Presentation is loading. Please wait.

Presentation is loading. Please wait.

CITY SANITATION PLAN - WAI

Similar presentations


Presentation on theme: "CITY SANITATION PLAN - WAI"— Presentation transcript:

1 CITY SANITATION PLAN - WAI
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

2 CONTENTS SECTION I: OVERVIEW AND CONTEXT SETTING
INTRODUCTION LOCATION AND REGIONAL SETTING DEMOGRAPHIC PROFILE CITY ECOLOGY CONTEXT OF WATER SUPPLY IN WAI SECTION II: SECTORAL ANALYSIS AND PLAN PROPOSALS ACCESS TO SANITATION FACILITY (TOILETS) – HOUSEHOLD, COMMUNITY AND PUBLIC SANITATION FACILITIES WASTEWATER, SEPTAGE AND STORM WATER MANAGEMENT SOLID WASTE MANAGEMENT SECTION III: MUNICIPAL FINANCE ANALYSIS MUNICIPAL FINANCE ANALYSIS FINANCING PLAN SECTION IV: SUMMARY AND FINANCING ALTERNATIVES PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

3 SECTION I: OVERVIEW AND CONTEXT SETTING
INTRODUCTION LOCATION AND REGIONAL SETTING DEMOGRAPHIC PROFILE CITY ECOLOGY CONTEXT OF WATER SUPPLY IN WAI PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

4 INTRODUCTION REGIONAL SETTINGS DEMOGRAPHIC PROFILE POPULATION FORECAST
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED INTRODUCTION Wai is a holy pilgrim town and an old Buddhist settlement. It emerged and flourished along River Krishna Ghat precincts are major upcoming focus of attraction for film shooting City Wai District Satara Civic status Nagar Parishad ‘C’ class Area 3.64 sq km Number of Wards 19 Number of Prabhag 5 REGIONAL SETTINGS Located at 17°56N 73°53E, south of the city of Pune An average elevation of 718 meters (2,355 feet) Surrounded by the mountainous region of the Sahyadris; ("Dhom Dam" has been constructed in the vicinity of Wai) DEMOGRAPHIC PROFILE POPULATION FORECAST YEAR METHOD AM IM GM PM OTHER 2012 36386 36450 36274 36377 36500 2013 36718 37106 36496 36702 38200 2021 39379 39703 38324 39298 41500 2028 41707 43192 39999 41569 42711 2031 42705 44646 40739 42543 45500 2041 46031 49913 43305 45787 48000 2043 46696 =54044 say 54050 43838 46436 49000

5 Total female population Municipal area increased by about 30%
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED ADMINISTRATIVE DETAILS AND SLUM PROFILE ADMINISTRATIVE DETAILS SLUM PROFILE KRISHNA RIVER Hillock TOWARDS DHOM DAM SURUR PANCHGANI `` Old municipal limit New municipal limit Outgrowth MENAVALI SR. NO . CITY SLUMS Population 36,053 2,140 Households 8,066 342 NAME POPULATION AGE Gurebazar 1,328 30 Kashikapadi 812 50 2% slum area Prabhag Wards Total HHs Total population Total male population Total female population 1 1,7,8,9 1,524 6,607 3,336 3,271 2 2,3,4,6 1,491 6,916 3,416 3,500 3 10,11,12,13 1,826 7,805 3,950 3,855 4 14,15,16,19 1,438 8,023 4,089 3,933 5 5,17,18 1,464 6,702 3,397 3,305 Total 7,743 360,53 18,188 17,864 Municipal area increased by about 30% 5 1 2 3 4

6 No Metering of the water connections provided
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED WATER SUPPLY Ground Water 7 Private well 1 Bore well Total 5.83 MLD Krishna River WTP Surface water Storage 4.8 MLD GSR 3.5 LL ESR 16.6 LL Distribution Meter Unbilled authorised consumption: 0.04MLD Billed metered consumption: 0 MLD Billed unmetered consumption: 4.57 MLD Unauthorised use and leakages on transmission mains and on distribution line: 0 .98 MLD Revenue water 4.57 MLD (78.39%) Non-revenue water 1.02 MLD (21.61%) Authorised consumption Apparent losses Real losses Major source of water is River Krishna Very less dependency on groundwater 7 private wells and 1 bore well near Siddhanath Wadi temple A ground storage reservoir of capacity- 20,000 litres ISSUES IN WATER SUPPLY No Metering of the water connections provided There is no metering of the water connections provided Extent of Non-revenue water supply is as high as 21% Extent of non-revenue water supply is as high as 21% Cost recovery of water supply services is only 53% Cost Recovery of water supply services is only 57%

7 SECTION II: SECTORAL ANALYSIS AND PLAN PROPOSALS
ACCESS TO SANITATION FACILITY (TOILETS) - HOUSEHOLD COMMUNITY AND PUBLIC SANITATION FACILITIES WASTEWATER, SEPTAGE AND STORM WATER MANAGEMENT SOLID WASTE MANAGEMENT PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

8 Only 68% of household sanitation coverage.
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED HOUSEHOLD SANITATION SANITATION VALUE CHAIN User interface Collection Conveyance Treatment Reuse /Disposal Pour flush latrine Existing pit and septic tank with drain field Open/covered drains Into river or natural drain No conveyance system in new developments Only 68% of household sanitation coverage. No periodical sludge removal through tanks/pits Dumping along with solid waste High dependency on community level sanitation in slum and non-slum areas Old city area= Inadequate primary treatment but good conveyance system through open drains Lack of 100% coverage of conveyance system Lack of treatment facility Lack of scientific disposal of septage Inadequate sizes of septic tanks due to space constraints. New developments= Improved primary treatment through septic tanks but no conveyance system through open drains USER INTERFACE – SANITATION COVERAGE & ON-SITE DISPOSAL KEY ISSUES IN HH SANITATION Only 67% of coverage of household level sanitation facilities Lack of household level sanitation facility in slums Inadequate on-site primary treatment due to inadequate size of septic tanks which function as pits Lack of provision of soak pits No periodical cleaning of septic tanks Discharge of untreated effluent into open drains

