The South African Transport System – Ready to move in 2010 ?
South African Institution of Civil Engineering Transportation Division 7 November 2007
2
Background SAICE presented State of Transport in 2006
Focus in 2007 on 2010 readiness SAICE was invited by the Parliamentary Portfolio committee to prepare “Report Card” on 2010 Symposium held in July 2007 – report back from key role players
3
946 days to kickoff SAICE’s Role Develop objective view
Make a contribution in the form of asking critical questions 946 days to kickoff Acknowledgement to all the authors of slides used in this presentation
4
Question: WHO will decide if the 2010 Soccer World Cup in South Africa was a success ? WHAT are the items they will evaluate ?
5
Participants of July Symposium
LOC (Local Organising Committee) Member of Parliamentary Transport Portfolio Committee (Nthabising Khunau) Dept of Transport SANRAL SAPS ACSA SARCC Gautrain Host Cities GPTRW offered to participate, withdrew
6
Participants (Cont.) 6 of 9 host cities: Joburg Tshwane Cape Town
Nelson Mandela (Port Elizabeth) Mangaung (Bloemfontein) Polokwane Others: Durban Rustenburg Mbombela (Nelspruit)
7
Summary of Symposium Proceedings
8
SA LOC (Local Organizing Committee) Skhumbuzo Macozoma
Vision: strengthen SA image, promote partnerships Pillars of soccer WC: Promote the sport, Increase fan base, Develop competition infrastructure 4th – social legacy Provide high quality transport service -
9
Dept of Transport Lusanda Madikizela
Prepare operational plans INTOP (Initial national transport operational plans) overarching concept and guidelines for host cities - completed Sept 2007
13
SANRAL Nazir Alli Several major road upgrades planned
N17 and N12 will be upgraded around Soccer City ITS / FMS project – 200 km of freeways under camera surveillance Implementing a Freeway Management System with City of Cape Town and Western Cape Province Upgrade of the existing R300 in Cape Town Upgrades in Rustenburg, Polokwane, Mbombela
15
ACSA Goran Vracar OR Tambo Int: Cape Town Int: Durban (“La Mercy”):
Increase capacity from 18 million to 25 million passengers per annum by 2010 Add 5200 parking bays Spend R 3,5 bn Cape Town Int: 7 m to 14 m passengers per annum by 2010 Spend R1,4 bn Durban (“La Mercy”): 4,2 m to 7,5 m passengers per annum by 2010 Spend R 6,8 bn Other national airports: 2,9 m to 4,8 m passengers per annum by 2010 Spend R300 m
19
Gautrain Chris Britz SARCC Dries vd Walt
Complete Airport to Sandton link by June 2010 and possibly the link to Midrand SARCC Dries vd Walt Re-introduced the Railway Police Will upgrade rolling stock with R4,6 bn
23
Host Cities (some highlights)
Joburg (Yoliswa Mashilwane): BRT / SPTN Inner City Distribution System Rea Vaya ITS implementation
26
Host Cities (some highlights)
Tshwane (Dennis Baloyi) Upgrades around Loftus BRT Fan parks not located, operational plans ? Limited ITS
30
Host Cities (some highlights)
Cape Town (Donald Cupido) Well developed operational plan Already identified fan parks and practice venues ITS - FMS
34
Host Cities (cont.) Nelson Mandela (Dalene Campbell) Well organised
Mangaung (Willie Loftus) Well developed Legacy plans Operational plans – waiting for guidance Polokwane, Rustenburg, Mbombela Waiting for guidance Implementation plans for infrastructure in place Resource problems
35
Security and Transport for SWC 2010 Frans Gibson, SAPS
Borders – passengers by air, through border posts (Latest estimates international , inter continental, from Africa) - Integration with Transport is an issue
37
Conclusions and Comments
38
Comment: Transport, Ports, Safety and security
Ports of entry Security versus transport capacity Airports – OK (?) Land transport around airports ? Will the airports handle the pass / day on peak days ? Expect large number of visitors from neighbouring states – Capacity of Border posts a problem Integrated planning between Safety & Security and Transport officials – nothing done to date ? Taxi industry – how are they integrated ?
39
Comments: Operational Plans
DOT has not made updated guidelines available Detailed plans have not yet been developed How we handle any incident will be the ultimate test of success (and what will be remembered) We need fall back plans for the fall back plans - Who, what, when, where and what thereafter Need to start testing ? (Do “dry” runs) Need continuity on development and implementation of operational plans (same service providers from 2007 to 2010 per city)
40
Comments: General The cities are well progressed with planning – ensuring timeous implementation of transport infrastructure will be the challenge Too much focus on “legacy” infrastructure ? What are the unknowns we need to resolve Cut off point for start of infrastructure implementation
41
SWC 2010 Scorecard A preliminary scorecard was developed and rated
Rating is based on perception of committee following the July Symposium Need to develop KPI’s to do a rigorous assessment of ongoing progress Need internal critical review of all transport plans
42
Scorecard – SA Transport – Ready to move for 2010
43
Recommendations Implement INTOP a.s.a.p.
Appoint National and local champions supported by strong teams – ENOUGH OF THE RIGHT PEOPLE DOING THE RIGHT THINGS Cities should develop operational plans a.s.a.p Provide resources to implement operational plans – National, Cities Critical review of infrastructure plans – timeous completion Integrate SWC 2010 operational plans and infrastructure plans
44
Recommendations (cont.)
Will need to accelerate the speed of implementation Small mistakes can have historical consequences We owe it to the country and the continent to make 2010 a success 2010 is an opportunity for nation building – we must use it