Download presentation
Presentation is loading. Please wait.
1
Flood Risk and Recovery in Ventura, CA
Ryan Graham Susannah Pitman Chris Castillo Billy Dole Dani Luna Diego Pedreros
2
Background Cities along Ventura River - Oak View - Ventura
In February, 1992, Ventura Beach RV Park Resort flooded by Ventura River
3
Ventura Beach RV Resort
5
Background USGS Highest Flows Since 1933:
Jan. 5, 1969 reached 58,000 CFS - gauge ht 24.3 ft Feb. 10, 1978 reached 63,600 CFS - gauge ht 19 ft Feb. 12, 1992 reached 45,800 CFS - gauge ft Jan. 10, 1995 reached 43,700 CFS - gauge 21.16ft
6
Background http://ahps2. wrh. noaa. gov/ahps2/hydrograph. php
Background Advanced Hydrologic Prediction service
8
Objectives Provide a service GIS model for future flood studies
Protect the economic investments and interests of community Facilitate Rescue, Recovery, Prevention Aid in land use policy and recreation
9
Map of the Ventura River
Three Parts
11
Methods and Procedure Three Parts to the Procedure: The Event
The Physical and Social Impact Rescue and Recovery
12
1. The Event Identify the site (the creek a.k.a the event)
Need to find data: - rain gauges - hydrographs 3 highest peaks - Imagery air photos Landsat data
13
Hydrograph http://nwis. waterdata. usgs. gov/ca/nwis/peak/
14
Hydrograph http://nwis. waterdata. usgs. gov/ca/nwis/peak/
15
2. Physical and Social Impact
Transportation – roads, railroad, airports Livelines – gas, water, sewage, electricity Buildings – schools, residential, business Land use – agriculture Communication systems – cell towers, radio stations
16
2. Phys. And Soc. Continued Economic – jobs, income
Population breakdowns – families, age Property value Displaced population
17
3. Rescue and Recovery Depends heavily upon physical and social Impacts: Roads blocked and closed Flooding of emergency areas Economic losses and damages Funds for repair
18
Data sources USGS - rain gauges - DEM MIL - Aerial photos Census Data
Ventura Community On site Inspection
20
Anticipated Problems Locating affected areas
Finding associated ancillary related to past events Predicting future floods Finding accurate census data for the social impacts Difficulty communicating and distributing information to residents
21
Likely Results Providing service to search & rescue and the fire department Restricting land use to low intensity recreation and economic activity Produce three thematic flood prediction maps Ultimately… Saving Ventura
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.