Presentation is loading. Please wait.

Presentation is loading. Please wait.

THEMIS THEMIS MCDR June 14-18, 2004 University of California, Berkeley

Similar presentations


Presentation on theme: "THEMIS THEMIS MCDR June 14-18, 2004 University of California, Berkeley"— Presentation transcript:

1 THEMIS THEMIS MCDR June 14-18, 2004 University of California, Berkeley
TIME HISTORY OF EVENTS AND MACROSCALE INTERACTIONS DURING SUBSTORMS RESOLVING THE MYSTERY OF WHERE, WHEN AND HOW AURORAL ERUPTIONS START THEMIS MCDR June 14-18, 2004 University of California, Berkeley

2 SPACE SCIENCES LABORATORY
Background Initiated in 1958 by Drs. Teller and Seaborg Multidisciplinary organization Connecting campus research to space efforts Facility opened in 1966 New facilities added in 1998 Research Efforts Involving Balloons Sounding rockets Satellite instruments & science complements Complete satellites Mission & Science Operations Ground Station Operations Agencies Involved NASA, NSF, NSBF, USAF, DOE ESA, ISAS, IKI, PSI, etc. $35M/yr (85% NASA, 15% NSF, 5% misc.)

3 Operations Components
Mission Operations Center Science Operations Center 11-meter S-Band Antenna with X-band upgrade capability High Speed Communications to NASA Ground Network Network Security Autonomous Operations Pass Supports Tracking and Data Acquisition Spacecraft Command and Control Emergency Response System Self Checking Network Security Presently tracking: IMAGE, RHESSI, FAST, CHIPSat

4 EXTREME ULTRAVIOLET EXPLORER
Project Management Science Package Telescopes Electronics Mission Operations Science Operations  Launched on 7 June 1992 Mission Successfully Concluded 1Q2001

5 Facilities 55000 sq. ft. Office and Laboratory Space
Employing 420 Scientists, Engineers, Staff On-Site Machine Shop Clean Room Facilities to Class 100 Thermal Vacuum Facilities up to 3m diameter Spacecraft Integration Facility 4-story High Bay Radiation Sources Laboratory Mission Operations Centers Science Operations Centers 11 Meter S-Band Satellite Antenna Secure High Speed Communications to NASA

6 FAST AURORAL SNAPSHOT Science Package Electric Field Instruments
Particle Instruments Electronics Mission Operations Science Operations Launched on 21 Aug 1996 Mission Continuing through 2003

7 RAMATY HIGH ENERGY SOLAR SPECTROSCOPIC IMAGER
Project Management Spacecraft Bus Science Package Imager Spectrometer Electronics Mission Operations Science Operations Ground Data Systems Launched February 5, 2002 Mission Operations Planned for 2 years

8 THEMIS is an Essential Component to Swales Corporate Growth
THEMIS is Central to Swales Strategic Plan Swales has committed significant internal resources over the last 4 years to mature the THEMIS Mission design thereby enhancing the science return Swales has the Human & Financial strength to drive THEMIS to a success THEMIS Management has high visibility with weekly direct- reporting to CEO/COO We love doing this type of work! 1978 1980 1985 1990 1995 2000 2001 First direct contract with JPL First direct contracts with GSFC & NRL SAI Founded Delivered first Flight HW Delivered ISS Radiator First major contracts with LaRC Delivered FUSE OTA Successful Launch of EO-1 Acquired Thermal and Structural Products Divisions Doing Business As Awarded SMEX-Lite Commercialization First major STS Payload Contract NRL Instrument Development (LASCO / SSULI) 61% 21% 14% 4% Engineer Designer / Other Professionals Technician Support / Clerical Labor Mix

9 Venue Description LAWRENCE HALL OF SCIENCE Lawrence Hall of Science is on Centennial Drive in the Berkeley hills east of the main UC Berkeley campus. It is just above the UC Botanical Gardens; and just below the Space Sciences Lab. Phone: LHS Parking Visitor parking rates are: 50¢ for 1/2 hour $2 for 2 hours $3 for 4 hours $5 for all day. The machines accept $1and $5 bills, and change. SSL (splinters & after 5:30pm) LHS (Main venue 8:00am-5:30pm)

