Experiences with the Team Software Process

Similar presentations


Presentation on theme: "Experiences with the Team Software Process"— Presentation transcript:

1 Experiences with the Team Software Process
CSC 3380 Lecture 09

2 Sources CrossTalk, vol. 15, n. 9

3 Ways to Use TSP As a vehicle to implement CMM key tasks and activities
As a way to increase quality and profitability As a way to improve project control and visibility As a model for organizational management

4 Implementing CMM key tasks
TSP gives mechanisms for project: planning and scheduling assessment control quality TSP provides the bulk of key activities, with a thin layer of management for CMM process analysis and improvement configuration management quality assurance

5 Tracking Software Costs
Table 3

6 Tracking Software Costs observations
Breakdown of specific tracked activities Consider post-delivery defect costs as well Front-loading of effort Marked improvement in development costs Almost total elimination of post-delivery defect costs Dramatic improvement in overall costs Smoother use of time across project lifetime

7 Effort Usage

8 Payback Curves – TSP fixed costs are about 8% extra

9 Project Control and Visibility
TSP, using PSP, provides good tracking data Tasks can be broken into much smaller units This gives a better idea of true earned effort, since some progress is visible in each report Tracking tools give visibility to project status Estimates have far better predictive power

10 Predictive Power Figure 1

11 Earned Value Graph Figure 5

12 More Responsive Control by Frequent Review
Strict process model Good breakdown Good projections Opportunity to replan Right work at right time in right order Figure 7

13 Better Management Avoid problem driven management (putting out fires) in order to work on real goals TSP related effort is about 17.5% launches and relaunches and postmortems data gathering status meetings defect logging and role manager tasks Valuable, not just overhead 70% increase in productivity, 200% in value 37.5% reduction in schedule 900% increase in quality Burden and privilege of management is on the team, not the organization


Download ppt "Experiences with the Team Software Process"