SCE Utility Update JSIS Meeting March, 2015
2
Infrastructure Planned PMU Installations: Full coverage of all 500 kV and 230 kV substations (~80-85) Currently reporting: 3 PMUs, 6 more on schedule for this year Additional (non-WISP) PMUs: ~ PMUs All standalone devices No redundant PMUs scheduled at SCE
3
Data Management Streaming data in C37.118 at 30 frames/sec.
No substation PDCs – direct to central PDCs eDNA historian for control centers 30 days archive for high resolution data 90 days archive for 1-sec resolution data
4
Engineering Applications
Model Validation Post-Event Analysis On going project for Phasor Simulator Training tool for system operators
5
Control Room Applications
On going project with WECC for Synchro-phasor Data Validation and Conditioning On going project for LSE On going project for Grid Operators Monitoring Control Assistant Project
6
Expectations from WISP, JSIS, NASPI
Exchange of tools and applications Data availability and quality information, support with PMU issues Exchange of lessons learned Installations, applications, data management, etc.