Work programme topics addressed:
Braking Assistant Type of funding scheme: STREP Work programme topics addressed: H2020-EU.3.4-SOCIETAL CHALENGES – Smart, Green and Integrated Transport Name of coordinating person : Dragutin Ilić Faculty of Mathematics, University of Belgrade
2
Table of contents Project partners Proposal abstract
Concept and objectives Work packages – Gantt chart Work package list Milestones Summary of effort Ethical Issues
3
Participant organization name
Project partners Participant no. Participant organization name Part. short name Country 1.(Coordinator) Faculty of Mathematics, University of Belgrade MATF Serbia 2. Faculty of Electrical Engineering, University of Belgrade, ETF 3. Nissan Motor Corporation, NMC Japan 4. Massachusetts Institute of Technology, web.mit.edu MIT United States 5. Alphabet, Inc., abc.xyz ABC.XYZ
4
Project partners
5
Proposal abstract Number of vehicle increases over the years
Increased number of traffic accidents Usually human factor is the cause Braking assistant – great impact on safety
6
Concept and objectives
Designing an algorithm Developing a practical input/output system adjusted to standards of every vehicle Testing software on different kind of vehicles and in different conditions Product marketing
7
The overall strategy of the work plan
The project is organized in 7 work packages as follows: WP0 Project management WP1 Development of system architecture WP2 Definition of the input / output WP3 Testing and tuning WP4 Releasing the product WP5 Informing the scientific and technical environment WP6 Impact on the environment
8
Gantt Chart
9
Work package list WP0 MGT 1 30 M1 M12 WP1 RTD 3 WP2 WP3 2 WP4 DEM WP5
Package No Work Package Title Type of activity Lead partic. No Lead partic. short name Person - months Start month End month WP0 Project management MGT 1 Matf 30 M1 M12 WP1 Development of system architecture RTD 3 Matf, Mit, Etf 50 M7 WP2 Definition of the input / output 25 M6 M8 WP3 Testing and tuning 2 Abc.xyz 80 WP4 Releasing the product DEM 5 M11 WP5 Informing the scientific and technical environment 20 WP6 Impact on the environment Nmc TOTAL 230
10
Work package(s) involved
Milestones 1/2 Milestone number Milestone name Work package(s) involved Expected date Means of verification M0.1 Checking on optimization of the reporting processes involved in the project (deadlines) WP0 M6 M0.2 Checking on optimization of the control processes involved in the project M12 M0.3 Checking on optimizing finances of the project M1.1 System architecture defined WP1 M3 Architecture specification. M1.2 Checking implementation without bugs M7 M2.1 Checking on specification of hardware and software throughout the target market WP2
11
Milestones 2/2 M2.2 WP2 M8 M2.3 M3.1 WP3 M11 M4.1 WP4 M12 M5.1 WP5
Checking implementation on of algorithm for all possible platforms WP2 M8 M2.3 Checking whether the maintenance plan covers all possible troubleshooting regarding the possible hardware and software problems M3.1 Testing and tuning SW and SW compatibility with HD WP3 M11 Testing of whole system M4.1 Project marketing WP4 M12 M5.1 Checking on number of papers, number of participants at workshops (min 20 per workshop) and at scientific symposia (min 40), number of public presentations in media WP5 M6.1 Checking the techno economic impact of the final product in the market environment WP6
12
Summary Effort Table Partic. no. Partic. short name WP0 WP1 WP2 WP3
Total person months 1 MATF 30 25 10 50 5 20 140 2 ETF 3 NMC 4 MIT 15 ABC.XYZ Total 80 230
13
Summary effort pie
14
Ethical Issues No direct ethical, legal, social and safety issues
“Accidents Bring Tears, Safety Bring Cheers”
15
You can find me at mailto:dragutin_ilic@yahoo.com
Any questions? You can find me at Thanks!