Download presentation
Presentation is loading. Please wait.
Published byNigel Jennings Modified over 6 years ago
1
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
3D model of PANDA in maintenance area before moving-in of cryostat during assembly of barrel-EMC before moving-in of central detectors Some integration problems
2
Maintenance area before moving-in of cryostat
View onto the upstream side of the Target spectrometer. A beam (type IPB700, length 12 meters, shown here in green) will be used for installing both the cryostat and the barrel-EMC. The beam will rest on tripods, fine alignment can be done by adjusting the heights of the tripod feet.
3
Maintenance area during assembly of barrel-EMC
The IPB700 beam can be rotated about the longitudinal axis. This feature is necessary for installing the barrel-EMC slices. A gangway around the EMC is needed. Discussion with V. Ferapontov from Protvino is going on.
4
Maintenance area before moving-in of central detectors
After removing the big installation beam the auxiliary platform will be attached to the TS. The DIRC&SciTil-barrel will be installed together with the support structure for the STT. MVD, STT, and Bw-EMC will be assembled on the wide platform shown on the left-hand side. They will be rolled into the magnet on precision rails.
5
Some integration problems
Collision checks on CAD models In CATIA, the collision check can be done in the Assembly Design environment by clicking on this button: Can all CAD programs in use perform this check? If not, please ask for help. Before posting of component models, please perform a collision check and, if the coordinate system used is not the PANDA-IP system, please indicate at least the supposed IP position.
6
Some integration problems
Routing of cables and tubes from barrel-EMC Collision with barrel-DIRC FEE (transparent here) might be possible. Tentative routing would be helpful now. Is help needed? Collision between barrel-DIRC FEE and STT- cable support Solved? Is help needed? Installation of beam tube procedure? steady support? temporary support during moving-in of Bw-EMC?
7
Some integration problems
Routing of tubes for MVD cooling. Space has to be allocated. Is help needed? water tubes compensation solenoid
8
Some integration problems
Downstream side of TS in maintenance position, tripod supports big mounting beam What is needed for rolling-in the Fw-EMC? A transport frame for lowering the Fw-EMC onto rails is already posted on EDMS.
9
Some integration problems
Dipole Muon Filter FEE Muon FEE DS door Location of racks for Muon Detectors? If rack position is fixed cables and hoses have to be arranged in a festoon which allows the Muon Filter to move by 2.5 meters. View onto the downstream side of the Target Spectrometer (from north-west position)
10
Integration problems There are many other problems which wait for a solution ... Thank you for listening