Diagnostic & Control Status
G. Di Pirro IV Review SPARC
2
Diagnostics GUN Emittance BPM Charge Emittance measure RF deflector
Energy and Energy spread IV Review SPARC
3
Movable Emittance-Meter
envelope IV Review SPARC
4
In the last review we have the final project
V. Lollo IV Review SPARC
5
Now we have the object IV Review SPARC
6
Target YAG Cromex We continue test in the DAFNE BTF
IV Review SPARC
7
BTF YAG MEASUREMENTS Test acuisition system for the e-meter (digital camera with a commercial optics with 1:1) Qualitative study of the YAG screen compared with other know screen (CROMOX) IV Review SPARC
8
MEASUREMENT SCHEME: Yag screen Macro lens (1:1) Basler camera
Firewire interface IV Review SPARC
9
MEASUREMENTS: CROMOX VS YAG (SAME BEAM) GRADIENT PALETTE
IV Review SPARC
10
ANALYSIS (1): 150pC CROMOX (AU) YAG (AU) IV Review SPARC
11
ANALYSIS (2): 120pC IV Review SPARC
12
ANALYSIS (3): 50pC IV Review SPARC
13
(3) Fit dopo il taglio in frequenza dello Yag
IV Review SPARC
14
(4) IV Review SPARC
15
Beam Position Monitors will be installed before, between, and after the accelerating structures, as well as in the transport sections before the undulator. BPM system parameter IV Review SPARC
16
Matched striplines are used in each BPM for the simultaneous readout of the horizontal and vertical positions. The intensity information can also be derived from the sum of the signals. Vacuum pipe diameter 47.4 mm Stripline diameter 39.4 Stripline angular width ~30 degree Stripline length 13.6 cm Characteristic impedance 50 W Strips thickness 1 Max of transfer impedance 2.08 Sensitivity 1.255 mm/dB pickup design parameter IV Review SPARC
17
BPM detection IV Review SPARC
18
Change with a Bergoz Why?
Difficult to learn the apparatus we don’t have the time Delivered time is to high about 9 month Not clear the single pass operation IV Review SPARC
19
Faraday cup IV Review SPARC
20
Faraday cup R. Sorchetti IV Review SPARC
21
RF deflector Bunch length Emittance Slice Emittance
IV Review SPARC
22
V. Lollo V. Lollo IV Review SPARC
23
V. Lollo IV Review SPARC
24
V. Lollo IV Review SPARC
25
Targets All target position are defineted. The target in OTR.
Camera: Basler IEEE1394 camera buy Hamamtsu high efficency IV Review SPARC
26
Control Status IV Review SPARC
27
IV Review SPARC
28
IV Review SPARC
29
Operating system download
Data storage Data base Electronic logbook Web information Automatic acquisition Magnet Vacuum Diagnostic IV Review SPARC
30
Using DAFNE Control system software
IV Review SPARC
31
IV Review SPARC
32
Using DAFNE Control system software
Dafne front end CPU ported in new configuration Service program under test Starting program under test and some control window under porting and test IV Review SPARC
33
Control room IV Review SPARC
34
Control room IV Review SPARC
35
Control room IV Review SPARC
36
Control room 5 CPU with 2 monitor and two Ethernet connection 10/100/1000 1 server 1 service CPU 1 optical switch CISCO in home 3 switch 10/100/1000 CISCO in home IV Review SPARC
37
Network IV Review SPARC
38
Network IV Review SPARC
39
Network IV Review SPARC
40
Network 2 2 2 2 2 2 IV Review SPARC
41
SOFTWARE IV Review SPARC
42
Magnet To control a magnet means to control a power supply.
9 Solenoids Modbus protocol 12 Quadrupoles + 8 3 Bendigs 12 Steering correctors Software is imported from Dafne control system IV Review SPARC
43
RF Modulators: come with an Ethernet interface. It is based on Siemens PLC it send at 10Hz the complete status. Driver tested and start portin under control system. Amplifier (Milmega) is remote controlled trough Ethernet Defined number and type of control. Software under development 50 pulse shape phase and amplitude readout digitizer 15 attenuator and phase shifter motorized 4 analog signal 6 digital I/O IV Review SPARC
44
Vacuum Pump 24 software completed Vacuumeter 6 software completed
3 Analog signal 1 digital input 1 digital output Ethernet as field bus. Vacuumeter 6 software completed serial interface acquired an Ethernet to serial converter with 8 port IV Review SPARC
45
Diagnostic Acquisition camera. Flag movement. BPM reading.
Acquisition software installed in TTF2 and working (12 fps on 100Mbit Ethernet) IEEE1394 Software under test Flag movement. Stepper motor. Driver completed software under development BPM reading. PCI board Charge monitor reading Electronic from Bergoz acquisition with PCI multimeter IV Review SPARC
46
IV Review SPARC
47
IV Review SPARC