Download presentation
Presentation is loading. Please wait.
1
General / Administrative
4:30-6pm, 13 August 2007 Hiro Kishimoto OGSA-WG #18 Interim F2F Fujitsu Sunnyvale campus, CA
2
OGF IPR Policies Apply “I acknowledge that participation in this meeting is subject to the OGF Intellectual Property Policy.” Intellectual Property Notices Note Well: All statements related to the activities of the OGF and addressed to the OGF are subject to all provisions of Appendix B of GFD-C.1, which grants to the OGF and its participants certain licenses and rights in such statements. Such statements include verbal statements in OGF meetings, as well as written and electronic communications made at any time or place, which are addressed to: the OGF plenary session, any OGF working group or portion thereof, the OGF Board of Directors, the GFSG, or any member thereof on behalf of the OGF, the ADCOM, or any member thereof on behalf of the ADCOM, any OGF mailing list, including any group list, or any other list functioning under OGF auspices, the OGF Editor or the document authoring and review process Statements made outside of a OGF meeting, mailing list or other function, that are clearly not intended to be input to an OGF activity, group or function, are not subject to these provisions. Excerpt from Appendix B of GFD-C.1: ”Where the OGF knows of rights, or claimed rights, the OGF secretariat shall attempt to obtain from the claimant of such rights, a written assurance that upon approval by the GFSG of the relevant OGF document(s), any party will be able to obtain the right to implement, use and distribute the technology or works when implementing, using or distributing technology based upon the specific specification(s) under openly specified, reasonable, non-discriminatory terms. The working group or research group proposing the use of the technology with respect to which the proprietary rights are claimed may assist the OGF secretariat in this effort. The results of this procedure shall not affect advancement of document, except that the GFSG may defer approval where a delay may facilitate the obtaining of such assurances. The results will, however, be recorded by the OGF Secretariat, and made available. The GFSG may also direct that a summary of the results be included in any GFD published containing the specification.” OGF Intellectual Property Policies are adapted from the IETF Intellectual Property Policies that support the Internet Standards Process. IPR Notices Note Well for OGF meetings 2
3
Agenda Early discussion (10 min) Strategy (30 min) Schedule (20 min)
Note taker assignment Agenda bashing Strategy (30 min) Document status review Resource allocation for ’07 2nd Harf Schedule (20 min) OGF21 and F2F Telephone call Management (30 min) OGSA-WG leadership Action Item management tool Group dinner plan 3
4
Document Status Review
5
Documents under Public Comment Review
Execution Environment and Basic Execution Service Model in OGSA™ Grids PC ends 10 Sep, 2007 Reviewers: BES-WG, DMTF, GLUE-WG, RM-WG, JSDL-WG, HPCP-WG Guidelines for Information Modeling for OGSA™ Entities Reviewers: Hiro, Ellen, GLUE-WG, RM-WG, JSDL-WG, BES-WG, DMTF 5
6
Document schedule (1) Document name Milestones Current Plan New
OGSA roadmap v1.1 First draft Nov. 2006 Ready for PC Aug. 2007 Publication Nov 2007 completed delayed 6
7
Document schedule (2) Document name Milestones Current Plan New
OGSA EMS Architecture scenarios 1.1 First draft TBD Nov. 2007 Ready for PC Feb. 2008 Publication Apr. 2008 Pending completed delayed 7
8
Document schedule (3) Document name Milestones Current Plan New
Guidelines for Information Modeling for OGSA Entities (explain necessary process) GFD-I First draft Jan. 2006 Ready for PC July 2007 Publication Sept. 2007 Oct. 2007 Execution environment and BES model (GFD-I) OGSA™ information modeling architecture (GFD-I) Jan. 2008 March 2008 8
9
Document schedule (3) Document name Milestones Current Plan New Information Modeling in OGSA XML schema and semantics Best practices GFD-R.P Also wiki page First draft End of May for a date Ready for PC Aug. 2007 Publication Dec. 2007 Information model profile document (BES container) Proof of concept March 2007 TBD Revisit in Aug. The 1st document (including wiki) should be superseded by GLUE 2.0 Current BES document and BES model document covers the 2nd one 9
10
Document schedule (4) Document name Milestones Current Plan New
Security Use-Cases for Grid Architectures First draft May 2007 Ready for PC Oct. 2007 Publication Jan. 2008 OGSA Security Profile 2.0 - Secure Addressing - Secure Transport - Secure SOAP 10
11
Document schedule (5) WSRF BP and SP are in single document
Document name Milestones Current Plan New Interoperability Testing for OGSA Profiles First draft TBD Jan. 2008 Ready for PC March 2008 Publication May 2008 WSRF BP and SP are in single document Naming is under discussion completed delayed 11
12
Document schedule (6) Document name Milestones Current Plan New
OGSA workflow community practice First draft TBD Ready for PC Publication OGSA Service Level Terms community practice completed delayed 12
13
Resource allocation for ’07 2nd Half
14
Tasks: Close to complete
Glossary Monday Jem Treadwell Submit to OGF editor by the end of Aug. Roadmap Monday Chris Jordan 14
15
Tasks: Full Speed Security - Monday Info/data modeling - Thursday
Express AuthN Profiles Duane Merrill and Andrew Grimshaw Joint calls with OGSA-AuthZ-WG and OGSA-AuthN-WG Info/data modeling - Thursday Ellen Stokes OGSA Profile interop – Thursday ad hoc David Snelling Information Service interface - Thursday Laurence Field, Felix Ehm, Adrian Toth OGSA primer - Thursday Andrew Grimshaw 15
16
Tasks: Taking off OGSA workflow - Thursday
Steven McGough Service Level Terms - Thursday Steve McGough and Andrew Grimshaw EMS scenario Monday Steven Newhouse 16
17
OGF21 and F2F meetings
18
OGF21 sessions Oct. 15-18 at Grand Hyatt Seattle
Five sessions (all 90 minutes) requested OGSA profiles Interop Info/data modeling Express Authentication Profiles Workflow Information Services 18
19
OGF21 F2F meeting Oct. 19 (Fri) at Microsoft Redmond Campus
Logistics Info TBD Full day (9am-5pm) meeting Draft agenda OGSA primer EMS scenario 1.0+ Service Level Term General / Logistics Overflow from OGF21 sessions 19
20
2007 Winter F2F (OGSA-19) November or early December? Related event
SC07: Nov in Reno MDC: Dec. 3-6 in Santa Clara … Dec in California Jan. 7-9 in London (IC or FLE) 20
21
Telecon schedule
22
Proposal on Google Calendar
22
23
Management issues
24
OGSA leadership 24
25
Action Item Management Tool
25
26
Group dinner plan Tuesday, 14 Aug Suggestions?
7- Mexican: Pedro's, $$, 4 min, 0- Chinese: Chef Chu, $$, 14 min, 0- Brewer: Fault line, $$, walking distance, 0- American: Hungry Hunter, $$, 16 min, 4- Italian: Piatti - Santa Clara, $$$, 7min, 4- Mediterranean: Zibibbo, $$, 19 min, 6- See food: Fish Market, $$, 5 min, 3- Brazilian 26
27
Full Copyright Notice Copyright (C) Open Grid Forum (2007). All Rights Reserved. This document and translations of it may be copied and furnished to others, and derivative works that comment on or otherwise explain it or assist in its implementation may be prepared, copied, published and distributed, in whole or in part, without restriction of any kind, provided that the above copyright notice and this paragraph are included on all such copies and derivative works. The limited permissions granted above are perpetual and will not be revoked by the OGF or its successors or assignees. OGF Full Copyright Notice if necessary 27
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.