9 Both the Slums Covered Under IHSDP
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED SANITATION STATUS IN SLUMS AND PEOPLE’S PERCEPTION SANITATION STATUS IN SLUMS Slum area Gurebazaar Kashikapadi Population 1328 812 Maintained by ULB Seats available 4 8 Demand gap 50 seats required 6 seats required Both the Slums Covered Under IHSDP PEOPLE’S PERCEPTION AND WILLINGNESS TO PAY (NON-SLUM AREA) No. Indicator % Willing to pay for the facility 1 HH relying on community toilets 2435 32% 2 Sample size 240 10% of (1) 3 Preferred choices of sanitation facility in future/month INR. 0-50 INR INR 5 Community level toilet facility 96 40% 20% 80% -- 6 HH level toilet facility 144 60% Capital cost up to 50% to be borne by ULB and rest by the users Ready to pay Sanitation Tax after having the toilets constructed 7 Shared/group toilets Having no assurance of maintenance responsibility by group members leading to strained personal relationships People are ready to pay Sanitation Tax after having the toilets constructed No HH level sanitation facility available in the Dense Areas of the town PREFERRED CHOICES OF SANITATION FACILITY Prabhag no. Sample size (HH) Preferred choices (%) Remark HH CT 2 60 38% (24) 62% (36) Densely located houses with space constraints at household level 3 80% (48) 20% (12) Gangapuri (baudhwasti) area has no households without toilets 4 90% (54) 10% (6) Most of the existing dwelling units are reconstructed with HH level toilets facility 5 30% (18) 70% (42) Topographical constraints and unavailability of space is a prime issue

10 Community Toilet Details
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED COMMUNITY LEVEL SANITATION LOCATION OF COMMUNITY TOILET BLOCKS CONDITION ASSESSMENT OF CT BLOCKS Community Toilet Details Prabhag no. 1 Prabhag no. 2 Prabhag no. 3 Prabhag no. 4 Prabhag no. 5 Prabhag Households 1,524 1,491 1,826 1,438 1,464 No. of toilet blocks 5 8 10 11 12 No. of seats 28 57 45 72 51 No. of seats for men 15 22 34 25 No. of seats for women 13 29 23 38 26 Seats for children 1 No. of functional seats 43 Type of on-site treatment Septic tank Over 2,274 households rely on 46 community toilet blocks Condition of community toilet blocks is good but no on-site treatment due to lack of periodical maintenance About 2,274 households rely on community toilets. There are about 47 community toilet blocks in the city with 253 functional seats EXISTING WASTE MANAGEMENT PRACTICES User interface Collection Conveyance Treatment Reuse /Disposal Pour flush latrine Existing Pit and Septic tank with drain field Open/covered drains No treatment Into river or natural drain ISSUES: Lack of periodical maintenance resulting in degraded infrastructure resulting in open defecation practices Inadequate human resource for maintenance of CTs Increased load on O&M of the facility

11 PUBLIC LEVEL SANITATION
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED PUBLIC LEVEL SANITATION WAI – MARKET AREA AND TEMPLE PRECINCT Area Existing toilets Approx. no. of users Market area 10 seats + 5 urinals available /day Bus stand 7 seats + 10 urinals available 500/day Forest Department 2 seats available 50-75/day PWD 3 seats- 2 functional seat 150/day Tehsil office Toilet in nearby residential area Parking lot near Dholya Ganpati Mandir No toilet facility 300/day- Temple precincts 400/day-

12 Mitigate existing demand gaps
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED SUGGESTED IMPROVEMENTS IN HOUSEHOLD LEVEL SANITATION From Year 2013 till 2015 From Year 2015 till 2028 From Year 2028 till 2043 Short term Mitigate existing demand gaps Mid term Enhancing service level and coverage Long term Achieving sustainable models Initiate promotion of household sanitation through IEC campaigns in non-slum area Facilitating access to household toilets Achieve 100% access to household level sanitation Providing technical support for low-cost sanitation construction through involvement of NGOs. Can be applied in Prabhag 3 (high demand for individual toilets) IEC activity involves design, planning and implementation of IEC campaigns with required publicity materials Encourage maximum access to household level sanitation and eliminate dependency on community toilet blocks, through providing technical support for construction of individual toilet with minimum space requirement IEC activity for first 3 years of CSP implementation Total IEC cost = Rs. 30 lakh (3 years) Assuming the cost of one toilet with septic tank as Rs. 15,000 Total cost = Rs crore (private cost) Introduce and implement fines for OD and urination in sanitation related bye-laws Develop a strategy for improved septic tanks To abolish the practice of open defecation, sanitation related bye-laws can be enforced Provide technical support for construction of septic tanks during reconstruction of houses (Prabhag 1 & 4) Detail assessment and development of a strategy for upgrading existing pits to septic tanks About 1,112 toilets are needed for augmenting on-site disposal system to Septic Tank Total cost = Rs crore (private cost)

