Status and plans for FESAC TEC report
R. Maingi, PPPL A. Lumsdaine, ORNL FESAC TEC Panel Executive Session PPPL, Princeton, NJ 19 July 2017
2
Community Input Meetings – Panel Q/A Sessions
Three meetings have been planned for community input: May 30-June 1, 2017 (Rockville, MD): Community input meeting for Plasma Diagnostics, Actuators, and Control sub-panel, and also for Reactor and Balance of Plant sub-panel; workshop starts at 9 AM on 5/30 and ends by 6 PM on 6/1. June 20-22, 2017 (Chicago, IL): Community input meeting for Plasma-Materials Interaction sub-panel; workshop starts at 1 PM on 6/20 and ends by 5 PM on 6/22. July 19-21, 2017 (PPPL, Princeton NJ): Final workshop for all three sub-panels; one day of community input time; workshop starts at 1 PM on 7/19 and ends by 5 PM on 7/21. Final panel face-to-face on Sept. 6, 2017 (TBD: FES or Chicago?)
3
Present status Determine which areas are missing from what you have heard, and select top 4 talks you’d like to hear at PPPL, including invited and contributed talks Work within your subpanel before PPPL meeting to consolidate the talks and white papers into TEC elements – target 3-6 total TEC elements from each sub-panel, including elements that may not qualify as “most promising” TEC We’ll target 5-10 “most promising” TEC elements in the final write-up Evaluate the TEC elements above as a subpanel, using the Lumsdaine rubric as a tool, and prepare to present your subpanel’s position on which ones are/are not TEC to the entire panel at the PPPL workshop, 7/19-21 Finalize your sub-panel’s position during parallel sessions on Thu. PM
4
Panel-wide deliberations on TEC elements – Begins Thursday afternoon
30 min. panel-wide discussion on what constitutes a “transformative enabling capability” (TEC) element White’s subpanel presents their findings on TEC elements Subpanel discussion and feedback: up to 3 hours Use straw votes as necessary to identify panel views Break up into parallel groups on Thursday afternoon/evening for Allain & Greenfield sub-panels to agree on TEC elements Dinner on Thursday night is flexible – if subpanels need to continue working later, we will order pizza to lab Allain and Greenfield subpanels should converge on their presentation of TEC elements; presentations begin Friday morning
5
Panel-wide deliberations on TEC elements – Friday
Allain and Greenfield finish presenting their panel findings on Friday by 2 PM (about 3 hours each) Tentatively starting at 8 AM, but may move back to 8:30 Working lunch delivered to Director’s Conference Room at noon Discussion of TEC elements with variability of opinion from 2-3:30 Writing assignments from 3:30-4:30 During the writing period, authors need to take into account Evaluate whether the community input obtained at PPPL meeting contributes to an existing TEC element or a new one No new TEC elements considered after 7/21/17, but subpanels can have telecons obtaining additional community input for 3 weeks, until 8/11/17 – need to decide if this is really needed Identify cross-cuts and synergies between TEC elements from all 3 subpanels Assess which TEC elements advance both stellarators and tokamaks Assess international activity and potential US leadership areas as requested in charge
6
Process and Schedule Report structure: background section on “Grand Challenges” – three sections, one from each subpanel Include discussion of “enabling” parts of the (existing) program TEC elements in separate chapters – includes answers to the questions we posed to the community participants Possible tiers: “Most promising” and “Promising” Chapter on cross-cuts: Innovations that require another improvement to be used, and Innovations that touch multiple parts of a fusion power plant (e.g. core, boundary, BOP) Details of final panel face to face discussion on 9/6/17 will be determined by how far we get at this meeting Goal is to have a written first draft of the chapters FESAC meeting to be scheduled as we get closer to write-up (30 days notice required) Draft schedule next page
7
Rough Time Table 7/21/17 (– 7/28/17): writing assignments
9/6/17 – first draft of chapters 10/6/17 – final report written 11/13-11/17 – FESAC meeting (earliest possible schedule) Detailed schedule announced on 7/21/17, depending on progress