Presentation is loading. Please wait.

Presentation is loading. Please wait.

Beam Energy & Intensity: One bunch during full cycle

Similar presentations


Presentation on theme: "Beam Energy & Intensity: One bunch during full cycle"— Presentation transcript:

1 MD 2733: Beam size measurements using quadrupolar BPM based on DOROS and collimator BPM
Beam Energy & Intensity: One bunch during full cycle Beam conditions: ADT for blow-up Estimated time: 4h By A. Sounas, M. Gasior, T. Lefevre, M. Wendt, S . Redaelli and .. Goal: Test the possibility to measure beam size using collimator BPM (as quadrupolar pick-up) using two collimators (H and V) Position Scans (bumps/coll. offset scans) Centering Beam BPM characterization About 1.2 km of the present LHC ring will be modified during the LS3 shutdown, when the HL-LHC machine upgrade is scheduled to take place. New shielded Beam Screen for the low-beta􏰀 triplets stands at the center of the project. HiLumi-LHC (HL-LHC) machine upgrade has the additional feature of needing internal tungsten shields to reduce the amount of collision debris which is deflected by the high-gradient triplet magnets towards the superconducting magnets' cold masses and coils. Apperture Scans Abs. Beam Size measurement Blow-up / Ramp Rel. Beam Size measurement (no need for aperture scan, IP1 Q7 BPMs can be used)

2 MD 2733: Beam size measurements using quadrupolar BPM based on DOROS and collimator BPM
Beam Energy & Intensity: One bunch during full cycle Beam conditions: ADT for blow-up Estimated time: 4h 1.1 Inject 1 nominal bunch 1.2 Beam bumps (H/V planes) at collimator points (Centering Beam) 1.3 Collimator aperture scan (Abs. Beam Size measurement ) 1.4 Blow-up beam emittance using ADT (Rel. Beam Size measurement) 1.5 Collimator aperture scan (Abs. Beam Size measurement) 2.1 Re-inject a fresh bunch 2.2 Beam bumps (H/V planes) at collimator point (Centering Beam) 2.3 Collimator aperture scan (Abs. Beam Size measurement) 2.4 Ramp (Rel. Beam Size measurement) 2.5 Collimator aperture scan (Abs. Beam Size measurement) 2.6 Perform Coll. Position Scans (BPM characterization) About 1.2 km of the present LHC ring will be modified during the LS3 shutdown, when the HL-LHC machine upgrade is scheduled to take place. New shielded Beam Screen for the low-beta􏰀 triplets stands at the center of the project. HiLumi-LHC (HL-LHC) machine upgrade has the additional feature of needing internal tungsten shields to reduce the amount of collision debris which is deflected by the high-gradient triplet magnets towards the superconducting magnets' cold masses and coils. *WS & BSRT measurements in & for cross-check


Download ppt "Beam Energy & Intensity: One bunch during full cycle"

Similar presentations


Ads by Google