Download presentation
Presentation is loading. Please wait.
1
JAXA CCSDS Secretary Office
JAXA CCSDS Status November, 2009 ESA/ESTEC Noordwijk, Netherlands Kaneaki Narita JAXA CCSDS Secretary Office CMC meeting, Nov., 2009
2
Recent Launch Information
CCSDS compliant spacecraft JEM Exposed Facility was carried to ISS by space shuttle on July 15, 2009. Launched: HTV Technology Demonstration Model was launched by H-IIB rocket on September 10, 2009. CMC meeting, Nov., 2009
3
Spacecraft Implementations
JAXA adopted AOS (including TM) and/or TC for 18 spacecrafts by October, 2009, and 5 spacecrafts to be launched in two years. ‘97 ‘98 ‘99 ‘00 ‘01 ‘02 ‘03 ‘04 ‘05 ‘06 ‘07 ‘08 ‘09 ‘10 ‘11 ETS-VII ASTRO-E ADEOS-II ASTRO-EII SELENE GOSAT GCOM-W1 PLANET-B MUSES-C ALOS SDS-1 WINDS Ikaros ASTRO-F JEM-EF JEM-ELM PLANET-C SOLAR-B HTV-DM JEM-PM HTV-01 ETS-VIII QZS-1 CMC meeting, Nov., 2009 3
4
CSS Implementations Promotion of Transfer Service utilization
JAXA coordinated with ESA on SLE connection for emergency cross support of ENVISAT and ERS-2 with new GW configuration between JAXA and ESA ,and conducted interface test and tracking ENVISAT and ERS-2 by JAXA GN. Extension of Transfer Service function JAXA is implementing RCF service function to TSX (Tsukuba SLE gateway for Cross support) for provider-side and user-side. CMC meeting, Nov., 2009 4
5
CSS Implementations Service Management interoperability validation
JAXA will upgrade SCCS-SM service-user prototype (Red-3.3) for interoperability test with JPL SCCS-SM service-provider prototype. New network planning system New network planning system (INPS : INtegrated Planning System) is under development. This system will integrate current GN and SN planning systems and establish seamless connections with other agencies referring to SLE-SM specification. CMC meeting, Nov., 2009
6
CCSDS WG Status (CSS and SEA)
CSS/SM WG JAXA is coordinating SCCS-SM (R-3.3) interoperability validation with JPL. The test configuration and schedule are under negotiation. CSS/CSA WG JAXA chairs the Space Communication Cross Support Architecture Working Group JAXA is editing the draft magenta book on Space Communication Cross Support Architecture SEA/DDOR WG JAXA joined WG review of draft DDOR Magenta Book and coordinated DDOR interoperability validation among ESA/JPL/JAXA. JAXA-JPL: Done: May 2009, Planned :March 2010, JAXA-ESA: Planned: Dec. 2009 JAXA drafts a part of DDOR Raw Data Exchange Format Blue Book and DDOR Green Book. CMC meeting, Nov., 2009 6
7
CCSDS WG Status (SLS and MOIMS)
SLS/OCM SIG JAXA intends to join a meeting to review of the charter and the white book. Optical Coding and Modulations MOIMS/NAV WG JAXA joined WG review of following Books to add Orbit Mean-Elements Message (OMM) responding to SC14 request. ODM V2 Prototype Test Plan/Report Nav. Data Green Book NDM/XML Red Book CMC meeting, Nov., 2009
8
CCSDS WG Status (SIS) SIS/DTN WG
JAXA joined WG review of draft Green Book. Delay-Tolerant Networking protocol JAXA conducted computer simulation for DTN and started the feasibility study for DTN experiments on ISS-DRTS (Data Relay Test Satellite) with NASA. SIS/MIA WG JAXA joined WG review of draft Green Book Motion Imagery & Applications CMC meeting, Nov., 2009 8
9
CCSDS Standard Infusion Status
CMC meeting, Nov., 2009
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.