CH-53K Marine Heavy Lift Replacement

Similar presentations


Presentation on theme: "CH-53K Marine Heavy Lift Replacement"— Presentation transcript:

1 CH-53K Marine Heavy Lift Replacement
Dan Miller CH-53K Deputy APMSE

2 APPROVED FOR PUBLIC RELEASE: DISTRIBUTION UNLIMITED – PRA #16-420
CH-53K Program Overview Program Status ACAT ID Major Contract Actions Sikorsky Aircraft, SDD, CPIF, current LRE - $3.877B Sikorsky Aircraft, SDTA 1-4, (mod to SDD) CPIF, current LRE - $484.89M General Electric, SDTA Engines, FFP, current LRE - $114.24M Program Milestones Ground Test Vehicle Light Off - 23 December 2013 Shakedown commenced - 17 April 2014 Acquisition Strategy, Revision 2 approved 18 April 2014 Subsystem qualification underway First Flight 27 October 2015 Defense Acquisition Board (LRIP Long Lead) - March 2016 OT-B1 - September 2016 Milestone C – February 2017 IOT&E – February 2019 IOC – July 2019 CH-53K enables future warfighting concepts Lift/Range to support the future Marine Air Ground Task Force. Dual up-armored HMMWV and combat loaded crew for vertical transport (~27,000 lbs) ~3 times the external lift capacity of the CH-53E Light Armored Vehicle (LAVA2) (~31,000 lbs) Joint Light Tactical Vehicle (JLTV, HMMWV replacement) (~23,600 lbs) Improves Sustainability Inventory supports USMC expeditionary middle-weight force concept 8 Active, 1 Reserve Squadrons = 200 A/C APPROVED FOR PUBLIC RELEASE: DISTRIBUTION UNLIMITED – PRA #16-420 2

3 CH-53K Aircraft Configuration
APPROVED FOR PUBLIC RELEASE: DISTRIBUTION UNLIMITED – PRA #15-684

4 CH-53K Helicopter Requirements
Requirements Document: ORD #AAS 34.6 Ch 4 / JROCM of Sep 2010 Projected to Meet All KPPs APPROVED FOR PUBLIC RELEASE: DISTRIBUTION UNLIMITED – PRA #15-264

5 Improved Payload Efficiency CH-53K Cabin Features
APPROVED FOR PUBLIC RELEASE: DISTRIBUTION UNLIMITED – PRA #16-047

6 Big Iron Static Ground Testing
APPROVED FOR PUBLIC RELEASE: DISTRIBUTION UNLIMITED – PRA #16-308

7 APPROVED FOR PUBLIC RELEASE: DISTRIBUTION UNLIMITED – PEOA #047-2016
CH53K Production Plan APPROVED FOR PUBLIC RELEASE: DISTRIBUTION UNLIMITED – PEOA #

8 APPROVED FOR PUBLIC RELEASE: DISTRIBUTION UNLIMITED – PRA #16-308
Up and Away APPROVED FOR PUBLIC RELEASE: DISTRIBUTION UNLIMITED – PRA #16-308