13 Reduce open defecation & increase accessibility
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED SUGGESTED IMPROVEMENTS IN COMMUNITY LEVEL SANITATION From Year 2013 till 2015 From Year 2015 till 2028 From Year 2028 till 2043 Short term Reduce open defecation & increase accessibility Mid term Reducing dependency on community toilet blocks Long term Eliminating reliance on Community Toilet blocks Interim CTs in slums Reducing dependency on CT blocks Achieve 100% access to household level sanitation and eliminate dependency on CT blocks Though slums will be rehabilitated under IHSDP, this will take 3-4 years. Till then, the practice of OD can be reduced by increasing dependency on existing community toilet blocks In long run it is expected to reduce the dependency on CTs and in turn reduce the percentage of open defecation. Also, reduction in operational costs for maintaining the CTs is envisaged. Encourage maximum access to household level sanitation and eliminate dependency on community toilet blocks, through providing technical support for construction of individual toilet with minimum space requirement Refurbish CTs in non-slum areas Detail assessment for dependency on CT blocks Till 100%HH sanitation is achieved, the CT blocks are required to be rehabilitated 10 CT blocks from the high dependent prabhag 3 are to be rehabilitated first Assuming access to individual toilets is increased, the dependency on existing community toilet blocks needs to be assessed New models for public toilets Having reduced dependency on CT blocks, some of the CT blocks near public spaces may be converted to public toilets The cost of construction will be borne by local authority. The O&M cost will be recovered through levying user charges Assuming the cost of rehabilitation of one toilet block as Rs lakhs Total cost= Rs crore Identify models for O&M of CT blocks Practice of involving private service operator for regular O&M of community toilet blocks should be encouraged. The cost will be first borne by ULB and later, the model of levying user fee can be initiated

14 O&M (Expected Earning)
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED SUGGESTED STRATEGIES FOR PUBLIC SANITATION SHORT TERM – Mitigating existing gap through provision of adequate public toilet blocks Well maintained blocks by developing user fee model for all the public places to sustain and maintain the hygiene level Area(Existing toilets) No. of users Demand gap Proposal Cost in Rs. O&M (Expected Earning) Market area (10 seats + 5 urinals available) Approx /day 6 seats and 3 urinals required 1 Block with- 6 seats and 3 urinals Rs. 5 lakhs With Rs. 1/user, about Rs.500/ day (Rs. 15,000/ month) collected Bus stand (7 seats + 10 urinals available) Approx. 500/day 3 seats required. Urinals are adequate as per norm 3 seats Rs. 1.5 lakhs With Rs. 1/user, about Rs.700/ day (Rs. 20,000/month) collected Forest department (2 seats available) Approx. 50-75/day 1 urinal required Since these campuses are closely placed, they can be provided with a common toilet block in either one of the premises or on the road 8 seats (4 male+4 female) and 6 urinals can be proposed Rs. 4 lakhs With Rs. 1/user, considering 500 users, about Rs.500/ day (Rs. 15,000/ month) collected PWD (3 seats- 2 functional available) Approx. 150/day 3 seat and 3 urinals required Tehsil office Parking lot near Dholya Ganpati Mandir Approx. 300/day- no toilet facility 6 seats and 2 urinals required 14 seats (7 male+7 female) and 6 urinals (Mobile toilet is suggested) Rs. 6 lakhs With Rs. 1 per user, considering 500 users, about Rs. 500/day (Rs. 15,000/ month) collected Temple precincts Approx. 400/day- 8 seats and 4 urinals required Mitigating existing gap through provision of adequate public toilet blocks Well maintained blocks by developing user fee model for all the public places to sustain and maintain the hygiene level Initiating new models for public toilets (Policy level interventions) Having reduced dependency on community toilets, some of the community toilets near public spaces may be converted to public toilets MID TO LONG TERM – Initiating new models for public toilets (Policy level interventions) Having reduced dependency on community toilets, some of the community toilets near public spaces may be converted to public toilets

15 ACCESS TO TOILET FACILITY
Upgrading Community Toilet Blocks with improved infrastructure and on-site collection-treatment Rs crore Promoting household level sanitation. Introducing low-cost toilet technologies (IEC activity) Mobile toilets for temple precincts Rs crore Up gradation of septic tanks form pit toilets Rs crore (private cost) New models for public toilets Rs. 0.1 crore

16 WASTEWATER MANAGEMENT
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

17 Wastewater Generation (MLD)
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED EXISTING SANITATION AND SEWERAGE SANITATION VALUE CHAIN User Interface Collection Conveyance Treatment Disposal/Reuse EXISTING SCENARIO: No dedicated sewerage system for domestic wastewater management Septic tanks/pits are being only an on-site primary treatment mechanism Open/partially covered drains collect and convey wastewater to River Krishna No treatment of grey water from kitchen, bathrooms and other domestic usages Open nallas get clogged due to solid waste dumping Pour Flush toilets Septic tanks/ Pits Open/closed nallas No treatment River Krishna SANITATION CLUSTERS Cluster Prabhag Total Population Wastewater Generation (MLD) Cluster 1 1 6,607 0.71 2 6,916 0.75 3 7,805 0.84   Total 21,328 2.30 Wastewater from drains flows untreated into the River and polluting it Complete slope of the town towards River Krishna Cluster 2  4 8,023 0.9 Ward 17 of Prabhag 5 2,443 0.3   Total  10,466 1.1 Cluster 3  Ward 18 of Prabhag 5 2,491 0.3 Ward 5 of Prabhag 5 1,768 0.2  Total 4,259  0.5

