Implementing Finishing Job of Building

Similar presentations


Presentation on theme: "Implementing Finishing Job of Building"— Presentation transcript:

1 Implementing Finishing Job of Building
Implementing Brick arrngement By : SMK Negeri 5 Surakarta

2 GOALS OF LEARNING : Student can identify kinds and size of bricks.
Student can explain kinds of brick construction. Student can make profile of brick arrangement. Student can make stirring Student can do arrange of brick. Teknologi dan Rekayasa

3 REQUIRES OF BRICK ARRANGONG JOB
MATERIAL MUST BE QUALIFIED. Sand must be filtered, the equpment fot stirring must be plastic. Brick arrange is not BAREH Brick arrangement is on sturdy ground. Water which used for mixing must enough The bricks arrangement must be more than 30 cm on the sloop , there is water resistant layer Wall arrangement must be HIGROSKOPIC Every large of 10 m2, installed practice column (Every distance of 2-3 M) 8. Maximum height of arranging every day is 1 meter. (If it is added calcite) , 1.5 M if the mixture is without calcite Brick stand erectly and flat. Teknologi dan Rekayasa

4 STAGE OF INSTALLING JOB OF WALL/BRICK
Material Preparation Profil Preparation/Measurement stick/Measuring Mixture making Watering brick Installing Brick Exactness controll Teknologi dan Rekayasa

5 WALL ARRANGEMENT Quality : hardness ,Strength pressure same colour, Corner Sharpness, flat surface, same size DIMENSION : Thick = 52,5 mm Width= 115 mm Length=23,5 mm Sand (filtered in 3 mm)

6 KINDS OF MATERIAL OF WALL INSTALLING
SUPER BRICK TRADITIONAL BRICK CEMENT STONE LIGHT CONCRETE BATAKO / CON BLOCK NATURAL STONE Teknologi dan Rekayasa

7 EXAMPLE OF QULIFIED BRICK
Teknologi dan Rekayasa

8 2. PROCEDURE OF iNSTALLING
A. Mixture Making * Work system  manual  use mixing tool * Mixture ratio  1 Pc : 1 Kpr : 8 Ps  1 Pc : 2,5 - 3 Ps  1 Pc : 1 Dol : 7 Ps  1 Pc : 7 Ps  Bahan dry mix * Mixing must be plastic Teknologi dan Rekayasa

9 IN BOX MIXING Teknologi dan Rekayasa

10 C. Elbow D. even E. flatness Teknologi dan Rekayasa 10

11 USING STEM WATER PASS Teknologi dan Rekayasa 11

12 PLACING MORTAR AND TAKE THE REMAIN
Teknologi dan Rekayasa 12

13 TRADITIONAL BRICK INSTALLING
String K3 PROFIL Mixture Box K3 Teknologi dan Rekayasa 13

14 B.Spesi * Horizontal Spesi  Thickness 1,5 cm  fully filled
 good binding * Vertical spesi  Thickness 1cm  Shifted 1/4 of brick, ½ of brick  flly filled  neat Teknologi dan Rekayasa 14

15 THE FORM OF SURFACE ON BRICK ARRANGEMENT
Vertical position horizontal Teknologi dan Rekayasa 15

16 3. The Exactness of Brick Arragement
A. Size B. Stand Erectness * Waterpass min1.00 M * Lot BENANG UNTING-UNTING Teknologi dan Rekayasa 16

17 EXPOSE BRICK CONSTRUCTION
Teknologi dan Rekayasa

18 SUPER BRICK ARRANGEMENT WITH STRAIGHT ROLLAX
Teknologi dan Rekayasa

19 INSTALLING SUOER BRIK WITH CURVE ROLLAX
Teknologi dan Rekayasa

20 I BRICK EXPOSE CONSTRUCTION
Teknologi dan Rekayasa

21 BRICK EXPOSE TRADITIONAL ARRANGEMENT
Teknologi dan Rekayasa


Download ppt "Implementing Finishing Job of Building"