Download presentation
Presentation is loading. Please wait.
Published byAmberly Skinner Modified over 6 years ago
1
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Board Meeting October 24, 2016
2
Building Area A – South Classroom wing closest to Doe Run Road Area B – Administration Suite, Main vestibule Area C - Gymnasium, Cafeteria, Kitchen Area D – North Classroom Wing
3
Area A - South Classroom wing closest to Doe Run Road
South-East elevation South entrance Classroom near South stair tower Large Group Instruction area looking towards corridor. Main corridor, classroom on left with framing for lockers. Typical classroom
4
Area B – Administration Suite, Main vestibule
Future music classrooms to the left Admin offices first floor, Media Center on 2nd floor. Main entrance structural steel
5
AREA C GYM CAFETERIA KITCHEN Looking through gymnasium.
Gym looking at stage. Cafe in background. Main common area Cafeteria seating area
6
Area D – North Classroom Wing
7
Basement mechanical room and storage area
8
Site work – Bulk of curbing installed, preparing for rough coat of paving
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.