1 6th DOSAR Workshop University Mississippi Apr. 17 – 18, 2008
UTA Site Report Jae Yu Univ. of Texas, Arlington 6th DOSAR Workshop University Mississippi Apr. 17 – 18, 2008

2 Introduction UTA a partner of ATLAS SWT2
Actively participating in ATLAS production Kaushik De is co-leading Panda development Phase I implementation at UTACC completed and running Phase II implementation at Physics and Chemistry Research Building completed MonALISA based OSG Panda monitoring back online DDM monitoring project completed Working on Achelois, the ATLAS Operations Support System HEP group working with other discipline in shared use of existing computing resources Interacting with the campus HPC community Working with HiPCAT, Texas grid community Co-Linux Condor cluster setup began but going very s-l-o-w 4/17/2008

3 UTA DPCC – The 2003 Solution UTA HEP-CSE + UTSW Medical joint project through NSF MRI Primary equipment for D0 re-reconstruction and MC production up to 2005 Now primarily participating in ATLAS MC production and reprocessing at part of SWT2 resources Other disciplines also use this facility but at a minimal level Biology, Geology, UTSW medical, etc Hardware Capacity PC based Linux system assisted by some 70TB of IDE disk storage 3 IBM PS157 Series Shared Memory system Now being turned into a T3 cluster 4/17/2008

4 UTA – DPCC 84 P4 Xeon 2.4GHz CPU = 202 GHz
5TB of FBC + 3.2TB IDE Internal GFS File system 100 P4 Xeon 2.6GHz CPU = 260 GHz 64TB of IDE RAID + 4TB internal NFS File system Total CPU: 462 GHz Total disk: 76.2TB Total Memory: 168Gbyte Network bandwidth: 68Gb/sec HEP – CSE Joint Project DØ+ATLAS CSE Research 4/17/2008

5 UTA Tier3 Conversion of UTA_DPCC Commissioned 2003
NSF-MRI grant between CSE, HEP, UT-SWM Shared resource 160 cores (Dual Processor 32bit Xeon) 1GB RAM / core 45 TB NAS based storage Rocks 4.3 with SLC 4.6 Several head nodes 4/17/2008

6 Tier 3 specific customizations
Exploring with Scalla topology Provide rootd storage to desktop Provide platform for experimenting with PROOF Testbed for T2  T3 interactions Still maintain production activities Panda Development 4/17/2008

7 SWT2 Joint effort between UTA, OU, LU and UNM
2000ft2 in the new building Designed for U nodes Could go up to 24k cores 1MW Total power capacity Cooling with 5 Livert units 4/17/2008

8 UTA SWT2 Clusters UTA_SWT2 (Phase I) SWT2_CPB (Phase II) UTA_DPCC
Supporting MC Production only Initial deployment of ATLAS project funds SWT2_CPB (Phase II) Supporting MC production and analysis Main cluster for UTA Project Funded UTA_DPCC Supporting MC production and local analysis Tier3 prototype Supporting production system software development NSF MRI Grant 4/17/2008

9 Installed SWT2 Phase I Equipment
160 Node cluster (Dell SC1425) 320 cores (3.2GHz Xeon EM64T) 2GB RAM/core 160GB SATA local disk drive 8 Head Nodes (Dell 2850) Dual 3.2 GHz Xeon EM64T 8GB RAM 2x 73GB (RAID1) SCSI Storage 16TB Storage System Direct Data Networks S2A3000 system 80x250GB SATA drives 6 I/O servers IBRIX Fusion file system Dedicated internal storage network (Gigabit Ethernet) Has been operating and conducting Panda production over a year 4/17/2008

10 UTA_SWT2 (Phase I) Services
OSG 0.8 Compute Element ATLAS specific Gatekeeper Local Replica Catalog DQ2 Site-services (supports all of SWT2) Redundant GUMS server for UTA resources 4/17/2008

11 SWT2 Phase II (CPB) Equipment
50 node cluster (SC 1435) 200 Cores (2.4GHz Dual Opteron 2216) 8GB RAM (2GB/core) 80 GB SATA disk 2 Head nodes Dual Opteron 2216 8 GB RAM 2x73GB (RAID1) SAS Drives 75 TB (raw) Storage System 10xMD1000 Enclosures 150x500GB SATA Disk Drives 8 I/O Nodes DCache will be used for aggregating Storage 10GB internal network capacity In service Future purchases will focus more on the storage 4/17/2008

