Download presentation
Presentation is loading. Please wait.
Published byCharleen Parsons Modified over 6 years ago
1
Green Infrastructure Contractor Training Program 5WKS COST FREE
City of Detroit Green Infrastructure Contractor Training Program 5WKS COST FREE
2
CONTENTS Program Implementation Drainage Charge
Introduction to Stormwater Natural Habitats Elements of Landscape Design Elements of Green Infrastructure Construction Techniques
3
Construction Techniques
Depaving Excavation and Subgrade Concrete work Liners and Geotextiles Underdrains Aggregates Soils Bioretention
4
Maintenance of Green Infr
Designing and building maintenance Short-term (years 1 and 2) Long-term (beyond year 2) Techniques
5
Field Training Site Visits to installed projects
Communicating with neighbors
6
PROGRAM IMPLEMENTATION
Program Overview Permitting Requirements Contractor obtained permits Inspections and Coordination Excavated Materials Non-Residential vs. Residential Prop
7
DRAINAGE CHARGE General principles Design details
Placing the stormwater Inspection and Acceptance Final testing and sign-off Grades and Elevations Infilitration
8
INTRODUCTION to Stormwater
Systems and Drainage Stormwater Runoff Stormwater Management
9
NATURAL HABITATS Planting materials Placement Timing Protection
Maintenance
10
ELEMENTS of LANDSCAPE Site Selection and Site Planning
Slope and Natural Drainage Area
11
ELEMENTS OF GREEN Michigan LID Manual Aesthetic Expectations
Biorentention Downspout Disconnection Disconnecting impervious area Rainwater Harvesting Rainwater Gardens
12
ELEMENTS of GREEN Bioswales Permeable Pavements Green Roofs
Asphalt – mix, placement, rolling, tacifier Concrete – contractor certification program Interlocking pavers – setting bed, joint mat Green Roofs Green Streets and Alleys
13
SITE PREP Limits of Construction Tree Protection Soil Protection
Temporary Soil Erosion
14
DEPAVING Pavement removal and disposal
Soil restoration and pavement removal Grading Vegetation
15
Excavation and subgrade
Excavation – material disposal Compaction Equipment Soil conditioning Flat means flat
16
CONCRETE WORK Precast MHs, CBs, other structures Poured in place
How to protect subgrade during concrete
17
FUTURE PARTNERS NMCA NAMCE NOMA DDF U.S. GBC PACE
18
FUNDERS Erb Foundation DEGC BSEED DWSD GLWA
19
CONTACTS Tim Miles DEGC Palencia Mobley GLWA Marcus Jones DTC
Dave Jones BSEED
20
DATES October 1, 2016 Engineers Training
February 1, 2017 Contractors Training March 1, 2017 Commercial Customers March 1, 2018 Residential Customers
21
CONTACT Marcus Jones Director Detroit Training Center 313.221.5876
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.