Download presentation
Presentation is loading. Please wait.
Published bySarah Wilkins Modified over 6 years ago
1
Usecase 4: Manual Data Import & Calculation of EnPI
Establishing a Joint Venture Energy Management System DIN EN / ISO 50001
2
Scenario Previous Exercises JEVis Live System basics Open an analysis
Create own analysis Task Import data manually and create a calculation Preconditions JEVis Monitoring System with data
3
Steps Log-in into JEVis System Create Energy Node
Manual Energy Data Import Create Mass Node Manual Mass Data Import Create EnPl Node Create Calculation Visualization of EnPl
4
1) Log-in to the JEVis System
Start JEConfig and log-in On JEVis Live System: Online via My-JEVis: user name: Admin your own log-in data password: jevislive
5
2) Create New Nodes Add nodes for 2 Input data rows:
Main Electricity Meter (energy) Production Output (mass) Add node for 1 Output data row: EnPI* (result of calculation) * Energy Performance Indicator
6
2) Create Energy Node Click New Property → Float → Physical → Energy
7
2) Create Energy Online Node
Click New → Datasource → Online
8
2) Create Energy Online Node
The data will be imported manually → almost no settings have to be made Important: “Differential” is set to “true” Uncheck “Create PrecalcCleaner DS”
9
3) Manual Energy Data Import
Time Zone ! Format: “dd-MM-yyyy HH:mm:ss”;”Value” → First day of the month at 00:00:00 → Value in W and as decimal
10
3) Manual Energy Data Import
The input form provides a simple way to enter data manually Example data " :00:00";" " " :00:00";" " " :00:00";" " " :00:00";" " " :00:00";" " " :00:00";" " " :00:00";" " " :00:00";" " " :00:00";" " " :00:00";" " " :00:00";" " " :00:00";" "
11
4) Create Mass Node Click New Property → Float → Physical → Quantity
12
4) Create Mass Online Node
Click New → Datasource → Online
13
5) Manual Mass Data Import
→ Value in t → pay attention to use identical time stamps
14
5) Manual Mass Data Import
The input form provides a simple way to enter data manually Example data " :00:00";"262.00" " :00:00";"298.00" " :00:00";"292.00" " :00:00";"385.00" " :00:00";"388.00" " :00:00";"370.00" " :00:00";"405.00" " :00:00";"298.00" " :00:00";"262.00" " :00:00";"298.00" " :00:00";"300.00" " :00:00";"400.00"
15
6) Create EnPI Node Click New Property → Float → Physical → Energy per ton
16
6) Create EnPI Online Node
Click New → Datasource → Online
17
7) Create Calculation Calculation is child node of “My Company”
Click New → Object → Data Gateway → GenericCalc Set JobStatus to “CALCULATE” Uncheck “Create PrecalcCleaner DS”
18
7) Create Calculation Your Registry should look like this:
19
7) Create Calculation In the following steps you need
The Online Node ID of Main Electricity Meter for Energy Data The Online Node ID of Production Output for Mass Data The Online Node ID of EnPI for EnPI Data Note the IDs from the Registry
20
7) Create Calculation Define Inputs INPUT var=ID; Define Output OUTPUT ID=var; Divisions in Octave Take care of using the ./ operation for matrices
21
7) Create Calculation Use the IDs of your data structure!
Save everything with the blue disc button Set JobStatus to “FETCH”
22
Force Recalculation Onto the JEVis Live System you have to start the calculation of data by click on the icons shown below: Run JEJobMaster for fetching data and calculation of Octave code Run JECalc for calculation of clean data
23
JEVis Live System Start JEGraph
24
JEGraph Login Type your User in the Username field
Type your Password in the Password field Additional Features The log-in dialogue entering of the server address. JEVis is multilingual. Select your language from the drop down box
25
8) Visualization of EnPI
Close the “load analysis” dialogue Choose Analysis → new → JEChart
26
8) Visualization of EnPI
Select “EnPI” data row from the Registry where you saved it Always select the last year as time period
27
8) Visualization of EnPI
28
Conclusion JEVis supports calculations in MatLAB / Octave syntax
JEConfig provides csv and manual data import Calculations start automatically on server based JEVis Systems
29
Energy Efficient Into the Future
Contact: Envidatec GmbH Veritaskai 2 D Hamburg Phone.: +49 (0) 40 / – 0 Fax: +49 (0) 40 / – 70 Internet: Internet: Internet: Establishing a Joint Venture Energy Management System DIN EN / ISO 50001
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.