18 SAMPLING OF WASTEWATER
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED SAMPLING OF WASTEWATER Sample Location BOD, mg/l COD, mg/l TSS, mg/l pH DESIRED STANDARDS 30 250 600 Ganpati Ali. Near Nagar parishad 96 150 92 7.5 Kalwaat Ali 147 230 119 7.6 Old Bridge 201 380 332 6 Siddhanthwadi 36 59 51.6 7.4 River Krishna, Ganpati Mandir 9.3 28 17.6 7.3 Vishwakosh Ghat 4.2 13 7.8 Madhali Ali 153 260 5.7 Beyond CPCB effluent standards Within the CPCB effluent standards

19 Newly developed colonies completely lack in conveyance system
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED EXISTING CONVEYANCE SYSTEM COVERAGE OF WASTEWATER CONVEYANCE KEY ISSUES Old city area Newly developing colonies Area with no network of conveyance system Area with network of open and covered drain channels along roads Prabhag boundary Lacks in technical designs of conveyance system and relies on open drain channels along the streets Lack of conveyance system for newly developing areas. Wastewater after primary treatment through septic tanks is discharged into open areas No separate system of grey and black water. Both are discharged into open drain channels along streets No treatment facility for domestic wastewater. Discharge of wastewater into natural drains lead to pollution Disposal of solid waste into Nallas leads to water clogging Lack of implementation and enforcement of building bye-laws Newly developed colonies completely lack in conveyance system In old city area, both grey and black water is discharged in the open drains along road without treatment Lack of implementation and enforcement of building bye-laws No. of Households Waste outlet connected to Closed drains Waste outlet connected to Open drains. Waste outlet connected to No drains 7580 2644 4312 624

20 Grey water let in open drains
WASTEWATER CONVEYANCE SYSYEM

21 MP- UWSEIP- GWALIOR PROJECT CITY
RIVER POLLUTION DUE TO DISCHARGE OF UNTREATED WASTEWATER IS A PRIME CONCERN!!! MP- UWSEIP- GWALIOR PROJECT CITY Untreated wastewater polluting the built heritage and environment

22 (through natural drains)
USER INTERFACE COLLECTION/ STORAGE CONVEYANCE (through natural drains) TREATMENT/ DISPOSAL

23 USER INTERFACE COLLECTION/ STORAGE CONVEYANCE TREATMENT/ DISPOSAL

24 SUGGESTED IMPROVEMENTS FOR WASTEWATER MANAGEMENT
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED SUGGESTED IMPROVEMENTS FOR WASTEWATER MANAGEMENT EXISTING SCENARIO Old town New development Density High-medium density Medium-low density Development pattern Organic congested development Planned plotted layouts Road pattern Organic pattern Planned network On-site treatment Pits below superstructure Septic tanks Existing conveyance Open and closed drains along the roads Kattcha Nallas or no drains Existing treatment and disposal Without treatment discharged into River Krishna Old town New developments

25 PROPOSED SANITATION VALUE CHAIN
User interface On-site collection Conveyance Treatment Disposal OLD TOWN Pour flush latrines Septic tanks/Pits Natural Drain/ Into River Krishna No treatment Open/Closed drains EXISTING SANITATION VALUE CHAIN No treatment Pour flush latrines Septic tanks in future developments Septic tanks in existing developments Into the river No treatment Rehabilitation of roadside drains Initiate intercepting sewer connecting rehabilitated drains SHORT TERM INTERVENTIONS No treatment Into the river PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

26 PROPOSED SANITATION VALUE CHAIN
User interface On-site collection Conveyance Treatment Disposal OLD TOWN Pour flush latrines Septic tanks in future developments Septic tanks in existing new developments Agricultural use MMBRT As proposed in NRAP Upgrading existing rehabilitated drains to Settled Sewer System MID TERM INTERVENTION Agricultural use NEWLY DEVELOPED AREA & FUTURE DEVELOPMENTS Pour flush latrines Septic tanks Natural Drain/ Into River Krishna No treatment No conveyance/Kattcha nalla EXISTING SANITATION VALUE CHAIN Pour flush latrines Septic tanks in future developments Septic tanks in existing new developments Into the river MMRBT as proposed in NRAP Settled sewer system SHORT / MID TERM INTERVENTIONS PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

27 WASTEWATER MANAGEMENT – SETTLED SEWER
Rehabilitating existing drains (Rs crore) Upgrading existing rehabilitated drains to Settled Sewer System (Rs crore) Settled Sewer System – NRAP Scheme (Rs. 2.9 crore) Interceptor sewer (Rs. 4 crore)

28 ON-SITE SANITATION SYSTEM
User interface Collection Conveyance Treatment Reuse/disposal Centralised or decentralised fecal sludge treatment facility Reuse for industrial/ agriculture/ energy conversion Septic tank Effluent disposed through soak pit Vacuum suction emptier trucks/trolley To achieve . . . Universal access to toilets Universal access to improved septic tanks & soak pits Safe conveyance of septage for treatment/reuse Adequate treatment of septage Economic revenue from reuse of treated septage By what means . . . Individual toilet Community toilet Public toilet Bathrooms New/refurbishment of septic tanks Connection of septic tank and grey water to household/ community level soak pits Possibility of DEWATS Provision of adequate vacuum suction emptier trucks and a regulated service Possibility of outsourcing services to private sector Provision treatment facility like sludge drying beds for collected septage Decentralised treatment sites to reduce transportation cost Revenue from sale of treated septage for agriculture purpose or conversion to energy

