Presentation is loading. Please wait.

Presentation is loading. Please wait.

Auto Assignment Setup and Maintenance - Revised Jonathan King

Similar presentations


Presentation on theme: "Auto Assignment Setup and Maintenance - Revised Jonathan King"— Presentation transcript:

1 Auto Assignment Setup and Maintenance - Revised 102140 Jonathan King
Senior Process Manager Adventist Health System

2 Agenda Adventist Health System Auto Assignment Need
Peoplesoft Auto Assignment Auto Assignment Testing Auto Assignment Challenges PUM Patches Implementation and Future Plans Open Discussion

3 Adventist Health System

4 1973 Adventist Health System was established 80,000 Employees and physicians 5 million+ Patients served annually 22 Home health and hospice agencies 15 Skilled nursing facilities 45 Hospital campuses operated in 9 states Adventist Health System is a faith-based health care organization headquartered in Altamonte Springs, Florida. A national leader in quality, safety and patient satisfaction, Adventist Health System’s more than 78,000 employees maintain a tradition of whole-person health by caring for the physical, emotional and spiritual needs of every patient. With 46 hospital campuses and more than 8,300 licensed beds in ten states, Adventist Health System facilities incorporate the latest technological advancements and clinical research to serve more than 4.7 million patients annually. The full continuum of integrated care also includes urgent care centers, home health and hospice agencies, and skilled nursing facilities. Each Adventist Health System facility operates independently in delivering care and services to best meet the needs of the local communities they serve. While each entity is unique, all remain united in one mission: to extend the healing ministry of Christ. These numbers provide just a glimpse of the far-reaching impact we are able to achieve by combining state-of-the-art technology with compassionate, Christ-centered care.

5 500+ 8,300+ 9 billion+ 1.2 billion+ 385,600+ 817,000+
Physician Offices 9 billion+ Total Operating Revenue 1.2 billion+ Expenses 8,300+ Licensed Beds 817,000+ Invoices 385,600+ Purchase Orders (1.6 Million Lines) We average close to 1.2 billion in expense 385,000 Purchase orders Which make up approximately 1.6 million PO lines 817,000 Invoices per year

6 Guiding Principles Enterprise-Wide Integration (Hospitals, HomeHealth, LTAC, Physicians, etc.): Finance Supply Chain Human Resources - We use these guiding principles in our Project Decision Documents, Enhancements Requests, etc.

7 ORGANIZATION & ORACLE

8 iSynergy Project Adventist Health System is currently installing PeopleSoft FSCM 9.2 and HCM Currently on PeopleTools PeopleSoft 9.2 PUM 13 Selective adoption through PUM 18 Taking all PUMs up to 22 in August 2017 Selective adoption through PUM 23

9 FSCM Implementation ePro Payables General Ledger Purchasing Assets
Supply Chain Finance ePro Purchasing Inventory Mobile Inventory Maintenance eSettlements/eSupplier* Payables General Ledger Assets Projects Budgets Hyperion Treasury/Cash

10 Additional Modules/Features/Interfaces
UPK – User Productivity Kit Forms Builder OBIEE/OBIA WorkCenters Punchouts CDW, Grainger, Office Depot, McKesson ImageNow, Cypress, QSight, GHX, Pyxis Supply OATS (Oracle Application Testing Suite)

11 AHS Auto Assignment Need
Feature is available in many legacy systems currently in use at Adventist Health System Most legacy systems allow for Auto Assignment Configuration by: Asset or PM Schedule Specific Shop or Technician Current Legacy Systems TMS Harvest SiteFM GrandPM Facility Dude Archibus

12 PeopleSoft Auto Assignment

13 PeopleSoft Auto assignment
Configurable option which can be turned on and off at the BU level Set-up Financials and Supply Chain > Business Unit Related > Maintenance Management > Work Order Definition

