Download presentation
Presentation is loading. Please wait.
1
Protection of the Humain station
C. Marqué (ROB) & S. Ranvier (BISA)
2
Summary Wind turbine projects Mining industry Local farming
3
Wind turbines Walloon & Luxembourg prov. governments support for wind turbines “Plateau du Gerny” ranked # 4
5
Electrabel Gerny
6
Test case: Electrabel Nassogne
Response Legal base Test case: Electrabel Nassogne ITU-R RA 769-2 Emission regulations Propagation study (ITU-R ) 5 wind turbines 8-9 km south of Humain Project close to be presented to the region
7
D> 10s km
8
Mining industry Lhoist quarry near Humain 2 log-per, dual-pol. Horn
RFI monitoring station on site VLF + VHF 2 mast: 6 & 12 m 2 log-per, dual-pol. Horn 15 bands ~640 Mb/day
10
Examples
11
Farming Expansion of a dairy farm with new electrical equipment
~500 m from the station On site measurement
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.