29 EXPLORING A CITYWIDE OSS PROPOSAL
User Interface Collection Conveyance Treatment Reuse / disposal Universal access to toilets Universal access to improved septic tanks & soak pits Safe conveyance of septage for treatment/reuse Adequate treatment of septage Economic revenue from treated septage New individual toilets (2,093), public toilet (4 block) and refurbishment of community toilets (46 blocks) Up-gradation (716) and refurbishment (886) of non-functional septic tanks New soak pits (5,333) Additional emptier trucks (2) with linked service Treatment of fecal sludge (3,505 sq mt) Income through sale of compost (1,618 tonne/year sold at Rs. 500/tonne) or for energy Promotion programme for use of toilets, ‘septic tank conversion’ and Ongoing regulatory monitoring Rs. 5.1 crore Public funds (subsidy), micro credit, PPP Rs. 2.5 crore Public funds (subsidy), micro credit, household own funds Rs. 0.2 crore Public funds, PPP, private entrepreneur 0.1 crore Public funds, PPP, private entrepreneur Public funds, PPP, private entrepreneur Business model for community/public toilets, explore microcredit options Develop separate or integrated business models for septic tank emptying, treatment and explore option for reuse or energy conversion

30 Decentralised fecal sludge treatment facility
WASTEWATER MANAGEMENT – ON-SITE SANITATION OPTION Decentralised fecal sludge treatment facility

31 Financial Aspects Sanitation Score Other consideration
COMPARISON OF WASTEWATER OPTIONS Aspects OPTION 1 OPTION 2 Description of Option Citywide Settled Sewer On-site Sanitation System Financial Aspects Capital Costs Rs crore Rs. 5.4 crore O&M Costs (average/ annum) Rs. 1.0 crore Rs. 0.3 crore Revenues (average/ annum) Project Period 5 Years 4 Years Sanitation Score Access Both options will have the same outcomes as per NUSP “Universal Access to All and 100 % sanitized city” Waste management Other consideration Institutional Required technical knowledge for implementation and operation of this project Flexibility Can be easily extended to new areas, possibility of DEWATS in some areas Funding options Grants funding is essential Can be funded from ULB funds Other parameters Appropriate design essential Need to assess soil permeability and water table levels for this proposal

32 No dedicated storm water management system
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED STORM WATER MANAGEMENT Slope No dedicated storm water management system Considerable rainfall and hilly area on south west adding loads of storm water The natural slope of the town is towards the river that facilitate the flow of storm water as well as sewage into the Krishna River PARAMETERS ZONE 1 ZONE 2 Population 28,795 (Prabhag 4 and 5) 7,655 (Prabhag 1,2 and 3) Area 688 Ha 750 Ha Length of nalla 25603 m 6700 m Quantity (Q) 87.14 cu m sec 95 cu m sec Run- off 87,140 lps 95,000 lps Total (run off sewage) 87, lps 95, lps KEY ISSUES No dedicated system for storm water collection, conveyance and treatment. Road side drains carry storm & wastewater Solid waste disposal in natural drains and river leads to environment degradation

33 Level of interventions
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED SUGGESTED IMPROVEMENTS FOR STORM WATER MANAGEMENT SUGGESTED STRATEGIES Natural drains in the municipal limits and in urban area to be de-silted, dredged/excavated and rehabilitated to achieve the desired cross-section Natural drains outside the municipal boundary and in green fields to be de-silted and excavated to remove any obstructions in the flow coming from hilly areas in south-west side For the drainage system in Prabhag 1,2 and 3, it is proposed to rehabilitate the existing drains along the road as per desired section to carry storm and wastewater both and cover them in phased manner Item Level of interventions Cost (Rs. in crore) Pilot Short term Midterm Long Term Base year (2013) 2 years (2015) 15 Years (2028) 15 Years (2043) De-silting of the drains up to 0.75 m 0.80 Rehabilitation of the drains with RCC 0.59

34 SOLID WASTE MANAGEMENT
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

35 SOLID WASTE MANAGEMENT
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED SOLID WASTE MANAGEMENT Regular collection TRANSPORTATION TREATMENT DISPOSAL COLLECTION Residential areas 81% Door to Door collection Dumping ground (3 km away from town) Non-residential areas 6 Ghatagadis Collection in community bins Open dumps/ Nallas/ drains Tractor trailer/Dumper Placer Partial collection No treatment 2.5 MT/day Uncollected waste Door to door Collection Collection in bins Dumping ground Dumping along natural drains Collection from bins Dumping in river Krishna

36 81% coverage by door to door collection
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED SOLID WASTE GENERATION 81% coverage by door to door collection

37 Treatment and disposal
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED COLLECTION AND TRANSPORTATION OF SOLID WASTE Door to Door Collection by Ghantagadis: 81% of waste collection from residential area Around 2-3 trips of total 6 Ghantagadis are used for D2D collection of waste The trips of vehicles vary depending upon solid waste generation per day The vehicles are emptied at the existing dumping ground – located 3 km away North of the town Route of Ghantagadis Areas not covered under D to D Institutional areas Newly developed areas not covered by door to door collection. Existing contracts for door to door collection Coverage by private contractor is 80% HHs The contract is in operation since year 2008 and renewed every year Till 2012, the amount paid was Rs 72,000 per month but for it is fixed as Rs. 65,000 per month Role of ULB – Provision of equipments Role of contractor- provision of labours and O&M of Ghantagadis Area Collection Transportation No Treatment and disposal Residential area Door to door (D2D) – coverage 81% 3 wheeler auto tipper 6 Dumping ground located 3 km away north of the town Residential (uncovered by D2D) and non-residential area Waste bins from residential and non-residential area dumper placer 1 Open dumps Tractor trailer Along road side drains

