Presentation is loading. Please wait.

Presentation is loading. Please wait.

WT CALL – 04/10/2017 2017-10-04.

Similar presentations


Presentation on theme: "WT CALL – 04/10/2017 2017-10-04."— Presentation transcript:

1 WT CALL – 04/10/2017

2 AGENDA Administrative and organizational Model PoC 4.1

3 ADMINISTRATIVE AND ORGANIZATIONAL
Some feedbacks from Timon on collaborator status “Collaborator status is tied to companies making demonstrable contributions to a particular project. Collaborators need to submit an application for recognition (and to propose future work items to the TST). These applications go to the project TST, and also require ONF approval” Proposal to discuss model aspects in alternate weeks: Ethernet & MW model in WT call Calendar: Week 40 (Wednesday 4/10): MW model in WT call Week 41 (Wednesday 11/10): Ethernet model (detailed parameter) in WT call Week 42 (Wednesday 18/10): MW model in WT call

4 ADMINISTRATIVE AND ORGANIZATIONAL (2)
FACE TO FACE MEETING FOR TAPI AND OTIM during CORD build event: Nov 6-10, 2017, Google Facility: Quanta Cloud Technology (QCT), 1010 Rincon Circle, San Jose, CA 95131 OTCC & OIMT meets at event venue on Tue-Thu and at ONF office on Mon/Fri Co-located with CORD Build Summit Registration: (Free for ONF members) Agenda Wednesday morning: TAPI presentation; this will be on the CORD Build agenda Wednesday afternoon: track for TAPI and Core IM; this will be on the CORD Build agenda Tuesday and Thursday we have a large room for us to work; this will NOT be on the CORD Build agenda Science fair stand for demo, 2 hours per day at lunch time on Tuesday, Wednesday, & Thursday

5 MODEL --> Reference LINK to Mantis tool:   NEW: (25/9): ODU HW and FW versions: Versions of the ODU Hardware and Firmware shall be available for reading. Other topics for model extension (proposed last week): Point to multipoint (already tracked as ) Distributed antenna System (DAS)  currently used in RAN access. Needed to extend the model to cover radio access. This could be applicable to transport once self-backhauling will be applied (5G meshed network architecture).

6 PoC 4.1 Scope of the PoC: retrieve of the inventory through AAI interface (ONAP architecture) from ODL SDN Controller. On southband the Equipment model and inventory model is requested from equipment vendors. Round-table about possible participation of the vendors attending the call: Ceragon: no official position yet (11/10 to be checked) NEC: under evaluation remote connection participation. Nokia: need to check Ericsson: We would prefer to concentrate on further enhancements in definitions and implementations and propose to show the planned content of PoC 4.1 within PoC 5. ZTE: possibility to participate from remote labs SIAE: no official position yet (11/10 to be checked) Note that the participation can be also remote, connecting equipment to the SDN CTRL located in DTAG (used for the 4th PoC). IP tunnel will be needed to connect. ONAP: ongoing the ONAP meeting in Paris: see the following slides:

7 PoC 4.1

8 PoC 4.1

9 SUM-UP Reference interface Interface extensions requested
Extensions in other components Extensions in SDN WT controller equipment and inventory AAI Not on southbound (equipment model to be implemented) no Adapter between ONF equipment model and AAI alarms DCAE Adapter between ONF model and DCAE upload of configuration ?? configuration statistics

10 THANK YOU


Download ppt "WT CALL – 04/10/2017 2017-10-04."

Similar presentations


Ads by Google