GS-AIS On-going work IMWG 12-Mar-2013 Eloy Reguero Fuentes, Cédric Garino
2
Activities created after 08 Jan 2012 Total: 1632 activities Previous totals: X-mas break: 817 activities TS3: 848 activities TS2: 950 activities TS1: 994 activities
3
Activities per facility / week since the 08th Jan 2012 This week
4
Approvals
5
Activities with participants > 100 #ActivityParticipantsTitleFacility 15953302LHCb access to UX85A - OperationLHCb 24074201PS STANDARD : Visites et Inspections - SécuritéPS 24414199TT2 STANDARD : Visites et Inspections - SécuritéPS 24309191PS STANDARD : Visites et Inspections - OPPS 24316191PSB STANDARD : Visites et Inspections - OPPS Booster 24654155BTVSS Point 2LHC 24677155BTVSE Point 6LHC 24676155BTVM Point 4LHC 24678155BTVST Point 8LHC 24679155BTVSI Point 8LHC 24663155BTVST Point 2LHC 24664155BTVSI Point 2LHC 24658155BTVSS Point 8LHC 24665155BTVM Point 3LHC 24767130LHCb access to UX85A - Operation - LS1LHCb 24382123TT2 STANDARD : maintenances générales instrumentationPS 23380122RF commutation switch at BPMSW.1L5LHC 22100122Head-Tail & WCM MaintenanceLHC 24526122PSB STANDARD : maintenances générales syst. de l'instrumentationPS Booster 24088122PS STANDARD : maintenances générales instrumentationPS 22072115Inspection, tournée de vérification, correctifs en UW25LHC 25535115Piquet TE-VSC P4LHC 24440109UX85 - Travaux câblage new UPSLHCb 23948108RP ALIMS-LHC SPSLHC 23950108RP ALIMS-LHC SPSLHC 24207108IMPACT STANDARD: maintenance générale syst refr. et ventilationSPS 23923108RP ALIMS LDMAD-Target 23949108RP ALIMS-LHC SPSLHC 23908108RP ALIMS LDMPS 22692104QU (CRYO UNDERGROUND) Maintenance CRYOPLANTS en CAVERNES - TS#4 2012LHC 20190104QU (CRYO UNDERGROUND) Maintenance CRYOPLANTS en CAVERNES - TS#3 2012LHC 22693102QU (CRYO UNDERGROUND) Préparation LS1 - CRYO TUNNEL - TS#4 2012LHC 20189102QU (CRYO UNDERGROUND) Préparation LS1 - CRYO TUNNEL - TS#3 2012LHC
6
2.3 New features Public APIs (read / write / approve) New facility Computer facilities Participant notifications – Email: 1220 – SMS: 901 New RP fields (job code, specific job code, equipment code)
7
2.4 New features Visits View / browse mode Bulk approval Activity scheduler refactoring New pdf report Activity Responsible New field Individual dose alarm per intervention [uSv] Operational dosimetry: Impact -> Mirion Demo as Peter : https://devpptevm.cern.ch/impact/?work_as=432750
8
Integration IMPACT / DOSISERV View data exposed to DOSISERV Gather dose data from DOSISERV (v.2.5) IMPACT: 12345 IMPACT: 98765