1 The Republic of the Union of Myanmar Ministry of Electric Power
Electricity Supply Enterprise Northern Shan State Office Priorities and Detailed Description of Electrification Plan For Northern Shan State Dated -21.Oct.2015

2 Priority Electrification Project List for Northern Shan State
The following facts are agreement after discussion with Chief Minister (Shan State) To be performed priority the villages still without Electricity, which have along the main road. To meet the electrical safety and voltage to establish priorities. To Build quality products with proper power distribution Line. The villages within 2 miles from National Grid Line.(11 kV Line) To be performed priority villages having households more than 100 and above. To be explain the public of villages to construct the low voltage line by local fund. In areas with difficult transportation to go to all the relevant authorities spicy leaves. And then, the remain villages will be implemented continuously by National Electrification Plan. ESE (Northern Shan State) will implement the work done under management MOEP coordination especially with local Government.

3 Priority Electrification Plan for Northern Shan State (Within 2 miles from Existing 11 kV Distribution Line) No Distric No; of Village To be Electrif- ied No of House House hold Popu lation To be constructed Estimate cost (Mil Kyats) Task regional Cost for 11 kV Line 11/0.4 kV Transformer 400 V Lines (Miles) Estimate Cost (Mil Kyats) mile Material Cost Transp- ort Cost Constru ction Cost Total kVA Trans port Cost 1 Lashio 77 3511 16781 64.42 83.746 4650 78 83.527 34.485 53.57 2 Kyaukme 61 5023 4971 21977 50.52 65.676 5220 69 129.34 49.400 46.85 3 Muse 49 4356 4370 22624 36.68 47.684 4950 74 59.200 25.900 62.72 187 12890 12852 61382 151.6 14820 221 272.07 163.1

4 Electrification Plan for Villages of Northern Shan State
(Within 2 miles from Existing 11 kV Distribution Line) To be Constructed 11 kV Distribution Line miles 400 V Distribution Line miles 11/0.4 kV Distribution Transformer 221 Nos Muse District No. of Villages Nos Household Estimated Cost (mil kyats) Kyaukme District No. of Villages Nos Household Estimated Cost (mil kyats) Lashio District No. of Villages Nos Household Estimated Cost (mil kyats)

5 Priority Electrification Plan for Lashio District (Within 2 miles from Existing 11 kV Distribution Line) No Township No; of Village To be Electrified No of House House hold Popu lation To be constructed Estimate cost (Mil Kyats) Task regional Cost for 11 kV Line 11/0.4 kV Transformer 400 V Lines (Miles) Estimate Cost (Mil Kyats) mile Material Cost Transport Cost Constru ction Cost Total kVA Trans port Cost 1 Lashio 38 1723 8097 29.62 38.506 2200 39 52.327 20.835 18.32 2 Hsenwi 15 608 2871 9.50 12.350 36.385 850 12.000 5.250 15.50 3 Tantyan 14 739 4010 13.10 17.030 50.173 950 11.200 4.900 13.25 4 Mongyal 10 441 1803 12.20 15.860 46.726 650 8.000 3.500 6.50 77 3511 16781 64.42 83.746 4650 78 83.527 34.485 53.57

6 Electrification Plan for Villages of Lashio District
(Within 2 miles from Existing 11 kV Distribution Line) HsenwiTownship No. of Villages Nos Household Estimated Cost (mil kyats) To be Constructed 11 kV Distribution Line miles 400 V Distribution Line miles 11/0.4 kV Distribution Transformer 78 Nos Lashio Township No. of Villages Nos Household Estimated Cost (mil kyats) TantyanTownship No. of Villages Nos Household Estimated Cost (mil kyats) Mongyal Township No. of Villages Nos Household Estimated Cost (mil kyats)

7 Priority Electrification Plan for Kyaukme District (Within 2 miles from Existing 11 kV Distribution Line) No Township No; of Village To be Electrified No of House House hold Popu lation To be constructed Estimate cost (Mil Kyats) Task regional Cost for 11 kV Line 11/0.4 kV Transformer 400 V Lines (Miles) Estimate Cost (Mil Kyats) mile Material Cost Transport Cost Constru ction Cost Total kVA Trans port Cost 1 Kyaukme 12 886 4054 15.60 20.280 59.748 950 9.600 4.200 10.80 2 Hispaw 10 484 481 2242 7.35 9.555 28.151 650 82.144 28.750 5.98 3 Naungcho 731 682 3416 11.00 14.300 42.130 800 10.10 4 Namtu 17 927 4317 9.50 12.350 36.385 1150 19 15.200 6.650 12.90 5 Moemate 1995 7948 7.07 9.191 27.078 1670 16 12.800 5.600 61 5023 4971 21977 50.52 65.676 5220 69 49.400 910.08 46.85

