1 Colorado Springs, CO, USA, 24 April 2009 Deputy – David Giaretta
Data Archive Ingest WG Report for MOIMS Closing Plenary Colorado Springs, CO, USA, 24 April 2009 Chair – John Garrett Deputy – David Giaretta

2 DAI WG REPORT CONTENTS SUMMARY TECHNICAL STATUS OF WG
CROSS-AREA TECHNICAL ISSUES OTHER ISSUE AND CONCERNS PROPOSED WG RESOLUTIONS/ACTION ITEMS

3 DAI WG REPORT SUMMARY TECHNICAL STATUS DAI WG
Goal: Complete updates for OAIS Reference Model, Issue 2 Goal: Develop a CCSDS/ISO standard for a Submission Information Package (SIP) for transfer and validation of information submitted to an archive Working Group Status: Active Working Group Summary Situation: status: OK CAUTION PROBLEM comment: OAIS ready for informal public review then RB; Progress on draft PAIS book

4 B. SUMMARY TECHNICAL STATUS: OAIS RM
DAI WG REPORT B. SUMMARY TECHNICAL STATUS: OAIS RM Working Group Summary progress: Resolved all remaining issues with OAIS update. Responded to all comments (~200) from 5 year review of the OAIS Reference Model. WG has interacted with comment originators in regard to our response to comments. Met with CCSDS Editor and CCSDS ISO liaison in regard to processing of this document through CCSDS and ISO approval processes WG stressed that ISO number should not change CCSDS ISO liaison is checking if change from BB to MB would result in changed ISO number. Schedule (major deliverables only) OAIS Reference Model Pink Book 1.1 (to become Blue) to CESG for approval

5 B. SUMMARY TECHNICAL STATUS: PAIS
DAI WG REPORT B. SUMMARY TECHNICAL STATUS: PAIS Working Group Summary progress: A list of issues with the draft Producer Archive Interface Standard (PAIS) White Book-10 were reviewed and several were resolved. Group IDs, undescribed groups, etc. Drafting of RB to follow One PAIS implementation available based on earlier draft, will be updated later this year to current draft; Second implementation to be started this year Schedule (major deliverables only) PAIS Red Book to CESG for approval

6 DAI WG REPORT CROSS-AREA TECHNICAL ISSUES
Issue 1 Concern that Magenta Books could run into problems in transition to ISO Standard. No Magenta Book has been approved as an ISO Standard (1 has been submitted). Issue 2 OAIS Issue 2 should remain a CCSDS Standard (Blue Book) Change of color will be confusing to community (largest for any CCSDS document) Change of color will likely be seen by the community as a demotion Change of color could result in renumbering by ISO. Renumbering would cause confusion in the community and would result in inconsistent use of new and old standard. Renumbering would dilute effectiveness of previous efforts to ensure community acceptance and use of standard. Such changes could diminish the image of CCSDS in the wider community.

7 DAI WG REPORT CROSS-AREA TECHNICAL ISSUES (from previous meetings)
Issue 1 CESG/CMC should investigate additional sources for determining requirements and priorities for Archiving. IOAG is primarily oriented to communications and has little interest or expertise in Archiving areas Issue 2 Our CCSDS Standards (which specify registries, e.g. ADIDs) also become ISO standards. We want a single registry of all registered items that is respected by and used by entire community (both CCSDS and ISO outside of CCSDS). If needed for community acceptance, separate Maintenance Agencies (MAs) (outside CCSDS) should be allowed. If a separate MA for registry is specified, then CCSDS SANA should point to it appropriately. If SANA handles the registry, should support mechanism for supporting registrations from outside CCSDS Members.

8 DAI WG REPORT OTHER ISSUES AND CONCERNS None

9 DAI WG REPORT PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC APPROVAL
RESOLUTION 1 Action 1: OAIS RM Issue 2 should be grandfathered in as a Blue Book

10 DAI WG REPORT Need to meet with other CCSDS WGs, BoFs, etc.
MOIMS – IPR MOIMS – RAC WG members also participate in SEA – SANA? SEA – REG/REP? SEA – IA?

11 DAI WG REPORT F. Projects
Current - Producer-Archive Interface Specification (PAIS) Current – OAIS Reference Model update Current – PAIS Tutorial Future? - XML Version of (PVL) Control Authority Data Structures Future? - XML Schema version of DEDSL (now Abstract, PVL, XML/DTD) Future? - New forms of SFDU Referencing Environment