Present Access June-Oct 2002 Oct 2002 Shutdown
Clear ISL cooling lines Install temporary shielding Complete L2 trigger work June-Oct 2002 Finish commissioning silicon Take data Summer conferences Oct 2002 Shutdown Install additional shielding (proton side) Additional ISL cooling work Fermilab Users Meeting June R.J. Tesarek Fermilab

40 Summary CDF II detector is off and running
Most detectors working near 100% Detector performance nearing/exceeding design spec Beginning to collect data with higher efficiency Silicon still being commissioned Beam related backgrounds First physics results this summer Look for more as the data arrives Fermilab Users Meeting June R.J. Tesarek Fermilab


Download ppt "Richard J. Tesarek Fermilab For the CDF Collaboration"

Similar presentations


Ads by Google