Presentation is loading. Please wait.

Presentation is loading. Please wait.

2015 BIA Transportation Projects Wisconsin Tribes

Similar presentations


Presentation on theme: "2015 BIA Transportation Projects Wisconsin Tribes"— Presentation transcript:

1 2015 BIA Transportation Projects Wisconsin Tribes

2 Contracting Process Tribal Transportation Program Funds and Contract Authority at Tribe Work directly with each respective Tribe since they solicit and award projects respectively Other activities Tribes may look to contract: Preliminary Engineering Construction Engineering Materials Testing Transportation Planning Road Maintenance

3 Forest County Potawatomi
Red Cliff Wisconsin Tribes Bad River Lac du Flambeau Lac Courte Oreilles St. Croix Mole Lake Forest County Potawatomi Stockbridge Munsee Menominee Ho Chunk (Witt) Oneida Ho Chunk (BRF) Ho Chunk (Tomah) Ho Chunk (Dells)

4 Gerald.Warrington@ fcpotawatomi.gov
Tribal Contacts Tribe Contact Phone Bad River Ben Connors Lac Courte Oreilles Marie Kuykendall Lac du Flambeau Emerson Coy Oneida Mike Finn Forest County Pot Gerald Warrington fcpotawatomi.gov Red Cliff Jeff Benton ext 234 Ste. Croix Reuben Buck Mole Lake Charlie Van Zile Stockbridge-Munsee Willie Miller Ho Chunk Garrett Blackdeer Menominee Ken Klemens

5 2015 Construction Projects
(1 of 3) Lac Courte Oreilles LCO Trails Construct 2.1 miles of trail Grade, Drain, Base, & Pave $ 600,000 Larsen Road Resurface Base & Pave $ 150,000 Red Cliff Community & Pike Roads Reconstruct 1 mile Drain, Base & Pave $ 600,000 Blueberry Road/Culvert Culvert Road & approach work $ 750,000 Rowley Road Bridge Bridge $ 500,000 Watertower Road Reconstruct ½ mile $ 200,000 Bad River Pine Flats Road Rehabilitate 6.5 miles Drainage and Aggregate $ 1,000,000 Graveyard Creek (ERFO) Reconstruct storm damage $ 150,000 Cemetery Road Rehabilitate 0.7 mile road Base and Pave $ 200,000 St. Croix 215th Avenue Reconstruct 0.2 miles Grade, Drain, Base, & Pave $ 100,000 Danbury Frontage Road

6 2015 Construction Projects
(2 of 3) Forest County Potawatomi Everybody’s Road Construct 2.1 miles of new trail Grade, Drain, Base, & Pave $ 950,000 Air Monitoring Road Reconstruct 0.5 mile $ 130,000 Lac du Flambeau Sugarbush Trail Resurface 1.6 mile Pulverize & Pave $ 400,000 Whitefeather Road Reconstruct 0.1 mile Drain, Base & Pave $ 75,000 Rusty Lane Reconstruct .2 mile $ 100,000 Leach Lane Reconstruct .5 mile Drain, Grade, Agg Base $ 200,000 Thorofare Reinforce Reconstruct 0.5 mile Base & Pave $ 300,000 Menominee Old South Branch Road Reconstruct 5.5 miles Grade, Drain & Base $ 550,000 Neopit Street Repairs Pulverize and repave streets $ 420,000 Zoar Street Repairs $ 140,000 Reconstruct Parking Areas Base & Pave $ 250,000 Mole Lake Pow Wow Grounds Reconstruct 0.2 miles Grade, Drain, Base, & Pave $ 100,000 Stockbridge-Munsee Schoolhouse Road Reconstruct existing road Pulverize & Pave $ 900,000

7 2015 Construction Projects
(3 of 3) Ho Chunk (BRF) Wazee Access Road New access road Clear, Drain, Base $ 150,000 Lowe Avenue Rehabilitate existing road Base and Pave $ 200,000 Morrison Road Culvert/Base and Pave $ 500,000 Kirsch Road Drain, Base and Pave $ 600,000 Wazee Subdivision Construct new roads Grade, Drain, Base & Pave $ 1,000,000+ Ho Chunk (Wittenberg) Robin Road Reconstruct 1 mile Grade, Drain, Base & Pave $ 700,000 Mo Ra Je Ga Road Reconstruct .2 miles of Rd/Trl $ 400,000 Ho Chunk Coops CTH P – Jackson County Reconstruct existing road $ 860,000 CTH BC – Monroe County $ 100,000 Ho Chunk Lumberjack Guy Road Reconstruct existing road Grade, Drain, Base & Pave $ 400,000 Crockett’s Resort Drain, Base, & Pave

8 Forest County Potawatomi
Red Cliff Bad River Lac du Flambeau Lac Courte Oreilles St. Croix Mole Lake Forest County Potawatomi QUESTIONS Stockbridge Munsee Menominee Ho Chunk (Witt) Oneida Ho Chunk (BRF) Ho Chunk (Tomah) Ho Chunk (Dells) Dave O’Donahue


Download ppt "2015 BIA Transportation Projects Wisconsin Tribes"

Similar presentations


Ads by Google