8 The additional electrification statement due to replacement
66/11 kV substation for Northern Shan State No Town ship To be Constructed The effective area (within 2 mile) Estimate Cost (millon kyats) Substation 66kV Line (mile) 33kV Line (mile) Total Villages Total House hold Total population Material Installation Total 1 Hispaw 33/11 kV 5 MVA to 66/11 kV 10 MVA with (2) bay 10 484 2242    125.3   125.3   

9 Electrification Plan for Villages of Kyaukme District
(Within 2 miles from Existing 11 kV Distribution Line) Moemate Township No. of Villages Nos Household Estimated Cost (mil kyats) To be Constructed 11 kV Distribution Line miles 400 V Distribution Line miles 11/0.4 kV Distribution Transformer 69 Nos Namatu Township No. of Villages Nos Household Estimated Cost (mil kyats) Hsipaw Township No. of Villages Nos Household Estimated Cost (mil kyats) Kyaukme Township No. of Villages Nos Household Estimated Cost (mil kyats) Naungcho Township No. of Villages Nos Household Estimated Cost (mil kyats)

10 Priority Electrification Plan for Muse District (Within 2 miles from Existing 11 kV Distribution Line) No Township No; of Village To be Electrified No of House House hold Popu lation To be constructed Estimate cost (Mil Kyats) Task regional Cost for 11 kV Line 11/0.4 kV Transformer 400 V Lines (Miles) Estimate Cost (Mil Kyats) mile Material Cost Transport Cost Constru ction Cost Total kVA Trans port Cost 1 Muse 12 1040 5394 8.20 10.660 31.406 1150 13 10.400 4.550 9.90 2 Namtkham 11 1234 6354 11.30 14.690 43.279 1450 16 12.800 5.600 14.37 3 Kukhine 22 1655 8826 16.40 21.320 62.812 2050 39 31.200 13.650 29.70 4 Kyukoke 427 441 0.78 18.648 1.014 2.987 22.650 300 6 65.018 4.800 2.100 71.918 94.568 8.75 49 4356 4370 22624 36.68 47.684 4950 74 59.200 25.900 62.72

11 Electrification Plan for Villages of Muse District
(Within 2 miles from Existing 11 kV Distribution Line) To be Constructed 11 kV Distribution Line miles 400 V Distribution Line miles 11/0.4 kV Distribution Transformer 74 Nos Muse Township No. of Villages Nos Household Estimated Cost (mil kyats) Pansai(Kyukoke) Township No. of Villages Nos Household Estimated Cost (mil kyats) Namkham Township No. of Villages Nos Household Estimated Cost (mil kyats) KukhineTownship No. of Villages Nos Household Estimated Cost (mil kyats)

12 The Statement of Fiscal Yearly Budget and Electrified Connection for Northern Shan State
Sr. No Fiscal Year State/Region Capital Budget for ESE (mil Kyats) State/Region Capital Budget for DRD (mil kyats) Electrified Connection On Grid Off Grid Total Cost for 11 kV Line & 11/0.4 TR Total Cost for 400 V Line Total Village (Nos) Consumer (Nos) 1 Estimate (BE+RE) 26 1820 260 16457 2 Estimate (BE+RE) 77 4625 242 13537 3 Budget Estimate (BE) 48 3120 508 27617 Grand Total 151 9565 1020 57611

13 Main Materials List Transported to Lashio District Office
Sr No Description Quantities Transported Site 1 11/0.4 kV Distribution Transformer 78 Lashio District, PMO Office 2 10 m Concrete Pole 3506 3 ACSR 95 mm2 134 4 11 kV, Disc Insulator with Fitting 8865 5 11 kV, Pin Insulator with Spindle 1747 6 Surge Arrestors, Disconnectors, Fuse 7 Other materials 1 Lot

14 Main Materials List Transported to Kyaukme District Office
Sr No Description Quantities Transported Site 1 11/0.4 kV Distribution Transformer 69 Kyaukme District, PMO Office 2 10 m Concrete Pole 2766 3 ACSR 95 mm2 105 4 11 kV, Disc Insulator with Fitting 1420 5 11 kV, Pin Insulator with Spindle 7083 6 Surge Arrestors, Disconnectors, Fuse 7 Other materials 1 Lot

15 Main Materials List Transported to Muse District Office
Sr No Description Quantities Transported Site 1 11/0.4 kV Distribution Transformer 74 Muse District, PMO Office 2 10 m Concrete Pole 2056 3 ACSR 95 mm2 76.26 4 11 kV, Disc Insulator with Fitting 1102 5 11 kV, Pin Insulator with Spindle 5118 6 Surge Arrestors, Disconnectors, Fuse 7 Other materials 1 Lot

16 THANK YOU