“A simple Story for a simple Challenge” Gilles Bocabarteille

Similar presentations


Presentation on theme: "“A simple Story for a simple Challenge” Gilles Bocabarteille"— Presentation transcript:

1 “A simple Story for a simple Challenge” Gilles Bocabarteille
2ème Conférence d’Asset Management en France, le 12 février 2015 “A simple Story for a simple Challenge” Gilles Bocabarteille Chief Operating Officer

2 Summary About Ocean Rig Our Business Model Our Challenge Our Response

3 Private / Public Shipping Assets - Oil & Gas Growth Oriented
Cardiff - Dryships Over 13 billion US $ in Assets Private / Public Shipping Assets - Oil & Gas Growth Oriented DRYBULK SEGMENT CONTAINERS SEGMENT TANKER SEGMENT OFFSHORE DRILLING LNG SEGMENT OFFSHORE SERVICES Public/Private 29 x Capesize 28 x Panamax 2 x Handymax 9 X NBs Av. Age: 6 yrs Private 1 x 6,500 TEU > 10% of Danaos (54 vessels in the water) Public / Private 4 x VLCC 12 x Suezmax 22 x Aframax 1 x NB Av. Age: 5.6 yrs Public 2 x UDW SS 7 x UDW Drillships in the water 4 x UDW NB Drillships Private Fuji LNG (148K m3) Corcovado LNG (160K m3), Kita LNG (160K m3) Palu LNG (160K m3) Yari LNG (160K m3) Public 2 x PSVs (Platform Supply Vessels) 5,150 hp 4 x OSRVs (Oil Spill Recovery Vessels) 5,150 hp

4 Worldwide drilling experience
Ocean Rig Operating in Ultra Deep Waters since 2001, having drilled more than 200 wells for over 30 different customers. Drilled in harsh environments and in nearly every Deep Water area of the world. Our people Management team with an average of 23 years in Offshore Drilling Industry. More than 2,400 Employees onshore & offshore. Worldwide drilling experience Selected clients

5 Ocean Rig Harsh Envir/ment UDW Semis
Sister drillships provide benefits from standardization NEW GENERATION 5th generation Semisub/bles Four 6th generation drillships Five 7th generation drillships Two NEW generation NB drillships Ocean Rig Corcovado Ocean Rig Olympia Ocean Rig Mylos Ocean Rig Skyros Ocean Rig Athena Leiv Eiriksson Eirik Raude TBN Early 2017 TBN Mid 2017 Ocean Rig Poseidon Ocean Rig Mykonos Ocean Rig Apollo Early 2015 Ocean Rig Santorini Mid 2016 Built at Dalian/Friedman Goldman Irving Built at Samsung H.I. Under construction at Samsung H.I. Sister drillships with common equipment , spare parts and training standards Up to 12,000 ft. water depth capability Up to 7,500-10,000 ft. water depth capacity Up to 10,000-12,000 ft. water depth capability 7 ram Blowout Preventers Up to 40,000 ft. drilling depth capability with 6 and 7 ram Blowout Preventers Accommodations for up to 240 people Up to 30,000 ft. drilling depth capacity Dual derricks for increased drilling activity/efficiency Fully integrated design Two of only 15 drilling units worldwide equipped to operate in both ultra-deepwater and harsh environment Accommodations for up to 215 people on board Variable Deck Load of 24,000 mt Increased deck space Increased hoisting and riser capacity

6 Capital intensive - $700M / Rig Daily rate – $500k / day
Ocean Rig – Business Model Capital intensive - $700M / Rig Daily rate – $500k / day Operation 24/7 SIMPLE….

7 “Never Stop Operating and no compromise to Safety”
Ocean Rig – Business Model “Never Stop Operating and no compromise to Safety” - and preserving our asset - and being cost effective - and pleasing our client - and delivering efficient operations - and complying to international regulation and international regulation - and being flexible - and training new workforce - and ….. SIMPLE…..

8 Oil Co cutting programs and budgets Operating Efficiency 90-95%
Ocean Rig - Challenge Macondo 2010 Oil …. 45$!! Oil Co cutting programs and budgets Operating Efficiency 90-95% 500 employees in 2011, 2400 in 2014 SIMPLE….

9 Investment of about $7m for the Drilling and Marine simulators alone
Ocean Rig - Response Investing in People Investment of about $7m for the Drilling and Marine simulators alone

10 Investing in the Asset Management
Ocean Rig - Response Investing in the Asset Management

11 Average 94% Operating Avaibility …….. Plus coming Major Outage 3-4%
Ocean Rig - Response Average 94% Operating Avaibility …….. Plus coming Major Outage 3-4% 90% vs 95% Availability Target SIMPLE…… Very SIMPLE… our Assets are new!!

12 Ocean Rig - Response Asset Management

13 Ocean Rig - Response “5 year” major Outage

14 3% for Operational Stoppage +2% for major Outage
Ocean Rig - Response 3% for Operational Stoppage +2% for major Outage 95% of Operating Availability ……. SIMPLE…..