ANALYTICAL METHODS IN MAINTENANCE

Similar presentations


Presentation on theme: "ANALYTICAL METHODS IN MAINTENANCE"— Presentation transcript:

1 ANALYTICAL METHODS IN MAINTENANCE
What Maintenance Analysis method Examples of Using Maintenance Data

2 Maintenance Analysis  Dependant upon criticality, differing levels of analysis effort should be applied.  For the top 5-10% quantities risk and performance analysis may be warranted  For the next 40-50% use template a rule-based methods (such as RCM).  At the lower levels of criticality, not even simple analysis is worthwhile, and instead may rely on manufacturer’s recommendations or retain current practice.

3 ANALYSIS/SIMULATION SOFTWARE
 For the top 5-10% quantities risk and performance analysis may be warranted: ANALYSIS/SIMULATION SOFTWARE ** SIMLOX Powerful and versatile simulation tool for event based simulation and analysis of complex operational and logistic support operations. Provides graphs on system availability, resources utilisation, actual versus requested mission time, etc ** LOGAN Monte Carlo simulation tool Evaluates availability of complex systems. Can include effect of manning levels, spares holdings, redundant and standby systems, etc

4  For the top 5-10% quantities risk and performance analysis may be warranted:
AvSim+ AvSim+ is an availability simulation and system optimisation tool developed specifically to handle the complexity of large plants and systems. It uses Monte-Carlo simulation to calculate the expected system reliability, availability and capacity performance over a chosen life cycle.

5 Maintenance PLANS: Horses for Courses
 Dependant upon criticality, differing levels of analysis effort should be applied.  For the top 5-10% quantities risk and performance analysis may be warranted  For the next 40-50% use template a rule-based methods (such as RCM).

6 RCM SOFTWARE ** RCM Turbo
Australian owned and developed expert methodology for the implementation of reliability centred maintenance strategies. A unique decision support platform leading directly to new schedules

7 DISPLAYING MAINTENANCE AND RELIABILITY DATA

8 Log Scatterplot of mean repair times versus number of failures with limit values.
“Downtime Priorities, Jack-Knife Diagrams and the Business Cycle” Peter Knights, May 2004 issue The Maintenance Journal

9

10

11

12 CASE STUDY USING MAINTENANCE DATA

13 ELECTRIC MOTOR GEAR BOX Bearing 1 Bearing 2 coupling Casing seal Shaft seal

14 900 hrs 450 hrs 36 14 MTBF Failures over a 48 month period :-
ELECTRIC MOTOR GEAR BOX Bearing 1 Bearing 2 coupling Casing seal Shaft seal Failures over a 48 month period :- MTBF DOWNTIME No FAILURES FAILURES >3hrs DT 900 hrs 450 hrs 36 14

15 Bearing 2 2000hrs 427hrs 16 12 ELECTRIC MOTOR GEAR BOX Bearing 1
coupling Casing seal Shaft seal MTBF DOWNTIME No FAILURES FAILURES >3hrs DT Bearing 1 4000hrs 9hrs 8 2 Bearing 2 2000hrs 427hrs 16 12 Coupling 8000hrs 2hrs 4 Shaft seal 6000hrs 5hrs 6 Casing seal 16000hrs

16 HISTORY OF FAILURES BEARING 2
Clock hrs Hrs to fail History of failure 1. 190 Bearing incorrectly……… 2. 205 15 Lack of……… 3. 3705 3500 4. 3785 80 5. 4105 320 6. 8305 4200 7. 8330 25 8. 8570 240 9. 13570 5000 10. 17570 4000 11. 17630 60 12. 22130 4500 13. 22570 440 14. 26670 4100 15. 26710 40 16. 29510 2800

17  1st failure at 190 hrs 2nd failure at 205 hrs
3rd failure at 3705 hrs 4000hrs 0hrs

18 1st failure at 190hrs 2nd failure at 205hrs 3rd failure at 3705hrs
8000hrs 12000hrs 16000hrs 20000hrs 24000hrs 28000hrs 32000hrs

19 BEARING 2 *RANKED ORDER* BEST WORST 1 15.00 2 25.00 3 40.00 4 60.00 5
80.00 6 190.00 7 240.00 8 320.00 9 440.00 10 11 12 13 14 15 16 BEST *RANKED ORDER*

20 HISTOGRAM OF BEARING No.2 FAILURES
NUMBER OF FAILURES

21 WEIBULL ANALYSIS It allows analysis of HOW COMPONENTS FAIL.
If it is found that failure is AGE RELATED then you can also identify the optimum REPLACEMENT INTERVAL

22 BEARING 2 *RANKED ORDER* 1 15.00 2 25.00 3 40.00 4 60.00 5 80.00 6
190.00 7 240.00 8 320.00 9 440.00 10 11 12 13 14 15 16 *RANKED ORDER*

23 WEIBULL ANALYSIS RELCODE Data Analysis Software
RELCODE is a software package for Weibull analysis of Failure Data.

24 MONTE CARLO SIMULATION
6 NUMBER OF FAILURES 5 4 7 1 2 3 Use random numbers to recreate the failures Number range 1 to 7 If No. 1 then this is a failure at 2500 hrs

25 1st failure at 2500 hrs 0hrs

26 Add repair hrs and cost data
6 NUMBER OF FAILURES 5 4 7 1 2 3 Add repair hrs and cost data

27 1st failure at 2500 hrs Repaired at 2520 hrs cost $1000 0hrs Using more random numbers you can continue generating failures and repair/cost data. You may test a number of fixed time replacement events, test which failures they will prevent and see which replacement time is cost effective. You can run the simulation for 100yrs for similar machines operating in parallel and establish number of man hrs per week required to maintain the machines.