Whole Building Retro-Commissioning at BU’s Photonics Center
March 15, 2016
2
Photonics Center Built in 1995 275,000 sq ft B-9 Floors Mixed use:
Presentation Title 5/20/2018 Photonics Center Built in 1995 275,000 sq ft B-9 Floors Mixed use: Wet labs Dry labs Clean Rooms Classrooms Offices
3
Base Case Building-wide simultaneous heating/cooling
Presentation Title 5/20/2018 Base Case Building-wide simultaneous heating/cooling High air changes per hour ( ACH) No further capacity of exhaust system on West Side 500 1st generation VAV controllers limited memory Controllers attached to 10MB Network Controllers
4
Keys to Success Buy-in from upper management
Presentation Title 5/20/2018 Keys to Success Buy-in from upper management Support from, and partner with, BU EHS Coordination of day-to-day space access
5
Technical Assistance Study
Presentation Title 5/20/2018 Technical Assistance Study Eversource funded 25% National Grid funded 25% Boston University funded 50%
6
Technical Assistance Study
Presentation Title 5/20/2018 Technical Assistance Study ECMs Identified: AHU Optimization Conference, Classroom, & Office Ventilation Reduction Lab Hood and Make-up Air Reduction Strobic Fan Motor Replacement and VFD Retrofit Boiler Controls Upgrade Chiller Plant Integration and Optimization Process Free Cooling
7
Savings Summary 2.2M kWh or 20% 90K Therms or 25% IRR +/- 25%
Presentation Title 5/20/2018 Savings Summary 2.2M kWh or 20% 90K Therms or 25% IRR +/- 25% Savings realized by going beyond “typical” RCx and incorporate “fundamental” design changes/optimizations
8
Benefits Occupant comfort Operational improvements
Presentation Title 5/20/2018 Benefits Occupant comfort Operational improvements “New” capacity for the future lab expansion