38 Insufficient vehicles resulting in waste left unattended
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED COLLECTION AND TRANSPORTATION OF SOLID WASTE Waste collection from community bins and open dumps 95 bins of 0.25 MT capacity placed at 85 locations along roads in all the Prabhags by WNP Waste from these bins is collected by dumper placer Dumper placer covers around bins in 3 trips to the dumping ground Areas unserved by Ghantagadis (New developments from Prabhag 2, 4 & 5) use community waste bins Community bins Open dumps Street sweeping A daily activity except for Sundays and government holidays 3 supervisors and 42 workers from sanitation department of WMC work in market areas and commercial streets Street sweepers dump the collected waste in nearby community waste bins Dumping of waste in river and natural drains No bins provided at regular intervals - solid waste dumping results in clogging of nallas Nalla cleaning Workers from sanitation department of ULB clean about 400 m nallas every day No provision of river cleaning Collected waste transported by 1 tractor trailer Since, 1 tractor proves to be insufficient, the collected waste is left unattended for 3-4 days Insufficient vehicles resulting in waste left unattended Dumping of waste in road side drains Contracts for nalla cleaning and road sweeping Hiring of Labor on contract basis for nalla cleaning and road sweeping for 2 months prior to monsoon and for about a month during major festivals The contractor was paid Rs. 1,200 per trip but now fixed at Rs. 1,500 per trip WNP is falling short of 15 people for nalla cleaning

39 Infrastructure is available but plant is not in operation
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED SOLID WASTE MANAGEMENT – SEGREGATION, TREATMENT AND DISPOSAL OF WASTE Waste collection and (informal segregation) by informal groups About 50 people divided into 2 groups for collection of waste in segregated manner Rag pickers – Recyclable waste collection randomly from waste bins and open dump sites Feriwallas – recyclable waste collection from residential areas About 100kg of recyclable materials like glass, paper, plastic bottles and other scrap is collected everyday Waste Collected Quantity Earning/month by rag pickers Plastic 500 kg/ month Earning by rag pickers = 3,000-5,000 Earning by private contractor = Rs. 40,000-50,000 Glass Glass bottles 17,000-20,000/month Dumping ground – 3km away from the city Treatment and disposal Dumping ground is located 3 km north of the town No scientific treatment and disposal techniques Collected waste dumped without segregation Infrastructure is available but plant is not in operation Vermi composting plant- Waste of 20 MT per month treated which involves manual segregation Managed in year by private contractor on a contract basis for Rs. 95,000 per month including the labour cost and machine The vermi-compost pit installed by the ULB was to be operated by the contractor Approx. earning of ULB Rs 15,000 per month (30% of the income from the sale of vermi-compost) Due to issue of timely payments and management, plant is not in use Vermi compost plant Vermi-composting is re-operationalised after preparation of City Sanitation Plan

40 Improving D2D coverage from 80% upto 100%
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED SOLID WASTE MANAGEMENT – KEY ISSUES AND SUGGESTED IMPROVEMENTS COLLECTION TRANSPORTATION TREATMENT DISPOSAL KEY ISSUES 81% D2D coverage Slum areas and new developments are not covered Irregular practice of Nalla cleaning and its waste collection No Segregation of the waste at source Inadequate human resource for daily collection of waste Lack of adequate infrastructure for transportation of collected waste Issue of management of available of vehicles Vermi-composting plant is not in operation Presence of open drains increases the practice of dumping of waste into nallas No scientific treatment facility No segregation of the waste at source Lack of scientific method of disposing the waste. At present waste is burnt in open land and dumped on wasteland Improving D2D coverage from 80% upto 100% Augmenting number of vehicles Periodical cleaning of nallas STRATEGY Short term Mitigating existing gap Operationalising existing vermi-composting plant Increase coverage of D2D service to 100% Initiate pilot for central commercial area with involvement of CBO/ women welfare/ SHG Initiate of pilot project for segregation at source Provision of 1 auto-tipper used for door to door collection Implement user charges for SWM towards achieving O&M cost recovery Restoring existing vermi-composting plant Developing landfill site Augment required human resource and experts on contractual manner Developing a regional approach- Considering the regional urban centres near Wai Midterm Upgrade service level and increase coverage Explore scope for using SHGs/NGOs, CBO’s rag pickers in D2D collection/segregation Introduce contractual arrangement for D2D collection, street sweeping and cleaning of drains Formulate/enforce bye-laws and guidelines to prohibit littering Augment vehicles for collection and transportation of solid waste according to population growth Implement user charges for solid waste management services Initiate citywide segregation of waste at source through involvement of NGOS, CBOs, Self Help Groups, informal groups, etc. Can rag pickers be involved in segregation practices? Exploring alternatives to involve CBOs/SHGs to promote household level segregation Long term Achieve long term sustainability

