SPF MAG Quarterly Report – Feb 2015

Similar presentations


Presentation on theme: "SPF MAG Quarterly Report – Feb 2015"— Presentation transcript:

1 SPF MAG Quarterly Report – Feb 2015
MAG FM1 fabrication is well underway – boards have been received, coupons accepted or in testing (with up to a 1 week schedule delay), parts have been kitted and delivered to the assembly group. The flight sensor electronics frames and several flight sensor components are in fabrication. EM2 MAG sensor thermal cycling has completed 200 cycles. A post-cycling thin shell orthogonality check is planned. Assembly of the second MAG Data Simulator continues and is on schedule for delivery to Minnesota the first week in March. MAG responses to FIELDS CDR RFAs # 17, 19, and 23 are ready to upload to PIMS. A response to Advisory #20 is complete and will be distributed. MAG provided MAG status inputs to FIELDS in support of Mission CDR. MAG EM-2 Qualification Sensor

2 SPF MAG Quarterly Report – Feb 2015
Meanwhile, in Minnesota, they laugh at DC’s reaction to snow….

3 Magnetometer Schedule
SPP Magnetometer Summary 2015 January February March April May 5 12 19 26 2 9 16 23 30 6 13 20 27 4 11 18 25 FIELDS CDR X FM Parts Mag FM Updates Mag FM-1 PCB Build Mag FM-1 Sensor Build Mag FM-1 Integrate & Test Mag EM Sensor Thermal Cycles Mag EM Sensor Qualification Vibe Mag Simulator #2 Mag FM Frames Mag FM Adapter Plates Mag Sensor Covers Mag FM-2 PCB Build Mag FM-2 Sensor Build 1 week delay due to scheduling issues for coupon testing Impact on schedule - minimal

4 Magnetometer Workforce
Month# 54 55 56 57 58 59 60 Date 2015 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 GSFC 4.9 Plan does not include labor in GSFC pools which are considered a procurement 61 62 63 64 65 66 67 68 69 70 71 72 2015 2016 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 4.5 73 74 75 76 77 78 79 80 81 82 83 84 2016 2017 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 3.6 85 86 87 88 89 90 91 92 93 94 95 96 2017 2018 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 2.1

5 Magnetometer Budget - 1 Budget Summary (1/31/2015)
FY15: Cost to date: $454,860 Plan: $536,556 Accumulative: Cost to date: $3,385,496 Plan: $3,323,338 Reserves thru FY 15: $475,073 Reserves request submitted: $124,750 Reserve Phase C request to cover Carbon Composite Base build, test & qualify (save mass, improve thermal isolation) Mag data simulator (2x) for FIELDS 2 (UM) (increase FIELDS reliability) W/ mass model suitable for vibration (UM → UCB) Lab version (UM) Future Phase C/D Liens GSE multi-mag variometer/gradiometer (science performance verification to assess local magnetic field environment up to 144 Hz) Mu-metal shield cans with 3-axis field generator (science performance verification during S/C I&T)

6 Magnetometer Budget - 2 Future Phase C/D Liens
A+B Contract Value ($) Phase C/D ($) CTD Actual Jan CTD Plan Jan Plan Balance EAC Contract Value 2,133,931 GSFC MAG 3,385,496 3,323,338 2,534,591 6,189,503 6,127,345 22,069 Reserves 820,752 2,156,000 Total 6,948,097 Phase A-B Reserves FY14 FY15 FY16 FY17 FY18 Total C/D 22,069 129,705 323,299 209,558 72,431 63,689 798,683 Future Phase C/D Liens GSE multi-mag variometer/gradiometer Mu-metal shield cans with 3-axis field generator Schedule slips beyond Mag’s control