1 Profession Practices (ECIV-5105)
The Islamic University of Gaza- Civil Engineering Department Profession Practices (ECIV-5105) Lecture 2: Project Team By Husam Al-Najar

2 1. The Owner: Internal Structure
Project team 1. The Owner: Internal Structure Capital Projects Officer (CPO) : Strategic Planning Financial Officer: Financial Planning Owner’s Project Manager: Tactical Level Supervision Owner’s Inspector: Operational Decisions End Users: Directly or Indirectly Represented Typical Interest: To achieve an efficient product delivery mechanism with a simple structure of responsibility reduce schedule and cost, increase quality, reduce claims, increase innovation and constructability, and increase flexibility in both their capital investment and the construction process) تخفيض الجدول الزمني والتكلفة، وزيادة الجودة، والحد من المطالبات، وزيادة الابتكار الإنشائي، وزيادة المرونة في كلا من استثمار رأس المال وعملية البناء) Perfect Owner? The one whose only requirement is some respect for the budgetمن كان الشرط الوحيد هو تقدير الميزانية The one that knows exactly what needs to be done and how أن يعرف بالضبط ما يجب القيام به، وكيف

3 Claims: commonly arise between the parties to construction contracts
Claims: commonly arise between the parties to construction contracts. This can be as a result of problems such as; delays, changes, unforeseen circumstances, insufficient information, and conflicts. Claims might be made for loss and expense, extension of time, liquidated damages and so on. The contract should set out what can constitute a claim and how it should be dealt with. There may also be claims associated with the appointment of consultants. Force majeure: describes those uncontrollable events (such as war, labor stoppages, or extreme weather) that are not the fault of any party and that make it difficult or impossible to carry out normal business. A company may insert a force majeure clause into a contract to absolve itself from liability in the event it cannot fulfill the terms of a contract (or if attempting to do so will result in loss or damage of goods) for reasons beyond its control. A variation: (sometimes referred to as a variation instruction, variation order or change order) is an alteration to the scope of works in a construction contract in the form of an addition, substitution or omission from the original scope of works.

4 Public & Private Owners
Public Owners Ranging from Real Estate Developers المطورين العقاريين to One-Time Projects Usually Smaller Projects (occasionally Larger Projects also) More Informal Procedures إجراءات أكثر سهولة Usually More Innovation, Cost-Efficiency and Flexibility State, Municipal or Federal Government Usually Large Projects Very Well-Defined Procedures Careful Project Financing (Political accountability (المساءلة السياسية) Public-Private Partnerships Hybrid Owner From Contractor’s and User’s Viewpoint Basic Modes (and Variations): Gov’t Contracts Operations & Maintenance of Existing Facility with a Private Entity Gov’t Sells a Facility to the Private Sector Gov’t Contracts a Company to Build-Operate-Transfer a Project

5 1. The Design Team The Architect: Usually in Contract with the Owner The Engineering Team Structural / Transportation / Geotechnical Engineer Usually Subcontracts Environmental Engineers Mechanical Engineers Electrical Engineers 2. The Construction Team The Contractor’s Project Manager: Oversees Entire Project but Mainly Deals with: Owner Relations Schedule Claims Cost and Budget Issues Major Engineering Issues related to Construction Subcontractor Issues Safety Quality Control

6 Superintendent المشرف
Scheduler Produces and Maintains Job Schedule with the Help of the Engineers and Superintendents المشرفين Early Involvement in the Project Dealing with Multiple Interfaces (Owner, Designer, Superintendents) Excellent Understanding of the Construction Technology and Technique Behind the Schedule Continuously Modifying the Schedule Superintendent المشرف General Superintendent Oversees All Operations of Building the Project Coordinates Subcontractors and Various Field Superintendents Deals with Craft Unions التعامل مع النقابات الحرفية Field (i.e., Assistant) Superintendent Oversee Their Specific Field (i.e., expertise) Operations (e.g., Utility, Earth Support, Concrete, Mechanical, Equipment) Direct the Crews that Work in the Area In Charge of: Time Sheets- Scheduling- Planning- Safety- Quality Control and Subcontractors

7 Project Engineer Oversee All Engineering and Administration Functions of the Project Work closely together with project manager In Charge of: Owner Relations Submittals, Request For Information RFI’s, Changes Leads problem identification, definition, analysis, solution generation, solution implementation and pay requirements Claims Cost Control Subcontractors Field Engineer Daily Reports of Activities Measure Quantities of Work Completed Help Superintendents with Planning and Ordering Permanent Materials Resident Engineer The Owners Representative on the Job Site Makes the Decisions for the Owner and the Owners Engineer

8 Subcontractor The term refers only to the contractual arrangement not to the scope of work Company X performs 2 contracts; one for Owner A and the other for Contractor B Contractual obligation to the original contractor not the owner