Download presentation
Presentation is loading. Please wait.
2
SVQ Management and Team Leading Network Event
Elaine Snell Qualifications Manager
3
SQA Update Revised SVQs New flexible PDAs in Leadership and Management
Graduate Apprenticeship Promotional campaign New EVs
4
New Flexible PDAs More flexible PDAs in Leadership and Management
One mandatory unit Wide range of optional units to choose from Available at four levels: SCQF levels 6,7,8 and 9
5
SQA’s Leadership and Management Promotional Campaign
Social media campaign - Twitter - Facebook - Linkedin Updated leaflets Updating webpages
6
Leadership and Management Webpage Links
Interactive Activities: HN Open Page: PDA Open Page: SVQ Open Site: HN Secure Site: SVQ Secure Site:
8
Bill Breckenridge SEV Report : An Overview
9
Overall Centres enjoyed a high degree of success with qualification verification
10
Qualification Quality Assurance Criteria
11
2. Resources: The Centre procedures for managing resources must be documented, implemented and monitored to meet SQA requirements 2.1. Assessors and internal verifiers must be competent to assess and internally verify the qualification where this is stipulated by SQA. Assessment Strategy CPD at least 3 management examples. impact/benefits of CPD 2.2. There must be evidence of initial and on-going reviews of assessment environment(s); assessment procedures; equipment and reference; learning and assessment materials Reviewed documents Minutes Site selection
12
3. Candidate Support: Candidates are supported and guided through the qualification for which they are entered 3.1. Candidates development needs and prior achievements (where appropriate) must be matched against the requirements of the award. Interview Diagnostic induction 3.2. Candidates must have scheduled contact with their assessor to review their progress and to revise their assessment plans accordingly Induction Unit choice Assessment plans Learning logs Contact Diaries
13
4. Internal Assessment and Verification: The Centre’s internal assessment and verification procedures must be documented, implemented and monitored to meet SQA requirements 4.2. Internal assessment and verification procedures must be implemented to ensure standardisation of assessment. Pre, mid and post Minutes/agendas Decision/action logs
14
4.3. The selection and use of assessment instruments and methods must be valid, reliable, practicable, equitable and fair Methods of generating evidence Product Observation Witness testimony Professional Discussion etc Generated in workplace by candidate Traditional or eportfolio ‘line of sight’ Tracking Recordings/videos
15
4.4. Assessment evidence must be the candidate’s own work generated under SQA’s required conditions
Plagiarism/malpractice procedures policies Candidate sign off Induction procedures Witness statement Product evidence
16
4.6. Evidence of candidate’s work must be accurately and consistently judged by assessors against SQA’s requirements. Sufficiency Consistency Links between evidence and standards Level/depth SCQF 7, 8 and 9 Assessor and IV feedback
17
4.7. Candidate evidence must be retained in line with SQA requirements
4.9. Feedback from qualification verifiers must be disseminated to staff and used to inform assessment practice Previous reports Minutes/action logs Training records
18
THANK YOU and Questions
19
SVQ Management and Team Leading Network Event
Ushare Lynne Malcolm Stuart McLaren
20
SVQ Management and Team Leading Network Event
Discussion Groups Group A: Remain in Plenary Room – Roberta Brown Group B: Remain in Plenary Room – David Dow Group C: Break Out Room – David Dickie Group D: Break Out Room – Peter Fitzpatrick
21
SVQ Management and Team Leading Network Event
Discussion Group Feedback Plenary Session Lunch
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.