Controls & software Andy Butterworth
2
RF-CS responsibilities
Controls HW and automation PLC controls for RF power systems Digital hardware/firmware development for LLRF systems Software PLC supervision/interface to control system: FESA/SILECS Front-end FESA SW for LLRF equipment User interfaces (Inspector etc.)
3
Manpower RF-CS Controls HW & Automation Controls software 2 engineers
2 technicians Controls software 4 engineers (staff) 1 fellow (2017->)? 1 PJAS (->2017) 1 OP second job 1 future post LIU-ions
4
PSB Finemet Test stand for 180 power supplies and 150 amplifiers ready start 2017 Production of PLC systems Software Some software work left to do for LLRF (FESA3 back-port from LEIR) C16 cavity blowup White Rabbit B-train
5
LEIR Software synergy with PSB and ELENA
Phase 1: replace existing system functionality Phase 2: 2 cavity control Manpower issue: same SW developer for LEIR, PSB & ELENA Committed to 1 July deadline
6
PS Software development for LLRF
PS controls consolidation competes for manpower with other controls/automation projects
7
SPS New amplifier controls not yet defined
Clear missing manpower (at least 1 FTE) for Siemens/Philips controls renovation
8
LINAC4 Controls installation complete
Software for LLRF still to finish Currently SW developer on medium-term sick leave (temporarily replaced by manpower from LHC FESA migration)
9
Conclusions Software team can manage to follow LLRF developments if we obtain all promised manpower (post, fellow, replacement PJAS) LEIR software on track but tight for 1 July Must manage potential conflict with ELENA HW and automation team stretched due to many projects (Crabs, medical RFQ, multi-beam IOT…) Clear manpower hole for SPS 200 MHz upgrade if renovation of existing amplifier controls (at least 1 FTE) LINAC4 on track but short-term SW manpower issue