10 3 Splinter rooms at Space Sciences Lab
SSL Splinter Rooms Splinter 1 Room 3 Splinter rooms at Space Sciences Lab Room selection based upon size of group Other issues, see: Vassilis Angelopoulos or Peter Harvey Silver Addition Splinter 2 room Samuel Silver Space Sciences Laboratory Splinter 3 room

11 THEMIS Status Selected for Phase A: April 17, 2002
Selected for Phase B: March 20, 2003 PDR – peer: Oct 8/9/15/16, 2003, Mission PDR: Nov 13-14, 2003 Confirmation Readiness Review – [Original: Dec’03] GSFC, Feb 4, 2004 Confirmation Review – [Orig. Dec’03] Attempt: HQ, Mar 4, 2004 (Aborted) Confirmation: April 22, 2004 GSFC direction to further reduce I&T schedule risk Developed better I&T flow, validated by GSFC Engineering Developed 2 month slack in I&T flow, pushing launch to 10/2006 (slot=10/19/2006) Added P1 end magnetics EMC/EMI verification and calibration test Added pressurant tank: increased mission deltaV to help: mass posture (refocus bus on instrument hosting); bus development schedule; a compressed ascend and commissioning scenario Lost dawn sector conjunctions; but kept ascend schedule contingency Design work kept-on (Instr. and BAU ETU production & testing) Test plans being detailed; test GSE/software/adl.TV tanks being built Instrument ETU vibration and electrical tests have mostly occurred T/V tests ongoing; ETU I&T= July 2004.

12 THEMIS CDR peer reviews
FGM/SCM (Berlin/Paris): Apr 6/8, 2004 ESA/SST/EFI/IDPU (UCB): Apr 19/20, 2004 GBO (U of Calgary): Apr 26/27, 2004 Bus Systems (SAI): Apr 28am, 2004 Bus Thermal (SAI): Apr 28pm, 2004 Bus Electrical & C&DH (SAI): Apr 29am, 2004 FSW (SAI): Apr 29pm, 2004 Bus Mechanical (SAI): May 3, 2004 Separation System (SAI): May 4, 2004 Probe power (SAI): May 5, 2004 Probe communications (SAI): May 6, 2004 I&T Plan and EGSE (SAI): May 7, 2004 RCS (Aerojet, Redmond, WA): May 10, 2004 Probe GN&C and ACS (SAI): May 12, 2004 Flight Dynamics and Mission Operations (SAI): Jun 1/ 2, 2004 Program schedule (GSFC): Jun 10, 2004 Consolidated Bus and Mission CDR (Efficiency, Reduces Overlap and Travel)

13 THEMIS MCDR main goals Ensure design (still) meets mission requirements including changes since PDR Ensure design meets safety requirements Ensure main PDR issues have been addressed satisfactorily Demonstrate design is ready for production Process to be an asset to the UCB Program Manager (a fresh technical look) and to GSFC Mission Manager (compliance to processes and requirements) Request to review board: Be sparing in your RFAs Identify criticality and distinguish from recommendations Identify need dates and work them with PM to ensure workable schedule Resolve issues to your satisfaction if possible rather than writing it up: Discussion (here and now) and/or Arranging splinters (breaks or SSL rooms)

14 Opening Remarks Review Board
Mark Goans GSFC/Systems Review Office/Co-chair Brian Keegan Honeywell/Co-chair Joe Bolek GSFC/Systems Engineering Lou Fantano GSFC/Thermal Systems Scott Glubke GSFC/Propulsion Systems Rick Schnurr GSFC/Electrical Systems Jason Hair GSFC/Mechanical systems Terry Ford Independent/Guidance, Navigation and Control J. B. Joyce Independent/Mission Operations Ronnie Killough Southwest Research Institute/Software Frank Martin Martin Consulting, Inc./Science William Taylor Independent/Project Management Kevin Morgan IV&V Dr. Larry Cooper NASA HQ EPO Ben Burress Solar B E/PO Lead

15 Agenda June 14, 2004 Main Conference Room

16 Agenda June 15, 2004 Main Conference Room

17 Agenda June 16, 2004 Main Conference Room

18 Agenda June 17, 2004 Main Conference Room

19 Agenda June 18, 2004 Main Conference Room


Download ppt "THEMIS THEMIS MCDR June 14-18, 2004 University of California, Berkeley"

Similar presentations


Ads by Google