14 PeopleSoft Auto Assignment
Configurable feature that dispatches Work Order to specified resource Primary – Secondary – Tertiary Labor Resources Supplier Navigation: Set Up Financials/Supply Chain > Product Related > Maintenance Management > Set Up > Auto Assignment 14 fields available to configure prior to PUM 23 Can use any field or combination of fields and wildcards (%) Work Order Task line required for each configuration Criteria Tab AMBU Asset Type Asset Subtype Asset ID Asset Location Area ID Problem Group Problem Code Priority Shop General Tab Work Type Service Group Maintenance Type *Additional fields added to Criteria Tab with PUM 23

15 Auto Assignment Testing

16 Auto Assignment Testing
Jan 2016 Stage 1 testing: prior to run time PUM patch SR submitted to Oracle Dec 2016 PUM patch implemented Issue with run times resolved Jan 2017 – Mar 2017 Stage 2 testing: Post PUM patch (Successful) July 2017 Stage 3 testing: PUM 23 New fields added

17 Auto Assignment Testing
Limited the testing to Preventive Maintenance WO only A wildcard (%) was entered in all non-used variables Each test run used a different combination of variables* Each combination was tested with 1 schedule and 1 line of configuration to ensure the combination worked Passing combinations were moved to a second round of testing with incremental schedules configured

18 Auto Assignment Testing
Created a test matrix of the 14 Configurable variables

19 Initial Auto Assignment Challenges
**Presented RECONNECT 2016

20 Initial Auto Assignment Challenges
Extended Run Times Configuration Lines Configuration Performance

21 Initial Auto Assignment Challenges
Extended Run Times Regardless of variable configurations, runtimes were too long to efficiently continue testing. SR Submitted to Oracle on 01/22/2016 – SR SAMPLE Specify AMBU, Problem Group, Shop, Task Template, and Labor 12 Schedules Selected – 1 Occurrence Initial Run Time: 2:55 hours

22 Initial Auto Assignment Challenges
Florida Hospital Orlando has 75,000 unique PM schedules in their legacy system Run projection job each night that creates a 2 year running projection Using best fit for projections, run would take 14,000 hours

23 Initial Auto Assignment Challenges
Online WO Task Template required per configured line Currently have 40% of the system online 1500+ unique Task Templates Template build and Auto Assignment configuration will reside with Shared Services

24 PUM Patches

25 PUM 19 – Run Time Patch Jan 2016 Stage 1 testing: prior PUM 19 patch Jan 2017 Stage 2 testing: Post PUM 19/21 patch (Successful) July 2017 Stage 3 testing: PUM 23 New fields added December 2016 – Tested and migrated to Production Testing improved, run time reduced drastically 600 Schedules completed in <1 minute

26 PUM 21 – Field Requirements
Jan 2016 Stage 1 testing: prior PUM 19 patch Jan 2017 Stage 2 testing: Post PUM 19/21 patch (Successful) July 2017 Stage 3 testing: PUM 23 New fields added December 2016 – Tested and migrated to Production Requirement of WO Task Template was removed Allows for significant flexibility with regards to configuration

27 PUM 23 – Field Additions Jan 2016 Stage 1 testing: prior PUM 19 patch
Post PUM 19/21 patch (Successful) July 2017 Stage 3 testing: PUM 23 New fields added

28 Implementation and Future Plans

29 Configuration Options
AM Unit & Asset ID Asset Type & Sub-Type Excel to CI Developed to assist with configuration line load Option 1 Option 2

30 Implementation Schedule
April 2017 Pilot site went live June 2017 3 Sites went live July 2017 As many as 3 sites will continue to go live each month *All future implementations will have Auto Assignment

31 Future Testing and plans
PUM Patches Functional team will began testing in July 2017 Migration to Production scheduled for August 2017 Modify Excel to CI to add Work Location and Department Sites have requested Department as an option to configure Auto Assignment Plan to add this configuration as a 3rd option after PUM 23 Evaluate Fit Gap for Florida Hospital – Orlando and determine if additional fields are required

32 Open Discussion

33 Open Discussion Who is using the delivered Auto Assignment feature? How is it configured? Who is in process with testing? Have you tested the newest patches? Who is running Auto Assignment through another method other than the delivered feature? What are your future plans?

34 102140

35


Download ppt "Auto Assignment Setup and Maintenance - Revised Jonathan King"

Similar presentations


Ads by Google