Vibration Isolation Group
Two-layer configuration Budget → tunnel group Schedule Installation and Maintenance Short Inverted Pendulum LCGT A-review of VIS (20 Dec., 2010) 1
2
Generalities 4m φ (→8m x 12m) x 4m h (→7m) upper tunnel containing pre-attenuator 1.2m diameter 5m tall bore-hole with SAS chain 5.5m (→8m) tall containing main beam and cryostat
3
(2) Schedule
4
(3) Installation and Maintenance
Ease of installation No need of large, expensive rigid structures Much lighter crane (1t) requirements
5
Disposition of GAS filters
Case (1): 4 filers are placed every 2m. Eddy current damping to the Filter1 works effectively (<10min). Careful wiring between filters is necessary. One long wire (in TAMA) → Short wire chain with anchored connector. Case (2): 3 filters are inside the upper chamber. It is difficult to damp the torsion mode (>1h). If thick 7-m wire is used, a frequency of the wire resonance becomes too low (~10Hz). Maintenance of filters is easer.
6
Damping of torsion mode
Case (1) Case (2) Filter0 3.74mm x 2.1m 3.42mm x 0.8m Filter1 3.44mm x 2.1m Filter2 3.11mm x 2.1m 3.98mm x 7.0m Filter3 2.74mm x 2.1m CB 2.45mm x 1.0m 2.44mm x 1.0m by T. Sekiguchi
7
(4) Short Inverted Pendulum
Pre-isolator footed on solid rock It was found that small size = better performance Easy of access for pre-isolator tuning
8
Performance of IP Short IP is sensitive to the load. Performance
by H. Ishizaki Short IP is sensitive to the load. Performance Long IP (NIM A582, 683) ~50dB Short IP (NIM A598, 737) ~80dB
9
Disadvantages Need new bore-holes to re-position any optical element
Need to know where to locate all mirrors ! Will need 1200 mm diameter or oval boreholes to allow for ±100 mm tuning of PR, SR, ITM mirrors
10
In the case of one layer. External rigid structure
Base for IP on bottom of the chamber like TAMA-SAS → It is difficult to apply to Type-A system.