Download presentation
Presentation is loading. Please wait.
Published byPaul Maximilian Berry Modified over 6 years ago
1
AREA 001 AREA 001 –Sport Field Parking, Shaded Areas, Fence, Track, Privacy Landscaping Blue - Parking vehicles Dark Blue - Track Added around Field Green - Privacy landscaping White- Soccer/Football field Dimensions – youth soccer 220 ft x 155ft, extra irrigation White Rectangle - Practice Soccer Field Yellow - Riverbend Sports Sign And Additional Fence, Giving updates for reserved game times and privacy Orange Rectangle - watching areas and rest areas with shade Orange Line - Privacy Fence 180 ft 95 ft 321.5 ft
2
AREA 001 –Sport Field Parking, Shaded Areas, Fence, Track, Privacy
Landscaping Community Feedback: Bids: Projected Budget:
3
AREA 002 – Multi-Sport Amenities
150 ft AREA 002 AREA 002 – Multi-Sport Amenities BLUE – Golf Driving Nets and Batting Cage Nets - Fenced and Screened in Green – Putting Greens ( 4-5 Holes) extra irrigation White Rectangle - Practice area Yellow - Riverbend Sports Sign w/updates for reserved game times Red - Two basketball half courts with w/ 288 linear matching fence and Covered and key access control Purple - Sand Volleyball- 80ft x 50ft Orange - Rectangle – watching, picnic, rest areas, larger rest area shaded Parking Lot – Extended 50 ft allowing extra =24– 28 extra spaces 150 ft 80 ft 50 ft 50 ft 47 ft 47 ft AREA 002 50 ft 50 ft 50 ft
4
AREA 002 – Multi-Sport Amenities
Community Feedback: Bids: Projected Budget:
5
AREA 003 AREA 003 Current Pocket Park – projected $ 57,000 cost. Needs: Asking for bus stop bench and area for temp parking and additional landscaping to other side creating two projects on each side, needs additional assessment for cost.
6
AREA 003 AREA Pocket Park(s) Community Feedback: Bids: Projected Budget:
7
Area 004 Area 004 Dock – needs maintenance, weather proof, and Structure analysis, with any improvements, as well as a clear path to the dock with Either pavers, shells, stones to designate a safe walking path with clearing of any Brush or debris in the way. Image of entry to Dock Projected pathway to Dock Image of Dock
8
Area 004 Area 004 – Dock Maintenance, and Pathway Community Feedback: Bids: Projected Budget: Projected pathway to Dock
9
CDD Maintenance Full Time Employee
Will take all tasking from District Supervisor. Facilitates community maintenance, field maintenance, oversight of upgrades area projects, with designated golf cart with CDD Maintenance label on golf cart. Intent is to save money for community by completing smaller maintenance tasks, greens and field maintenance, small jobs in order to help the community maintain cleaner and operating environment. Assists with any community needs that can be completed without contracting. Will not overreach position and will submit work weekly metrics to District Manager in the form of an excel sheet and/or word format. Budget
10
Batting Cages and pitching tunnel Reference
11
Golf Driving Net Reference
12
Putting Green Examples Reference
13
Sand Volleyball Reference
14
Basketball Half Court Reference
15
Soccer Field Reference
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.