WEST POINT BRIDGE DESIGN 2011
Group 5 Black & Gold (Mun Gun-hak,Park Seong-mo)
2
Contents Slogan Foundation Design Trouble & Solution Solution Process
Cost of Completed Bridge
3
Slogan A car the car Pass
4
Foundation Design Car Shape Bridge
5
Trouble & Solution The bridge was !! TWISTED
6
Trouble & Solution The bridge is absolutely !! STABLE
7
Solution Process What’s the DIFFERENCE? Change Thickness
Solid Steel ↓ High-Strength Low alloy Steel Change Thickness Create more ‘ex’ shape structure Unstable Stable Stable What’s the DIFFERENCE?
8
Cost of Completed Bridge
$1,577,964 ≒ ₩1,767,319,000 (한화 약 17.6억)
9
- Thank you for your attention –
Black & Gold