Download presentation
Presentation is loading. Please wait.
Published byGarey Hubbard Modified over 6 years ago
1
The Four Seasons - December, 1963 (Oh, What a Night)
Elementary Algebra Lesson 9: Rate of Work Get The Math
6
Ingredients 4 tablespoons unsalted butter 4 stalks celery with leaves, finely chopped ½ large Vidalia onion, finely chopped ¼ cup loosely packed fresh sage, chopped 1 ½ tablespoons fresh thyme leaves, chopped 3 cloves garlic, finely chopped Kosher salt and freshly ground pepper 1 ¼ cups chopped pecans 5 cups crumbled day-old cornbread, homemade or store bought 5 cups cubed country loaf bread, toasted 2 1/3 cups homemade or low-sodium chicken broth 4 large eggs, lightly beaten
7
Cornbread Dressing
8
Help Wanted Rapidly expanding national renovations contractor is seeking an immediate hire for an ENTRY LEVEL PROJECT SUPERINTENDENT in the Atlanta area. Our primary market is multi-family renovations for customers coast to coast. The ideal candidate will be someone who is career-oriented and driven to success. Responsibilities will include: Performing daily site supervision of work in-progress on projects in the area, Shopping & negotiation of prices for materials and labor, Assisting Sr. Project Managers with estimating, pricing & preparation of change orders Requirements: * Must be able to travel * Dedication / hard working * Function well in a fast paced environment * Multi-tasking * Proven skill in the supervision & management of renovation projects * Reliable transportation (i.e. truck, car) * Well organized * Possess negotiating skills * Team Player * Aptitude in math * Strong computer skills * Good communication skills
10
Unit 5 – Algebra in Context
Word Wall
11
Perfect Squares …
12
Rate of Work
13
1. A pool can be filled by one pipe in 3 hours and by a second pipe in 6 hours. How long will it take using both pipes to fill the pool?
14
2. An experienced bricklayer can work twice as fast as an apprentice bricklayer. If it takes the two bricklayers 8 hours to finish the job, how long does it take each to do the job alone?
15
3. Water from a tank is being used for irrigation at the same time as the tank is being filled. Two inlet pipes can fill the tank in 6 h and 12 h, respectively. The outlet pipe can empty the tank in 24 hours. How long would it take to fill the tank if all three pipes were open?
16
4. Luis can load his truck in 24 min
4. Luis can load his truck in 24 min. It takes his brother Ramon 40 min to load the truck. How long would it take them to do the job together?
17
5. Sherry can do a job in 60 min
5. Sherry can do a job in 60 min. If her sister helps her, it takes them 36 min. How long does it take her sister alone?
18
6. A roofer can shingle a house in 20 h
6. A roofer can shingle a house in 20 h. If an apprentice helps, they can do the job in 12 h. How long does it take the apprentice alone?
19
7. One machine can print a magazine in 30 min
7. One machine can print a magazine in 30 min. If a second machine works with the first machine, the magazine can be printed in 18 min. How long does it take the second machine to do the job alone?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.