Presentation is loading. Please wait.

Presentation is loading. Please wait.

Scintillators and sensors

Similar presentations


Presentation on theme: "Scintillators and sensors"— Presentation transcript:

1 Scintillators and sensors
HCAL mainmeeting, 01 July 2008 Scintillators and sensors Roman Mizuk (ITEP, Moscow) Tile size tolerance MRS APD news Plans

2 Reminder: tile layout 300 tiles with matted edges have been produced.
principle of connection to PCB tile photo alignment pins matted edges (white) schematic view  Accuracy in alignment pins is adequate for firm connection to PCB. Slide1 300 tiles with matted edges have been produced. For 100 tiles we measured sizes ( tolerance, important for PCB design)

3 Tolerance: pin diameter, tile thickness
All sizes in mm. systematic uncertainty ~0.03mm Statistics of 100 tiles. Slide1  High accuracy in pin diameter and position.  ~100 μm increase of tile thickness at edges after matting.

4 Tolerance: tile size Statistics of 100 tiles.
All sizes in mm. systematic uncertainty ~0.03mm Statistics of 100 tiles. Slide1  R.M.S. of tile size distribution ~50μm.  spread <200μm.

5 Tolerance: pin position
All sizes in mm. systematic uncertainty ~0.03mm Statistics of 100 tiles. Slide1  R.M.S. of pin position distribution ~40μm.  spread <150μm.  Input for design of PCB.

6 Sensors: reminder NEW: MRS APD from CPTA  low x-talk (~3.6%)
556 cells (dynamic range) NEW: MRS APD from CPTA   Working point 15p.e. → 10p.e. for 30x30x3mm2 tile. MRS APD parameters at Np.e.=10 Noise frequency at 5 pixel threshold is below 100Hz. 4x105 300 MRS APD (transistor package) were tested. Slide1 300 MRS APD (rectangular package) ordered.

7 Status of MRS APD delivery, plans
Delivery of rectangular type MRS APD expected end of May – delayed. h Currently producer is cutting extra height. Delivery of first 150 MRS APD promised this week. Milling hole for sensor in tiles – wait for MRS APD delivery (tolerances). First fully equipped tiles can be ready in ~3 weeks. Slide1 Order new casting form with changed layout of alignment pins and hole for sensor – wait for MRS APD delivery (tolerances).


Download ppt "Scintillators and sensors"

Similar presentations


Ads by Google