12 SWT2_CPB Services OSG 0.8 Compute Element Local Replica Catalog
GUMS server for all UTA Resources 4/17/2008

13 ATLAS SWT2 Phase I and II SWT2-PH1@UTACC SWT2-PH2@UTACPB
320 Xeon 3.2 GHz cores = 940 GHz 2GB Ram/core = 640GB 160GB Internal/unit  25.6TB 8 dual core server nodes 16TB of storage assisted by 6I/O server Dedicated Gbit internal connections 200 Optaron 3.2 GHz cores = 640 GHz 2GB Ram/core = 400GB 8GB SATA /unit  4TB 8 dual core server nodes 75TB of storage by 10 Dell MD100 Raid assisted by 8 I/O servers Dedicated Gbit internal connections 4/17/2008

14 SWT2 Growth Courtesy M. Ernst US ATLAS Transparent Distributed Facility Workshop 3/04/08 4/17/2008

15 ATLAS SWT2 Capacity Current Capacity for Project Funded Resources
Total CPU ~ 1,200K SI2K Total Disk ~ 92TB (usable) Additions to SWT2_CPB Total CPU ~ 2,200K SI2K Total Disk ~ 300TB (usable) Future Purchases will be weighted more to storage growth 4/17/2008

16 Network Capacity History at UTA
Had DS3 (44.7MBits/sec) till late 2004 Choke the heck out of the network for about a month downloading D0 data for re-reconstruction Met with VP of Research at UTA and emphasized the importance of network backbone for attracting external funds Increased to OC3 (155 MBits/s) early 2005 OC12 as of early 2006 Connected to NLR (10GB/s) through LEARN ( via 1GB connection to NTGP $9.8M ($7.3M for optical fiber network) state of Texas funds approved in Sept. 2004 Most areas on LEARN lit The “Last Mile” connection problem still exists 4/17/2008

17 LEARN Status 4/17/2008

18 NLR – National LambdaRail
ONENET LONI LEARN 10GB/sec connections 4/17/2008

19 Software Development Activities
MonALISA based ATLAS distributed analysis monitoring A good, scalable system Software development and implementation completed ATLAS-OSG sites are on the LHC Dashboard New server brought back into service for OSG at UTA Completed a DDM monitoring project Working on Achelois, the ATLAS Operations Support System 4/17/2008

20 CSE Student Exchange Program
Joint effort between HEP and CSE David Levine, Gergley Zaruba and Manfred Huber are primary contacts at CSE A total of 10 CSE MS Students each have worked in SAM-Grid team Five generations of the student Many of them playing leading roles in grid community Abishek Rana at UCSD Parag Mashilka at FNAL Sudhamsh Reddy worked for UTA and back into Ph.D program New program with BNL implemented First student on completed the tenure and is on job training Second set of two Ph.D. students at BNL and completing their tenure Participating in ATLAS Panda monitoring project One student working on pilot factory using condor glide-in Finalizing the integration into the regular service Facing some budget cut issues here 4/17/2008

21 The LAW Project Co-Linux based Condor System OU established as the model Had a meeting between OU team and UTA IT management in Feb. during the HiPCAT meeting We are very grateful for the OU team willing to come and help A team of UTA IT personnel designated to work on this project, looking into various aspects Head of Academic Computing Services is the lead Had a meeting with her two weeks ago 28 new machine lab in Engineering as the trial case IT wants to start with 5 machines or so first IT will manage and support based software, OS and Co-Linux All other software related responsibilities on HEP 4/17/2008

22 Conclusions MonALISA based panda monitoring providing info to LHC Dashboard New server was brought up  Waiting for BNL to separate panda monitor servers out Completed a project in DDM monitoring Completed EG2 (photon) CSC note Plan to connect to 10GB/s NLR via 1GB connection to UTD Quite expensive to make the final connectio Involved in ATLAS Computing Operations Support Working closely with HiPCAT for State-wide grid activities Started working on setting up a Co-Linux Condor Cluster 4/17/2008