41 Rs. 30.7 crores Rs. 2 crores SANITATION PROPOSALS User interface
Collection Conveyance Treatment Reuse/disposal Access to Toilets and Wastewater Proposal Refurbishment of all community toilets in Slum and Non-slum areas (Rs. 3.4 crore) Provision of individual toilets with septic tanks in Prabhag 3 for 2,093 HHs with Rs. 15,000 per HH (Rs crore) Continue with existing model of outsourcing O&M of CT Provision of New Public toilets in market and institutional area (Rs crore) Up gradation and Refurbishment of Septic Tanks (Rs crore) Identify new models for O & M of CTs and explore CSR options for PT Rehabilitation and closing of drains (Rs crore) Initiating Citywide Settled Sewer Network (Rs crore) IEC campaigns Introduce Integrated Contracts for SWM and drain cleaning Interceptor Sewer along river bank connecting to Treatment Plant (Rs. 4 crore) Empanel service providers and regulate tariffs for de-sludging/ cleaning De-silting & Rehabilitation of natural drains (Rs crore) Centralised Treatment Facility (MBBR Technology) under NRAP Scheme (Rs. 12 crore) Reuse for Agriculture and Irrigation Purposes Rs crores Solid Waste Management Increasing Door to Door collection of waste in Slums and Newly Developing Areas (Rs crore) Rs. 2 crores Augmentation of Vehicles (Rs crore) Restoring Treatment Plant (Rs crore) Developing inert landfill site (Rs crore) Initiating Pilot for Segregation of Waste at source (Prabhag 4) (Rs crore) IEC campaigns

42 Summary of finances after recasting
WAI: SUMMARY OF BUDGETS Summary of finances after recasting Rs. in crore 2006 2007 2008 2009 2010 2011 Items Actual RE Opening Balance 0.79 3.65 3.14 0.24 1.67 Revenue Account Revenue Receipts 4.92 4.59 5.80 5.93 7.26 10.81 Revenue Expenditure 4.45 4.94 5.47 7.98 10.35 Operating ratio 0.74 0.97 0.85 0.92 1.10 0.96 Capital Account Capital Receipts 3.71 1.58 1.51 4.64 0.99 8.85 Capital Expenditure 1.86 1.62 3.88 0.56 10.60 Capital Utilisation 50% 102% 257% 79% 57% 120% Extra-ordinary Account Extraordinary Receipts 0.73 0.80 1.42 1.53 5.06 1.55 Extraordinary Expenditure 0.98 1.41 2.81 1.54 2.75 4.30 Summary Total Receipts 9.35 6.97 8.73 12.10 13.31 21.21 Total Expenditure 6.49 7.48 11.63 10.66 11.29 25.25 The municipal expenses have increased from Rs. 6.5 crore in to Rs crore in registering a CAGR of 15% Similarly, municipal receipts have increased from Rs crore to Rs crore recording a CAGR of 9%

43 Almost all the capital works are carried out from grants
WAI: O&M EXPENSES Property and water taxes are the major taxes levied by WNP Major grants include NP assistance grant, DA grant Grant in lieu of Octroi and 12th Finance Commission (FC) grants were major which have ceased Other sources include rents from properties, service charges, license fees, etc. Almost all the capital works are carried out from grants 51% of revenue expenses are towards public health of which water supply and sanitation is a part 46% of overall revenue expenses are towards permanent establishments

44 WAI: WATER SUPPLY AND SANITATION (WSS) FINANCES
WSS contributes only 12% towards overall revenue receipts but 37% of the revenue expenses Water tax (Rs. 1,100 per connection per annum) and 12th FC solid waste management grants are major streams but 12th FC grants have ceased Collection efficiency of water tax is only 63% compared to 84% collection efficiency of property tax Around 40% expenses in WSS are towards establishments 43% of expenses in water supply are towards bulk water. The budget has no separate item for electricity Per capita spending on WSS (Rs. 880) is 21% higher than that suggested by High Powered Expert Committee (HPEC), 2011 (Rs. 730)

45 Financing Plan for Wai CSP is prepared for three scenarios
WAI: MUNICIPAL FINANCE FORECASTS The Revenue expenses will grow at CAGR of 4.7%, Whereas the revenue receipts at 9.5 % The budget size will grow to more than Rs. 22 crore by 2022 recoding a CAGR of 6% from the last actual figure The revenue receipts will grow to around Rs crore against expenses of Rs crore in 2022 The revenue surplus is projected to be around Rs 7.7 crore after covering water supply and sanitation deficit of more than Rs. 5 crore Past trends Future projections ‘Business as Usual’ with committed National River Action Plan (NRAP) Programme Full CSP (+NRAP Programme) Comparison of wastewater systems– a) Citywide settled sewer system (SSS) b) On-site sanitation system (OSS) Financing Plan for Wai CSP is prepared for three scenarios

46 Impact of NRAP Programme on Revenue Account
I) BUSINESS AS USUAL – NRAP PROGRAMME Wastewater conveyance and treatment project under NRAP programme Computerisation of water supply and sanitation records is also under process and initiated by state government Project cost Rs. 16 cr State government share – 90% Rs cr ULB share – 10% Rs. 1.6 cr Year -wise Capex required. Additional O&M and revenue expected to be generated Impact of NRAP Programme on Revenue Account Revenue account will continue to show surplus after the NRAP Programme is implemented

47 Water supply Wastewater Solid waste
II) FULL CSP (INCLUDING TOILETS, WASTEWATER, SOLID WASTE MANAGEMENT, WATER SUPPLY, NRAP PROGRAMME) - 1 Water supply Water supply augmentation network Slum infrastructure Water audit Convert public stand posts to group connection Improve collection efficiency of water supply taxes and charges Wastewater Household survey Refurbish septic tanks Community and public toilets Individual toilet provision Sewerage network Settled sewer Suction emptier trucks Interceptor sewer Wastewater treatment facility Storm water drains De-silting and rehabilitation of drains IEC campaign Solid waste Segregation of waste Collection bins Private contract for D2D solid waste collection New vehicles for solid waste transportation Repair existing processing plant IEC campaign

48 Revenue Income and Expenditure
II) FULL CSP (INCLUDING TOILETS, WASTEWATER, SOLID WASTE MANAGEMENT, WATER SUPPLY, NRAP PROGRAMME) - 2 Revenue Income and Expenditure Surplus/(Deficit) of Revenue Account Surplus reduces with implementation of NRAP projects

49 Water supply and sanitation operating plan
II) FULL CSP (INCLUDING TOILETS, WASTEWATER, SOLID WASTE MANAGEMENT, WATER SUPPLY, NRAP PROGRAMME) -3 Water supply and sanitation operating plan Increment in tariff required to sustain operating costs Property tax, water supply tax, wastewater tax and solid waste charges Water supply and sanitation capital plan Grants of around Rs. 25 crore is required to implement all the proposals of CSP

50 COMPARISON OF COSTS FOR WASTEWATER TECHNOLOGIES
III) COMPARING WASTEWATER (WITH TOILETS) PROPOSALS- 1 COMPARISON OF COSTS FOR WASTEWATER TECHNOLOGIES a) Citywide settled sewer system (SSS) b) On-site Sanitation System Status of Revenue Account

51 a) Citywide settled sewer system (SSS) b) On-site sanitation system
III) COMPARING WASTEWATER (WITH TOILETS) PROPOSALS- 2 a) Citywide settled sewer system (SSS) ~ Rs. 1.1 crore/annum operating expenditure Rs crore capital expenditure requirement b) On-site sanitation system ~ Rs. 1.0 crore/annum operating expenditure Rs. 26 crore capital expenditure requirement

52 Tariff increase required Sources of funds (Rs. in crore)
FINANCING PLAN SUMMARY FOR CSP CSP options Capital Finances Operating Finances Tariff increase required Base tariff = Rs. 2,182/HH/ annum Sources of funds (Rs. in crore) Average per annum (Rs. in crore) Grants ULB funds Private (HHs, PPP, micro -credit) Total Capex Additional Opex Additional Revenue Internal funds Debt I) Business as Usual (BAU) scenario with committed projects 17.30 3.80 0.00 21.1 0.93 0.07 - II) Full CSP proposal with water supply actions 25.00 14.00 2.30 41.3 1.50 0.30 Rs. 2,768 (27%) III) Proposal with only wastewater technology options A. Citywide settled sewer 22.50 7.70 30.5 1.10 0.17 B. On-site sanitation system 17.40 7.40 1.20 26.0 1.00

53 Capital cost assumption Operating cost assumption
ASSUMPTIONS FOR CSP ACTIONS CSP Actions - WAI Capital cost assumption Operating cost assumption Funding source (All costs in Rs. in crore) Unit costs Capex Unit cost O&M Grants ULB Private Committed projects Intercepting sewer along river under NRAP Rs. 50 lakhs/km 4.00 5% of capex 90% 10% - Wastewater treatment plant under NRAP Rs. 240 lakhs/MLD 16.00 7% of capex Slum infrastructure (342 HHs water supply + toilets) under IHSDP No details available Computerisation of water supply and sanitation records 0.33 Rs lakhs/ year Water supply actions Laying new distribution network lines (1,500 connections, 11 km) Rs. 20 lakhs/km 2.20 Increasing connections from existing water supply network (500 connections) Convert public stand posts/public taps into group connections Water Audit 0.09 100% Improvement in collection efficiency of water supply charges and taxes Sanitation actions Conduct household survey to assess wastewater service Rs. 15/ HH 0.01 Construct new soak pits (5,333) Rs. 3,000/ soak pit 1.60 50% Provision of safe sanitation disposal system to existing unsanitary toilets (20% septic tanks of individual toilets – 1,112 + upgradation of septic tanks all 46 CTs + upgrade 490 to septic tanks for OSS only) Rs. 5,000/individual toilet septic tank Rs. 10,000/ CT septic tank 2.20 (Settled) 2.44 (OSS) Improve condition of existing community and public toilets (10 blocks) Rs. 3 lakhs/block 0.30 Rs. 5,000/ block/month (for all CT & PT) Construction of community and public toilets (4 PTs, 31 seats) 4.25 lakhs/ block 0.17 Rs. 5000/block/ month Construction of additional individual toilets in non-sewered areas (2093 toilets in non-slums) 15,000/ toilet 3.14 IEC campaigns for ODF cities 0.23

54 Capital cost assumption Operating cost assumption
ASSUMPTIONS FOR CSP ACTIONS CSP Actions - WAI Capital cost assumption Operating cost assumption Funding source (All costs in Rs. in crore) Unit costs Capex Unit cost O&M Grants ULB Private Wastewater actions Upgradation of open drains to closed drains Rs. 7.5 lakhs/ km 1.65 - 100% Citywide settled sewer (56.6 km) Rs lakhs/km 4.60 2% of capex 90% 10% Increase collection of septage from current collection capacity (additional 25 trips/ month) Rs. 100/ trip Procurement of suction emptier trucks Rs lakhs/ truck 0.20 10% of capex Construction of sludge treatment facility Rs lakhs/cu. m 0.10 5% of capex De-silting and rehab of natural drains 1.38 Solid waste actions Conduct household survey to assess solid waste service Rs / HH 0.01 Segregation of waste collection and transportation Rs / HH Engage with private service providers for sold waste management (1,300 HHs) Rs lakhs/ month (Rs. 92/ HH) IEC campaign for compliance and segregation 0.15 Procurement of new vehicles solid waste collection Rs lakhs/ auto tipper 0.035 Repairing of existing processing plant 0.02 Rs. 95,000/ month (Rs. 15,000/ month as revenue)

55 Thank you CITY SANITATION PLAN, WAI
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED


Download ppt "CITY SANITATION PLAN - WAI"

Similar presentations


Ads by Google